background image

9

BFC36 Balance Flue Heat-Circulating Fireplace

7412647

Offset Installation

In order to clear an obstruction, it may be necessary to 
offset chimney from vertical. This is accomplished by 
using elbows. Use the 

30° Offset Elbow

 table on Page 

5 to determine proper offset and parts required.
Each offset requires two (2) elbows.  The second elbow 
is equipped with support straps.  It is very important to 
install the second elbow in each offset as close to the 
ceiling or support as possible so that the elbow straps 
can be secured to framing members to help support the 
weight of the chimney.
Determine offset distance of your chimney arrangement 
from centerline of fireplace to centerline of chimney 
where it is to pass through ceiling.
Locate center point of the chimney on ceiling as though 
a straight up chimney arrangement is to be used.  Mea-
sure your offset dimension from straight up chimney 
center point on ceiling.

Ceiling Chimney Hole/ 

Possible Obstructions

The size of the hole in ceiling will vary with the angle at 
which the chimney passes through ceiling. 
Drive a nail up through ceiling at marked chimney cen-
ter point. Go to floor above and see where hole will be 
cut. Check to see where existing ceiling joists and other 
possible obstructions are located...i.e. wiring, plumbing 
etc... If necessary, re-position chimney and/or fireplace 
to avoid obstructions.

Cutting the Hole

Cover fireplace collar opening and cut proper sized 
chimney hole in chimney.  

Framing the Ceiling Hole

Frame the ceiling chimney hole as shown in Figure 
10.  It is good practice to use framing lumber that is the 
same size as the ceiling joists; this is a requirement at 
attic level.

The 

inside dimension

 of the frame 

must be 

the same 

as the hole size selected from Figure 11 in order to 
provide required the 2” (51mm) air space between the 
outside diameter of the chimney and the edges of the 
framed ceiling hole.

FPC556a

BFC36

LOCATE CENTER LINE

Circulating model

8/21/00   djt

8

���

"

(222mm) 

Chimney Centerline

Actual Center-

point

Plumb Line

Plumb Bob

Imaginary Center-

point

FPC556a

Fig. 9

  Locate centerline of chimney with plumb line.

The following table gives firestop spacer model num-
bers:

Chimney Hole Size

 

 

 Angle of Chimney    

 

 

  at Ceiling 

  Size of Chimney 

Vertical 

 

30°

 

 

FS2A 

 

FS6A

 

8” Flue 

17

¹⁄₂

” x 17

¹⁄₂

”  

17

⁷⁄₈

” x 29

⁵⁄₈

 

 

(445 x 445mm)  (454 x 753mm)

New 

Framing 

Members

Existing 

Ceiling 

Joists

Fig. 10 

 Typical frame for ceiling chimney hole.

FP551b

17 1/2"

Framing chimney hole

5/13/99   djt

Ceiling

Chimney 

Hole

17

¹⁄₂

(445mm)

17

¹⁄₂

(445mm)

FP551b

Fig. 11

  Ceiling chimney hole sizes necessary for installing 

firestop spacer.

Содержание Monarch BFC36

Страница 1: ...Closed Combustion Heat Circulating Fireplace Model BFC36 For use in the U S Canada Underwriter s Laboratories Report No MH6018 DO NOT DISCARD THIS MANUAL Retain for future use 7412647 4 07 Rev 13 Hom...

Страница 2: ...d or approved by CFM Corpo ration in combination or assembly with a CFM Corporation replace system notwithstand ing any independent testing laboratory or other third party approval of such component p...

Страница 3: ...ge 647 BFC36 specs 8 18 00 djt 13 Dia 343mm Rough Opening Width 43 Rough Opening Height Rough Opening Depth Gas Line Access 51 1297mm 51 1297mm 1 8 3 4 m m 197mm 23 584mm 610mm 624mm 39 997mm 246mm 35...

Страница 4: ...tstop Standoff Surround Trim Ledge Standoff Glass Door Romex Pigtail Gas Line Access Knock out Each Side Air Inlet Basket Grate Bottom Grille Metal Safety Strip s Shown not inplace 1 2 or 3 pieces Nai...

Страница 5: ...et of angled run of chimney Chimney supports are required for every 30 feet and 60 feet of vertical chimney height above the hearth Determine the offset distance of your chimney arrangement from the c...

Страница 6: ...2 total 45 elbows in Canada per replace may be used 6 A guy wire stabilizer is required for chimneys extend ing more than 6 1 8m above a roof line The Ten Foot Rule Major U S building codes specify a...

Страница 7: ...w the chimney system should be run contact your Ver mont Castings Majestic Products dealer for assistance Installation Insulating Fireplace Enclosure for Cold Climates If you live in a cold climate it...

Страница 8: ...ts must be tight NOTE Check local building codes to determine if junction box is required at the romex pigtail house wire connection Also check junction box and speed control SCVS installation instruc...

Страница 9: ...ut Check to see where existing ceiling joists and other possible obstructions are located i e wiring plumbing etc If necessary re position chimney and or replace to avoid obstructions Cutting the Hole...

Страница 10: ...in front of the replace This Z shaped safety strip is not provided but must be fabricated of metal with each horizontal leg at least 1 38mm wide and equal in length to the metals strips provided with...

Страница 11: ...ness up to 8 203mm When combined thickness of ceiling material ceiling joists and ooring material exceeds 8 203mm adjustments must be made in framing to assure that minimum air spaces to chimney are m...

Страница 12: ...y adjacent combustible surfaces Combustible surfaces include burnable materials such as ceiling members joists ooring combustible insulation and roof structures WARNING Do not pack required air spaces...

Страница 13: ...ns are not a substitute for local building codes You must check your local building codes to determine speci c requirements for your city or state NOTE Other building materials may be required in addi...

Страница 14: ...antel clearances 12 from top of grille opening 6 from top of grille opening Face Plate FP531b mantel clearances 9 03 djt 12 305mm Max 12 305mm Min 1 38mm 6 159mm Min Fig 19 Mantel clearance Combustibl...

Страница 15: ...protect hearth extension material Fig 21 Secure the hearth extension to the oor to prevent shifting using trim molding or other similar means at three 3 outer edges Seal crack between the replace hear...

Страница 16: ...mine the thickness required for any new mate rial NEW K of new material per inch thickness required X of listed thickness K of listed material per inch material Example for Common Brick T new 5 0 0 45...

Страница 17: ...tub to the right and up Close the door and turn the handle stub to the left and down to secure door Fig 26 Left Handle is Stationary Turn Counter clockwise to Open FP1596 Fig 26 Turn right door handle...

Страница 18: ...d 2 complying with the Standard for Decorative Gas Appliances for Installa tion in Vented Fireplaces ANSI Z21 60 or CSA draft requirements for Gas Fired Log Lighters for Woodburn ing Fireplaces Draft...

Страница 19: ...20008275 5 Right Door Assembly Complete 20008276 6 Rear Firebrick 2353145 7 Side Firebrick two per replace 2353146 8 Hearth Firebrick 2353140 9 Nailing Flange four per replace 2422198 10 Fiberglas Rop...

Страница 20: ...Balance Flue Heat Circulating Fireplace 7412647 BFC Balanced Flue Fireplace continued 25 Stud 3 8 16 x 1 20009776 26 Nut Hex Jam 3 8 16 Toplk 1203290 27 Black Fall Away Handle 20006382 Ref Descriptio...

Страница 21: ...such must be oper ated only with CFM Corporation approved components If you use an unapproved component to make any modi cations you may create a possible re hazard and will void the CFM Corporation...

Страница 22: ...ng is not included TT200C Adapter Kit TT8CB is required Chase Top Housing Used with chase terminations to prevent rain entry FL88 8 ue Contemporary Flashing 8 6 12 with 8 ue Required for Contemporary...

Страница 23: ...place installed in the continental United States the state of Alaska and Canada only if and so long as the Fireplace is installed or serviced by a quali ed installer preferably NFI or WETT Canada cert...

Страница 24: ...410 Admiral Blvd Mississauga Ontario Canada L5T 2N6 800 668 5323 www cfmcorp com CFM Corporation...

Отзывы: