![Majestic 24DBXC Series Скачать руководство пользователя страница 19](http://html1.mh-extra.com/html/majestic/24dbxc-series/24dbxc-series_installation-and-operating-instructions-manual_696116019.webp)
33D4051
19
H
J
Nail Sides
Through Nailing
Flanges
1. Bend out the nailing flanges located on each side of the firebox.
2. Slide the firebox into prepared framing or position firebox in its final position and frame later.
3. Level the firebox by checking the top edge of the firebox. Shim if necessary.
4. Anchor firebox to the side framing members using 8d nails or other suitable fasteners.
See Figure 26.
5. The canopy must be installed for safe operation of the heater.
See page 14
for canopy installation details.
When finishing a custom cabinet, mantel, or other built-in enclosure,
the opening size to accommodate the fireplace with trim installed is
as follows:
FIREPLACE FRAMING
24VFSC w/ trim
24DBXC w/ trim
32VFSC w/trim
H
25 "
25"
3
13
/
16
"
J
6
3
/
4
"
6
3
/
4
"
31
1
/
4
"
Figure 25 - Custom Cabinet
Figure 26 - Location of Nailing Flanges
W
ARNING
The fireplace must be installed giving full
consideration to the clearance and height
requirements identified in this manual.