Majestic fireplaces LDVR1 Скачать руководство пользователя страница 9

9

LDVR Series Direct Vent Gas Fireplace

10007317

The fireplace, when installed, must be 
electrically connected and grounded in 
accordance with local codes or, in the ab-
sence of local codes, with the current CSA 
C22.1 Canadian Electrical Code.

For USA installations follow local codes 
and the national electrical code  ANSI/
NFPA No. 70.

It is strongly suggested that the wiring of 
the EB-1 Electrical Junction Box be carried 
out by a licensed electrician.

Ensure that the power to the supply line 
has been disconnected before commenc-
ing this procedure.                

The EB-1 Electrical junction box has been fitted stand-
ard on this model to allow for the easy connection of an 
optional fan kit. 
To connect the EB-1 box to the house electrical supply 
follow the steps below.
1.  Unscrew the retaining screw from the EB-1 base 

plate and remove the EB-1 assembly from the  
appliance. (Fig. 8)

2.  Remove the front cover of the EB-1 box.
3.  Remove the plug socket assembly from the EB-1 

box.

4.  Feed the supply line in through the EB-1 opening in 

the side of the appliance and then through the back 
of the EB-1 assembly. (Fig. 8)

5.  Connect the black wire of the power supply line to 

the brass screw (polarized) of the socket assembly.

6.  Connect the white wire of the power line to the 

chrome screw of the socket assembly.

7.  Connect the ground wire of the supply line to the 

green screw of the socket assembly.

8.  Refit the socket assembly back into the electrical 

box and replace the cover plate. Secure the cable 
with the clamp on the outside of the EB-1 base 
plate and refit the EB-1 assembly to the unit with the 
screw removed in step 1.

This appliance may be fitted with a Synetek ignition 
module. 
Installation of the remote on/off starter switch or 
wall thermostat on electronic ignition units. 

1.  Thread the wiring through the holes on the side 

panels of the appliance. Take care not to cut the wire 
or insulation on metal edges. Route the wire to a 
conveniently located receptacle box.

2.  Attach the wire to the ON/OFF switch and install the 

switch into the receptacle box.

3.  Connect the white wire from the wall switch or wall 

thermostat to the white wire terminal from the elec-
tronic module. Connect the black wire from the wall 
switch or the red wire from the wall thermostat, to 
the red wire terminal from the electronic module.

Electronic Gas Control Valve

EB-1 Electrical Box

FP580

INSTA VENT FREE

EB1 JUNCTION BOX

11/18/97

OUTSIDE

������������

INSIDE

BACK OF UNIT

FP580

Electrical Box

Retaining Screw

Fig. 8

  EB-1 receptacle.

 

Содержание LDVR1

Страница 1: ...r from your neighbor s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE...

Страница 2: ...nate Switch Location 8 EB 1 Electrical Box 9 Electronic Gas Control Valve 9 General Venting Information General Venting 10 General Venting Information Termination Location 11 General Information Assem...

Страница 3: ...equate ventilation and combustion air to operate properly 13 This replace must not be connected to a chimney ue serving a separate solid fuel burning replace 14 When the replace is not in use it is re...

Страница 4: ...nt terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBS...

Страница 5: ...mm E 24 632 mm 24 610 mm 27 686 mm 31 788 mm F 11 292 mm 16 406 mm 16 406 mm 16 406 mm G 14 362 mm 18 476 mm 18 476 mm 18 476 mm H 19 501 mm 24 616 mm 24 616 mm 27 686 mm I 23 590 mm 27 705 mm 27 705...

Страница 6: ...efer to Figs 3a and 3b and the following Mantel Charts The tting of a bay window trim kit does not effect the distances and reference points referred to in the diagram and chart Noncombustible mantels...

Страница 7: ...while ange B is for 5 8 drywall 3 Bend the desired anges out 90 on both sides of the replace Slide the replace into the framed opening until the anges contact the front surfaces of the framing Level t...

Страница 8: ...7 The gas control is equipped with a captured screw type pressure test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use...

Страница 9: ...line to the brass screw polarized of the socket assembly 6 Connect the white wire of the power line to the chrome screw of the socket assembly 7 Connect the ground wire of the supply line to the green...

Страница 10: ...front of the termination hood Do not locate termination hood where excessive snow or ice build up may occur Be sure to check vent termi nation area after snow falls and clear to prevent ac cidental b...

Страница 11: ...et 3 91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9...

Страница 12: ...Temperature Sealant Hose Clamp FP1471 Fig 11 Apply high temperature sealant to 4 and 7 pipes Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with combustible...

Страница 13: ...ar wall is 20 508mm Fig 14 Only one 45 elbow is allowed in these installations Minimum clearances between vent pipe and com bustible materials are as follows Top 2 51 mm Sides 1 25 mm Bottom 1 25 mm H...

Страница 14: ...Wall 9 240mm 10 264mm Fireplace Hearth Framing Detail Opening for Noncombustible Wall 7 190mm VO584 100 Fig 15 Locate vent opening on wall ZCS101 Zero Clearance Sleeve 3 11 99 djt Max Length 12 305mm...

Страница 15: ...g outcrop the vent pipe must ush up with the siding It is always best to locate the replace in such a way that minimizes the number of offsets and horizontal vent length The horizontal vent run refers...

Страница 16: ...n Figure 23 Dimension A plus B must not be greater than 17 5 2 m The maximum number of 45 elbows permitted per side wall installation is two 2 These elbows can be installed in either the vertical or h...

Страница 17: ...equired for combustible walls STEP 3 Attach the appropriate venting component s to the inner and outer ue collars of the replace using three 3 screws Fig 27 Follow with the installation of the inner a...

Страница 18: ...ons When it is not possible to meet the required vent ter minal clearances of 12 305 mm above grade level a snorkel vent kit 7TDVSNORK is required It allows installation depth of down to 7 178 mm belo...

Страница 19: ...approved for 1 Vertical installations up to 40 12 m in height Up to 10 3 m horizontal vent run can be installed within the vent system using a maximum of three 90 elbows Vertical Through the Roof Appl...

Страница 20: ...rovide a minimum of 1 inch clearance to the vent pipe i e the hole must be at least 9 x 9 240 x 240mm 5 Place replace into position 6 Place restop s 7DVFS or Attic Insulation Shield 7DVAIS into positi...

Страница 21: ...Up Installation 1 26 00 djt 40 12 m Storm Collar Roof Flash ing Vent Termination Roof 2 Min Roof Support Attic Insulation Shield Attic Insulation Joists Joists FP1022 Fig 37 Typical straight up insta...

Страница 22: ...rmination Kit Starter Kit Model 7TDVSKV Vertical Venting for 7TDVSKV A order 1 12 to 6 12 roof pitch for 7TDVSKV B order 7 12 to 12 12 roof pitch for 7TDVSKV F order at roof Starter Kit for Below Grad...

Страница 23: ...glass cleaner within the rst few weeks of operation After the initial cleaning process the glass should be cleaned two or three times during each operating season depending on the environment in the h...

Страница 24: ...ont Center B161 B138 B138 Rear B158 BC14 BD15 Rear Left A41 Rear Right A42 Top Center A44 BD18 33LDVR 1 Place rear log left A41 on rear bracket ensure the notch on the left end locates against the ben...

Страница 25: ...rock material around the rebox base Rear B158 Front Left B160 Front Center B161 Front Right B159 LG481 Fig 42 Correct log placement for 36LDVR 39LDVR 1 Place rear log BC14 on rear bracket ensure log i...

Страница 26: ...nd the rebox base Rear BD15 Top Center BBD18 Front Right BD17 Front Left BD16 Lava Rock Front Center B138 Ember Material Lava Rock LG434 Fig 44 Correct log placement for 43LDVR Do not place any of the...

Страница 27: ...nt Gas Fireplace 10007317 Glowing Embers LG482 LG384 33LDV log flames 1 05 Glowing Embers LG384 Glowing Embers LG415 Glowing Embers LG435 Fig 48 Correct burner ame appearance for the LDVR replaces 33L...

Страница 28: ...follow these instruc tions exactly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO D...

Страница 29: ...to repair it call a quali ed service technician Force or attempting repair may result in a re or explosion D Do not use this appliance if any part has been under water Immediately call a quali ed ser...

Страница 30: ...All Wiring Connections Replace Piezo Ignitor Supply Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connection...

Страница 31: ...e Continuously Monitored Heating Cycle Complete LED OFF NO YES NO NO YES Abnormal Operation 5 sec Inter Trial Delay LED Steady Flash Lockout Flame detected out of sequence Reset by interrupting ON OFF...

Страница 32: ...ts are used Fig 50 Nova SIT820 Gas Valve D E F FC108 SIT regulator conversion 10 03 OF F P I L O T O FC107 SIT820 valve conversion 10 03 A B C OF F P I L O T O FC107 108 Natural Gas Log Locator Pin Pr...

Страница 33: ...them if necessary Check the manifold and supply pressures against the appli ance speci cations Most of these components may require only an occasional checkup and cleaning and some may require adjust...

Страница 34: ...ithout notice 33 36 39 43LDVR HI LO 22 21 19a b 18a b 41 17 30 33LDVR 1 1a 1b 1c 1d 1e 1f 1a 36LDVR 1 1g 1h 1i 2 3 6a b 8 7a b 9 11 12 13 14 15 16 20 23 24 25 26 29 31 32 33 34 35 37 39 7317 LDVR part...

Страница 35: ...lot Hood 10002385 10002385 10002385 10002385 10 Manifold Tubing w Fittings 57318 57318 57318 57318 11 Thermocouple RN RP 53373 53373 53373 53373 12 Thermopile RN RP 51827 51827 51827 51827 13 Electrod...

Страница 36: ...Control from Synetek EN 10007939 10007939 10007939 10007939 40 Wire Harness EN Synetek low voltage 10008139 10008139 10008139 10008139 41 Wire Harness EN Synetek high voltage 10008140 10008140 1000814...

Страница 37: ...eniently located wall socket Method B Using EB 1 Receptacle Box The EB 1 receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is then plugged into the EB 1 box For instruction...

Страница 38: ...ring Take care when handling the refractory panels as they are fragile until held in place and supported Installation Refer to Figures 54 55 1 Remove the front window frame assembly 2 Remove the logs...

Страница 39: ...33LDVR 33DVMTKB Black Adjustable Medium Trim Kit Appliance Model Trim Kit 36LDVR ADVMTKP Polished Brass 36LDVR ADVMTKS Pewter 36LDVR ADVMTKB Black 39LDVR ADVMTKP Polished Brass 39LDVR ADVMTKS Pewter 3...

Страница 40: ...40 LDVR Series Direct Vent Gas Fireplace 10007317...

Страница 41: ...41 LDVR Series Direct Vent Gas Fireplace 10007317...

Страница 42: ...42 LDVR Series Direct Vent Gas Fireplace 10007317...

Страница 43: ...must pay for any Authorized Dealer in home travel fees or service charges for in home repair work It is the dealers option whether the repair work will be done in the customer s home or in the dealer...

Страница 44: ...2 83 59 36LDVRRN 57 5 81 82 58 36LDVRRP 57 5 82 83 58 36LDVREN 63 6 81 82 58 36LDVREP 63 6 82 83 58 39LDVRRN 50 2 76 79 63 39LDVRRP 50 2 79 80 63 39LDVREN 54 2 78 79 63 39LDVREP 54 2 79 80 63 43LDVRRN...

Отзывы: