background image

DVB7 Series Direct Vent Gas Fireplace

54D7051

57

RePlACeMeNt PARtS

 

Description 

Model Number

  Horizontal Vent Termination Kits  Up and Out Side Wall Termination Kit, includes 1” to 16”  

7TBLSCTK   

   

Adjustable Termination Pipe, 90° Elbow, Firestops and 

 

 

 

   

Cool Touch Termination w/Siding Shield, Additional 1”  

 

 

 

   

Section Provided for Min. Vertical Rise. FOR DVBL ONLY

   

Rear Vent Hot Touch Termination Kit w/ 10" to 16"  

7TBRHTK 

 

   

Adjustable Termination Pipe, Firestop, and Hot Touch 

 

 

 

   

Termination w/ Siding Shield

   

Up and Out Side Wall Termination Kit w/ 10" to 16"  

7TDVSCTK   

   

Adjustable Termination Pipe, 90° Elbow, Firestop, and  

 

 

 

   

Cool Touch Termination w/ Siding Shield

   

Rear Vent Cool Touch Termination w/ Siding Shield for  

7TRVCT/8 

 

   

Straight-out Applications and Firestop - 8 pack

   

Rear Vent Hot Touch Termination w/ Siding Shield for 

7TRVHT/8 

 

   

Straight-out Applications and Firestop - 8 pack

   

Termination Guard for 7" T.L. Rear Vent Hot Touch 

7TRVTG 

 

   

Terminations (7TRVT/7TSVKT)

   

Snorkel Termination 

7TDVSNORK

   

7" T.L. DVRTSB Termination Screen Guard 

7TBSG

   

Up and Out Starter Kit w/ 40" Flex Pipe, Firestop, Cool 

7FDVSCTK   

   

Touch Termination w/ Siding Shield, and  ea. Clamp 

 

 

 

   

Bands

  Twist Lock Pipe 

0" Termination Pipe - 8 pack 

7TDVP0/8

   

10" - 16" Adjustable Termination Pipe - 4 pack 

7TDVPA/4

   

1" - 18" Adjustable Vent Length  

7TDVP118

   

35" - 64" Adjustable Vent Length 

7TDVP3564

   

8" Vent Pipe - 4 pack 

7TDVP8/4 

   

1" Vent Pipe - 4 pack 

7TDVP1/4

   

4" Vent Pipe - 4 pack 

7TDVP4/4

   

36" Vent Pipe 

7TDVP36

   

36" Vent Pipe - 30 pack 

7TDVP36/30

   

48" Vent Pipe 

7TDVP48

   

48" Vent Pipe - 30 pack 

7TDVP48/30

  Twist Lock Elbows 

45° Elbow for Vertical/Horizontal Offset 

7TDV45

   

45° Elbow for Vertical Offsets - 8 pack 

7TDV45/8

   

90° Elbow for Vertical/Horizontal Offset 

7TDV90

   

90° Elbow for Vertical/Horizontal Offset - 8 pack 

7TDV90/8

  Shields and Supports 

1" Firestop 

7DV1FS

   

3" Firestop 

7DV3FS

   

1" Attic Insulation Shield 

7DV1AIS

   

Combination Horizontal Offset/Roof Support 

7DVCS

584B
Vent components
Starter Kit
2/25/99   djt

584D
Vent Components
90 degree elbow
2/25/99   djt
10/20/99 twist lock

584C
Vent components
45 degree elbow
2/25/99   djt
10/20/99 twistlock

584G
Venting Components
Firestop spacer
2/25/99   djt

584H
Venting components
attic insulation shield
2/25/99   djt

584I
vent components
offset support
2/25/99   djt

hoRIZoNtAl VeNtING

584E

Venting Components

Telescope vent

2/25/99   djt

10/20/99 twist lock

584F

Venting Components

Pipe sections

2/25/99   djt

10/20/99 twist lock

Содержание 300DVBNV7

Страница 1: ...l For assistance or additional information consult a qualified installer service agency or the gas supplier This appliance may be installed in an aftermarket permanently located manufactured home USA...

Страница 2: ...Wiring Signature Command System 33 Junction Box Wiring 33 Command Center Wall Installation 33 Wall Switch Installation 33 Signature Command Wiring Diagram 34 Optional Fan Blower Systems 35 BLOTSC Sig...

Страница 3: ...or propane LP fireplace do not place propane LP supply tank s inside any structure Locate propane LP supply tank s outdoors To prevent performance problems do not use propane LP fuel tank of less than...

Страница 4: ...noises during the start up or cool down cycle Similar noises are found with your furnace heat exchanger or car engine IMPORTANT PLEASE READ THE FOLLOWING CAREFULLY It is not unusual for gas fireplaces...

Страница 5: ...ropane LP Inlet Minimum 4 5 w c 11 0 w c Inlet Maximum 10 5 w c 13 0 w c Manifold Pressure 3 5 w c 10 0 w c Gas Specifications ORIFICE SIZE Max Input Min Input Orifice Model Fuel BTU h BTU h Size 300D...

Страница 6: ...841 mm 33Z 841 mm K 2Z 54 mm 1Z v 32 mm 1Z v 32 mm 1Z v 32 mm L 1Z x 38 mm 2Z x 64 mm 2Z x 64 mm 2Z x 64 mm M 15 16 24 mm 15 16 24 mm 15 16 24 mm 15 16 24 mm N 31B 803 mm 34C v 883 mm 34C v 883 mm 34...

Страница 7: ...ust be main tained This fireplace may be installed along a wall across a corner or use an exterior chase Refer to Figure 3 for suggested locations Location should be out of high traffic areas and away...

Страница 8: ...71 Minimum 11 Minimum 12 Max Min 4 From Either Side Wall FP2248 mantel clearances Figure 4 Clearances Ceiling Combustible Mantel 5 7 11 3 12 8 6 2 FP2204a mantelclearances Wall Stud Standoff FP2204 T...

Страница 9: ...for framing or header Framing Nailing Flange Screws Nailing Flange FP2094a Figure 6 Secure Fireplace to Floor and Framing Studs Finishing Material NOTE Any remote wiring i e remote control wall switch...

Страница 10: ...d gasket Figure 7 WARNING After conversion to top vent configuration the 4 102 mm flue pipe should be concentric within the 6B 175 mm outer collar within 1 4 FP1991 remove screws Screws Flue Pipe Cove...

Страница 11: ...here rigid direct vent components can be used All restrictions clearances and allowanc es that pertain to the rigid piping apply to the flexible venting Flex kits may not be modified Flex kits may be...

Страница 12: ...ssembly above the meter regulator assembly 5 m above the meter regulator assy I Clearance to service regulator vent outlet 3 91 cm 3 91 cm J Clearance to nonmechanical air supply inlet 6 15 cm for app...

Страница 13: ...minimum of 3 914 mm below the termination cap 3 All gravity air intakes within 3 914 mm of a termination cap must be a minimum of 1 305 mm below the termination cap General Information Assembling Vent...

Страница 14: ...following vent installation instructions to determine the re lationship between the vertical and horizontal dimensions of the vent system 1 Determine the height of the center of the horizontal vent pi...

Страница 15: ...side wall A minimum 1 clearance all around the flue is acceptable at this point of penetration If vertical rise is 7Z x feet or higher when top venting the clearance to combustibles is 1 on all sides...

Страница 16: ...re 17 Noncombustible Walls Hole opening should be 7Z x 191 mm diameter Step 2 Secure firestop to the inside frame center in the 9B x 9B vent opening VO584 100 Vent Opening 2 99 djt Vent Opening for Co...

Страница 17: ...center ringed flue restrictor must be installed onto the top edge of the firebox flue adapter To create this open center restrictor twist and break off the center rib of the supplied flue restrictor...

Страница 18: ...nstallation Max 20 36 914 mm Max 36 914 mm Max FP1177 Figure 23 Maximum horizontal run with no rise Example According to the vent graph Page 14 the maximum horizontal vent length in a system with a 7Z...

Страница 19: ...m Min Step 2 Secure firestop to the inside frame center in the 9B x 9B vent opening Step 3 Place fireplace into position Measure the vertical height X required from the base of the flue collars to the...

Страница 20: ...spring to approximately 15 381 mm wrap the spring around the pipe and interlock the ends of the spacer spring approximately 2 51 mm Measure 6C v 172 mm from the end of the pipe Place the next spring...

Страница 21: ...seal is made around the vent pipe coming through the wall 5 Apply high temperature sealant caulking supplied around the 4 and 7 snorkel collars BG402a Top Vent Below grade installation Firestop Screws...

Страница 22: ...op edge of the firebox flue adapter Figure 36 1 Locate your fireplace 2 Plumb to center of the 4 flue collar from ceiling above and mark position 3 Cut opening equal to 9C v x 9C v 248 x 248 mm 4 Proc...

Страница 23: ...iling support apps Typical Roof Support Application Typical Ceiling Support Application FP1184 Figure 38 Venting Supports 2 ft Min 2 ft Min X 12 H FP1971 Min chimney clearance Termination Vent Storm C...

Страница 24: ...n certified equipment shutoff valve with 1 8 NPT tap is an acceptable alternative to test gauge connection Purchase the CSA design certified equipment shutoff valve from your dealer For propane LP con...

Страница 25: ...the gas to the fireplace Check your building codes for any special requirements for locating equipment shutoff valve to fireplaces Apply pipe joint sealant lightly to male threads This will prevent e...

Страница 26: ...aking pressure reading be sure and turn captured screw clockwise firmly to reseal Do not over torque Check test points for gas leaks Electrical Wiring This fireplace will work without any electrical s...

Страница 27: ...the wall switch wire length provided NOTE Extended lengths of wire may cause the fireplace not to function properly Longer length of wire is permitted if the wire is made out of larger gauge diameter...

Страница 28: ...cover by removing the screw from the left side of the outside firebox wall Junction box was installed at the factory 3 The junction box cover has a factory installed romex style strain relief connecto...

Страница 29: ...a qualified service technician Force or attempted repair may result in a fire or explosion D Do not use this appliance if any part of it has been under water Immediately call a qualified service techn...

Страница 30: ...t period of time when the magnet is closed it is possible to start the lighting operation The gas control knob is designed to be operated by hand DO NOT use any tools during this operation Damaged kno...

Страница 31: ...lace This switch allows you to turn on and to turn off the main burner without using the gas valve knob Make sure the button is in the ON position to light the main burner Figure 47 Lighting the burne...

Страница 32: ...leaks General 1 This fireplace is equipped with the Signature Control valve which operates on 6 volts The 6 volt DC adapter plugs into the fireplace junction box A C power supply Four 4 AA batteries a...

Страница 33: ...Do not extend beyond the 15 ft wire cable provided If a longer distance is required the 15 ft may be extended up to 30 ft maximum by using two 2 SCSWEK cables plugged together Route the wire from jun...

Страница 34: ...nsor Ignitor Sparker Conversion NG LP Plug in Connector Control Board to Command Center OFF LO LED ON HI Master Switch Command Center Optional Wall Switch Plug in Connector Stepper Motor to Control Bo...

Страница 35: ...e control will not work correctly WARNING Electrical connections should only be performed by a qualified licensed electrician Main power supply must be turned off before connecting the fan to the main...

Страница 36: ...MANUAL BLOWER 1 This must be done before framing the fireplace When installing the FK 12 blower a wall switch control must be installed to control the blower 2 The fireplace power supply is wired thr...

Страница 37: ...Follow the gas supplier s instructions If you cannot reach your gas supplier call the fire department C Use only your finger to push in the master switch Never use tools If the switch will not func t...

Страница 38: ...smell gas go to next step 4 Press the master switch to the ON position Within eight 8 seconds it will beep once This indicates the system is ready 5 Press ON button Sparker will spark and pilot flame...

Страница 39: ...X X Low battery Indication for Transmitter X X X X X Child Proof Lock out X X X X X LCD Backlight X X X X X Security Codes 16 X X X X X Countdown 6 hr Timer X X X Standard Thermostatic Control Mode X...

Страница 40: ...attended You may disable this feature if you wish NOTE By disabling this feature your fireplace may continue to operate unattended 2 When the master switch is in the ON position pressing the ON button...

Страница 41: ...then Off 3 Hold the OFF button anytime for three seconds or by turning off the wall switch These two commands of OFF are Memory Off the system will remember all last settings before turning off The n...

Страница 42: ...place 3 Set glass frame aside FP2104a BDV remove glass FP2104 Figure 58 Remove Glass Frame Glass Frame Three Tabs Clamps Two 2 on 300 400 Units Three 3 on 500 600 Units WARNING Each clamp has a quick...

Страница 43: ...firmly on the two log mounting pins on the bars 2 Place bottom left log 2 on grate Rest the back side of the log in the flat area of the rear log 3 Place bottom right log 3 on grate Rest the back side...

Страница 44: ...er reaching to the main burner burner Inspect area around the injector Remove any lint or foreign material with a brush or vacuum Burner Flame The flames from the burner should be visually checked as...

Страница 45: ...ials may be used Handle glass door with care to avoid striking or scratching it on hard objects To clean glass door follow Glass Removal procedure outlined in the Final Installation section Film depos...

Страница 46: ...the thermocouple connec tion at the gas valve is fully inserted and tight Disconnect the thermocouple from the valve place one millivolt lead wire on the tip of the thermocouple and the other meter le...

Страница 47: ...just the pilot flame for maximum flame impingement on thermocouple A Check for flue product leak Replace defective pipe section B Check horizontal venting piping is running upward 1 4 per foot Do not...

Страница 48: ...hrough Battery polarity wrong LED on the Command Center does not show solid green The 5 pin connector on the AC board broken or bent AC plug is plugged to AC mains Battery voltage low Using battery Ch...

Страница 49: ...DVB7 Series Direct Vent Gas Fireplace 54D7051 49 REPLACEMENT PARTS 1 2 3 5 6 7 8 10 4 9 540701 DVB parts FIREBOX COMPONENTS...

Страница 50: ...D0006 93D0006 93D0006 Accessories Field Installed Options 2 Brass Louver 1 L30BR L32BR L36BR L42BR 2 Pewter Louver 1 L30PW L32PW L36PW L42PW 5 6 7 Firebrick Walls Cottage Clay 1 FB300CCW FB400CCW FB50...

Страница 51: ...DVB7 Series Direct Vent Gas Fireplace 54D7051 51 REPLACEMENT PARTS STANDING PILOT MILLIVOLT CONTROL 1 2C 2I 2T 2 4 5 6 3 8 9 7 10 11 12 13 14 540701 DVB millivolt parts...

Страница 52: ...D6046 23D6046 5 Rocker Switch 1 41D0048 41D0048 41D0048 41D0048 41D0048 41D0048 41D0048 41D0048 6 Piezo Igniter 1 14D0503 14D0503 14D0503 14D0503 14D0503 14D0503 14D0503 14D0503 7 Injector 1 62D3006 2...

Страница 53: ...DVB7 Series Direct Vent Gas Fireplace 54D7051 53 REPLACEMENT PARTS 1 2 3 4 20 5 6 7 8 9 13 14 15 16 17 540701 SC parts 12 SIGNATURE COMMAND SYSTEM...

Страница 54: ...119 69D1026 69D1119 69D1026 10 Wire Valve Control not shown 1 80D0010 80D0010 80D0010 80D0010 80D0010 80D0010 80D0010 80D0010 11 Wire Command Ctr Control Box 2 1 80D0008 80D0008 80D0008 80D0008 80D000...

Страница 55: ...3 4 540701 DVB log parts Ref Description Qty 300DVB 400DVB 500DVB 600DVB 1 Rear Log 1 1 54D0122 54D0117 54D0331 54D0331 2 Bottom Left Log 2 1 54D0123 54D0118 54D0358 54D0358 3 Bottom Right Log 3 1 54...

Страница 56: ...Vent Pipe 4 pack 7TDVP24 4 36 Vent Pipe 7TDVP36 36 Vent Pipe 30 pack 7TDVP36 30 48 Vent Pipe 7TDVP48 48 Vent Pipe 30 pack 7TDVP48 30 Twist Lock Elbows 45 Elbow for Vertical Horizontal Offset 7TDV45 45...

Страница 57: ...on w Siding Shield and 2 ea Clamp Bands Twist Lock Pipe 20 Termination Pipe 8 pack 7TDVP20 8 10 16 Adjustable Termination Pipe 4 pack 7TDVPA 4 12 18 Adjustable Vent Length 7TDVP1218 35 64 Adjustable V...

Страница 58: ...omply with the above requirements provided however that during said thirty 30 day period a battery operated carbon monoxide detector with an alarm shall be installed Massachusetts Residents Only Pleas...

Страница 59: ...ed Lifetime Warranty will also be void if the appliance is not operated and maintained according to the operating instructions supplied with the appliance and does not extend to 1 firebox burner assem...

Страница 60: ...DVBPV7 53 8 300DVBNSC7 61 8 300DVBPSC7 55 7 400DVBNV7 58 4 400DVBPV7 58 5 400DVBNSC7 61 1 400DVBPSC7 60 7 500DVBNV7 58 7 500DVBPV7 58 8 500DVBNSC7 61 3 500DVBPSC7 60 8 600DVBNV7 58 4 600DVBPV7 58 5 60...

Отзывы: