Majestic fireplaces LDVR1 Скачать руководство пользователя страница 4

4

LDVR Series Direct Vent Gas Fireplace

10007317

Installation & Operating Instructions

Requirements for the Commonwealth of 
Massachusetts

All gas fitting and installation of this heater shall only be 
done by a licensed gas fitter or licensed plumber.
For all side wall horizontally vented gas fueled 
equipment installed in every dwelling, building or 
structure used in whole or in part for residential 
purposes, including those owned or operated by the 
Commonwealth and where the side wall exhaust vent 
termination is less than seven (7) feet above finished 
grade in the area of the venting, including but not limited 
to decks and porches, the following requirements shall 
be satisfied:

Installation of Carbon Monoxide Detectors

At the time of installation of the side wall horizontal 
vented gas fueled equipment, the installing plumber 
or gas fitter shall observe that a hard wired carbon 
monoxide detector with an alarm is installed on each 
additional level of the dwelling, building or structure 
served by the side wall horizontally vented gas fueled 
equipment. It shall be the responsibility of the property 
owner to secure the services of qualified licensed 
professionals for the installation of hard wired carbon 
monoxide detectors.
In the event that the side wall horizontally vented gas 
fueled equipment is installed in a crawl space or an 
attic, the hard wired carbon monoxide detector with 
alarm and battery back-up may be installed on the next 
adjacent floor level.
In the event that the requirements of this subdivision 
can not be met at the time of completion of installation, 
the owner shall have a period of thirty (30) days 
to comply with the above requirements; provided, 
however, that during said thirty (30) day period, a 
battery operated carbon monoxide detector with an 
alarm shall be installed.

Approved Carbon Monoxide Detectors

Each carbon monoxide detector as required in 
accordance with the above provisions shall comply with 
NFPA 720 and ANSI/UL 2034 listed and IAS certified.

Signage

A metal or plastic identification plate shall be 
permanently mounted to the exterior of the building at 
a minimum height of eight (8) feet above grade directly 
in line with the exhaust vent terminal for the horizontally 
vented gas fueled heating appliance or equipment. The 
sign shall read, in print size no less than one-half (1/2) 
inch in size, 

“GAS VENT DIRECTLY BELOW, KEEP 

CLEAR OF ALL OBSTRUCTIONS”.

Inspection

The state or local gas inspector of the side wall 
horizontally vented gas fueled equipment shall not 
approve the installation unless, upon inspection, the 
inspector observes carbon monoxide detectors and 
signage installed in accordance with the provisions of 
248 CMR 5.08(2)(a)1 through 4.

Exemptions

The following equipment is exempt from 248 CMR 
5.08(2)(a)1 through 4:

• 

The equipment listed in Chapter 10 entitled 
“Equipment Not Required To Be Vented” in the most 
current edition of NFPA 54 as adopted by the Board; 
and

• 

Product Approved side wall horizontally vented gas 
fueled equipment installed in a room or structure 
separate from the dwelling, building or structure 
used in whole or in part for residential purposes.

MANUFACTURER REQUIREMENTS

Gas Equipment Venting System Provided

When the manufacturer of Product Approved side 
wall horizontally vented gas equipment provides a 
venting system design or venting system components 
with the equipment, the instructions provided by the 
manufacturer for installation of the equipment and the 
venting system shall include:

• 

Detailed instructions for the installation of the venting 
system design or the venting system components; 
and

• 

A complete parts list for the venting system design or 
venting system.

Gas Equipment Venting System NOT Provided

When the manufacturer of a Product Approved side 
wall horizontally vented gas fueled equipment does 
not provide the parts for venting the flue gases, but 
identifies “special venting systems”, the following 
requirements shall be satisfied by the manufacturer:

• 

The referenced “special venting system” instructions 
shall be included with the appliance or equipment 
installation instructions; and

• 

The “special venting systems” shall be Product 
Approved by the Board, and the instructions for 
that system shall include a parts list and detailed 
installation instructions.

A copy of all installation instructions for all Product 
Approved side wall horizontally vented gas fueled 
equipment, all venting instructions, all parts lists 
for venting instructions, and/or all venting design 
instructions shall remain with the appliance or 
equipment at the completion of the installation.

Содержание LDVR1

Страница 1: ...r from your neighbor s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the re department WARNING IF THE INFORMATION IN THIS MANUAL IS NOT FOLLOWED EXACTLY A FIRE...

Страница 2: ...nate Switch Location 8 EB 1 Electrical Box 9 Electronic Gas Control Valve 9 General Venting Information General Venting 10 General Venting Information Termination Location 11 General Information Assem...

Страница 3: ...equate ventilation and combustion air to operate properly 13 This replace must not be connected to a chimney ue serving a separate solid fuel burning replace 14 When the replace is not in use it is re...

Страница 4: ...nt terminal for the horizontally vented gas fueled heating appliance or equipment The sign shall read in print size no less than one half 1 2 inch in size GAS VENT DIRECTLY BELOW KEEP CLEAR OF ALL OBS...

Страница 5: ...mm E 24 632 mm 24 610 mm 27 686 mm 31 788 mm F 11 292 mm 16 406 mm 16 406 mm 16 406 mm G 14 362 mm 18 476 mm 18 476 mm 18 476 mm H 19 501 mm 24 616 mm 24 616 mm 27 686 mm I 23 590 mm 27 705 mm 27 705...

Страница 6: ...efer to Figs 3a and 3b and the following Mantel Charts The tting of a bay window trim kit does not effect the distances and reference points referred to in the diagram and chart Noncombustible mantels...

Страница 7: ...while ange B is for 5 8 drywall 3 Bend the desired anges out 90 on both sides of the replace Slide the replace into the framed opening until the anges contact the front surfaces of the framing Level t...

Страница 8: ...7 The gas control is equipped with a captured screw type pressure test point therefore it is not necessary to pro vide a 1 8 test point up stream of the control When using copper or ex connector use...

Страница 9: ...line to the brass screw polarized of the socket assembly 6 Connect the white wire of the power line to the chrome screw of the socket assembly 7 Connect the ground wire of the supply line to the green...

Страница 10: ...front of the termination hood Do not locate termination hood where excessive snow or ice build up may occur Be sure to check vent termi nation area after snow falls and clear to prevent ac cidental b...

Страница 11: ...et 3 91cm 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9...

Страница 12: ...Temperature Sealant Hose Clamp FP1471 Fig 11 Apply high temperature sealant to 4 and 7 pipes Outside Corner Inside Corner Termination Clearances Termination clearances for buildings with combustible...

Страница 13: ...ar wall is 20 508mm Fig 14 Only one 45 elbow is allowed in these installations Minimum clearances between vent pipe and com bustible materials are as follows Top 2 51 mm Sides 1 25 mm Bottom 1 25 mm H...

Страница 14: ...Wall 9 240mm 10 264mm Fireplace Hearth Framing Detail Opening for Noncombustible Wall 7 190mm VO584 100 Fig 15 Locate vent opening on wall ZCS101 Zero Clearance Sleeve 3 11 99 djt Max Length 12 305mm...

Страница 15: ...g outcrop the vent pipe must ush up with the siding It is always best to locate the replace in such a way that minimizes the number of offsets and horizontal vent length The horizontal vent run refers...

Страница 16: ...n Figure 23 Dimension A plus B must not be greater than 17 5 2 m The maximum number of 45 elbows permitted per side wall installation is two 2 These elbows can be installed in either the vertical or h...

Страница 17: ...equired for combustible walls STEP 3 Attach the appropriate venting component s to the inner and outer ue collars of the replace using three 3 screws Fig 27 Follow with the installation of the inner a...

Страница 18: ...ons When it is not possible to meet the required vent ter minal clearances of 12 305 mm above grade level a snorkel vent kit 7TDVSNORK is required It allows installation depth of down to 7 178 mm belo...

Страница 19: ...approved for 1 Vertical installations up to 40 12 m in height Up to 10 3 m horizontal vent run can be installed within the vent system using a maximum of three 90 elbows Vertical Through the Roof Appl...

Страница 20: ...rovide a minimum of 1 inch clearance to the vent pipe i e the hole must be at least 9 x 9 240 x 240mm 5 Place replace into position 6 Place restop s 7DVFS or Attic Insulation Shield 7DVAIS into positi...

Страница 21: ...Up Installation 1 26 00 djt 40 12 m Storm Collar Roof Flash ing Vent Termination Roof 2 Min Roof Support Attic Insulation Shield Attic Insulation Joists Joists FP1022 Fig 37 Typical straight up insta...

Страница 22: ...rmination Kit Starter Kit Model 7TDVSKV Vertical Venting for 7TDVSKV A order 1 12 to 6 12 roof pitch for 7TDVSKV B order 7 12 to 12 12 roof pitch for 7TDVSKV F order at roof Starter Kit for Below Grad...

Страница 23: ...glass cleaner within the rst few weeks of operation After the initial cleaning process the glass should be cleaned two or three times during each operating season depending on the environment in the h...

Страница 24: ...ont Center B161 B138 B138 Rear B158 BC14 BD15 Rear Left A41 Rear Right A42 Top Center A44 BD18 33LDVR 1 Place rear log left A41 on rear bracket ensure the notch on the left end locates against the ben...

Страница 25: ...rock material around the rebox base Rear B158 Front Left B160 Front Center B161 Front Right B159 LG481 Fig 42 Correct log placement for 36LDVR 39LDVR 1 Place rear log BC14 on rear bracket ensure log i...

Страница 26: ...nd the rebox base Rear BD15 Top Center BBD18 Front Right BD17 Front Left BD16 Lava Rock Front Center B138 Ember Material Lava Rock LG434 Fig 44 Correct log placement for 43LDVR Do not place any of the...

Страница 27: ...nt Gas Fireplace 10007317 Glowing Embers LG482 LG384 33LDV log flames 1 05 Glowing Embers LG384 Glowing Embers LG415 Glowing Embers LG435 Fig 48 Correct burner ame appearance for the LDVR replaces 33L...

Страница 28: ...follow these instruc tions exactly B BEFORE LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO D...

Страница 29: ...to repair it call a quali ed service technician Force or attempting repair may result in a re or explosion D Do not use this appliance if any part has been under water Immediately call a quali ed ser...

Страница 30: ...All Wiring Connections Replace Piezo Ignitor Supply Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connection...

Страница 31: ...e Continuously Monitored Heating Cycle Complete LED OFF NO YES NO NO YES Abnormal Operation 5 sec Inter Trial Delay LED Steady Flash Lockout Flame detected out of sequence Reset by interrupting ON OFF...

Страница 32: ...ts are used Fig 50 Nova SIT820 Gas Valve D E F FC108 SIT regulator conversion 10 03 OF F P I L O T O FC107 SIT820 valve conversion 10 03 A B C OF F P I L O T O FC107 108 Natural Gas Log Locator Pin Pr...

Страница 33: ...them if necessary Check the manifold and supply pressures against the appli ance speci cations Most of these components may require only an occasional checkup and cleaning and some may require adjust...

Страница 34: ...ithout notice 33 36 39 43LDVR HI LO 22 21 19a b 18a b 41 17 30 33LDVR 1 1a 1b 1c 1d 1e 1f 1a 36LDVR 1 1g 1h 1i 2 3 6a b 8 7a b 9 11 12 13 14 15 16 20 23 24 25 26 29 31 32 33 34 35 37 39 7317 LDVR part...

Страница 35: ...lot Hood 10002385 10002385 10002385 10002385 10 Manifold Tubing w Fittings 57318 57318 57318 57318 11 Thermocouple RN RP 53373 53373 53373 53373 12 Thermopile RN RP 51827 51827 51827 51827 13 Electrod...

Страница 36: ...Control from Synetek EN 10007939 10007939 10007939 10007939 40 Wire Harness EN Synetek low voltage 10008139 10008139 10008139 10008139 41 Wire Harness EN Synetek high voltage 10008140 10008140 1000814...

Страница 37: ...eniently located wall socket Method B Using EB 1 Receptacle Box The EB 1 receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is then plugged into the EB 1 box For instruction...

Страница 38: ...ring Take care when handling the refractory panels as they are fragile until held in place and supported Installation Refer to Figures 54 55 1 Remove the front window frame assembly 2 Remove the logs...

Страница 39: ...33LDVR 33DVMTKB Black Adjustable Medium Trim Kit Appliance Model Trim Kit 36LDVR ADVMTKP Polished Brass 36LDVR ADVMTKS Pewter 36LDVR ADVMTKB Black 39LDVR ADVMTKP Polished Brass 39LDVR ADVMTKS Pewter 3...

Страница 40: ...40 LDVR Series Direct Vent Gas Fireplace 10007317...

Страница 41: ...41 LDVR Series Direct Vent Gas Fireplace 10007317...

Страница 42: ...42 LDVR Series Direct Vent Gas Fireplace 10007317...

Страница 43: ...must pay for any Authorized Dealer in home travel fees or service charges for in home repair work It is the dealers option whether the repair work will be done in the customer s home or in the dealer...

Страница 44: ...2 83 59 36LDVRRN 57 5 81 82 58 36LDVRRP 57 5 82 83 58 36LDVREN 63 6 81 82 58 36LDVREP 63 6 82 83 58 39LDVRRN 50 2 76 79 63 39LDVRRP 50 2 79 80 63 39LDVREN 54 2 78 79 63 39LDVREP 54 2 79 80 63 43LDVRRN...

Отзывы: