OPERATIONAL MANUAL
4
25
�
The unit is designed for
12V ,
negative ground operation system
only. Before installing the unit,
make sure your vehicle is
ed to DC 12V negative
tem.
DC
connect-
ground sys-
�
Be sure to connect the color coded
leads according to the diagram.
Incorrect connections may cause
the unit to malfunction or damage
,
the vehicle s electrical system.
�
Do not block vents or radiator n-
els. Blocking them will cause
to build up inside and may
fire.
pa
heat
result in
�
After completing the installation
beginning to play the unit,
replacing the battery),
RESET
button on the base with pointed
as ball-point pen) to
initial status.
and
(including
press
object
(such
set the unit
to
Notes on Installation
�
When replacing the fuse(s), the
placement must be of the same
perage as shown on the fuse
re-
am-
holder.
�
Make sure all the connections are
before turning
on your unit.
completely correct
Installation Method 2
OPERATIONAL MANUAL
Install the Unit
Installation Method 1
Installation Method 2
2
3 4
Bend these claws
outward for a tight fit,
if necessary.
Front Wall of
the Cab
To support the unit
1
6
SCREW
SCREW
TRANSPORT SCREW
SCREW
SCREW
TRANSPORT SCREW
SCREW
1
1
4
Page
24
Содержание DVD2100
Страница 1: ......