background image

22

DVRTSB Bay Window Fireplace

10003848 

It is necessary to periodically clean glass. During start-
up condensation, which is normal, forms on the inside 
of the glass. This condensation causes lint, dust and 
other airborne particles to cling to glass surface.
Also initial paint curing may deposit a slight film on the 
glass. It is therefore recommended glass be cleaned 
two or three times with a non-ammonia based house-
hold cleaner and warm water (We recommend gas 
fireplace glass cleaner) within the first few weeks of 
operation.
After the initial cleaning process the glass should be 
cleaned two or three times during each operating 
season depending on the environment in the house.

Clean the glass after the first two weeks of 
operation.

Installation of Logs

Handle and dispose of the plastic bags in a 
safe manner. They are not toys and should 
be kept away from infants.

Ceramic Refractory Installation

Glass Cleaning

The rear wall refractory panels are installed in the unit 
prior to shipment.
1.  Unpack the ceramic refractory panels from their 

carton.

Handle the refractory material carefully, the 
panels are fragile.

2.  Place the front floor refractory panels on the base  

of the fireplace. (Fig. 38)

3.  Place both side panels in place along the side of  

the base. (Fig. 38)

FP1393

Fig. 38

  DVRTSB ceramic panels.

The logs can be identified by the number cast into 
their underside.
The logs must be correctly placed in the order 
described for the correct operation of the fireplace.

Refer to Figures 30 & 40 for log location and alignment.
1.  Unpack the logs from the shipping carton. 

Handle 

the logs carefully as they are fragile. 

2.  Remove front glass/frame assembly.
3.  Place the left rear (B105) and right rear (B106) 

logs in place on the grate. The square hole in the 
underside of the logs locates over the corner legs 
of the grate. The inner ends of the log point to the 
center of the burner.

4.  Place the left front (B107) and right front (B108) logs 

in place. Again the square holes fit over the corner 
legs of the grate. The inner ends of these logs have 
a recess in the underside which locates over knobs 
on the top of the B105 and B106 logs to lock the 
inner end in place.

5.  Place the center front (B109) log in place. The notch 

on the outer end of this log locates around the third 
outer prong on the grate and the inner ends with a 
round recess rest on lug on top of the left front log 
(B107).

6.  Place the center rear (B110) log in place. The square 

hole in the underside of this log, locates over the 
rear center bar of the grate. The inner end of the log 
having a rectangular recess rests on the rectangular 
knob on the end of the left front log, (B107). 

LG298

Fig. 39

  DVRTSB logs.

B105

B110

B106

B108

B109

B107

Содержание DVRTSB

Страница 1: ...or s phone Follow the gas suppliers instructions If you cannot reach your gas supplier call the re department DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS AND OR LIQUIDS IN THE VICINITY OF T...

Страница 2: ...Grade Installation 17 Vertical Through the Roof Applications Installation 18 Vertical Through the Roof Installation 18 Twist Lock Vent Components 20 Operating Instructions Glass Information 21 Louvre...

Страница 3: ...em chimney of this replace should be checked at least once a year and if needed your venting system should be cleaned 8 Keep the area around your replace clear of com bustible materials gasoline and o...

Страница 4: ...Box Inlet 3848 Fig 2 Fireplace speci cations and framing dimensions Ref DVRTSB Top Vent A 35 888 mm B 34 873 mm C 32 831 mm D 34 885 mm E 2 56 mm F 2 51 mm G 17 444 mm H 24 610 mm I 5 139 mm J 2 61 m...

Страница 5: ...alled as Rear Vent 3848 Gas Line Inlet EB1 Box Inlet Fig 3 Fireplace speci cations and framing dimensions Ref DVRTSB Rear Vent A 35 888 mm B 34 873 mm C 32 831 mm D 34 885 mm E 2 56 mm F 2 51 mm G 17...

Страница 6: ...stance between the mantel leg if tted and the replace For the correct mounting height and widths refer to Figure and the Mantel Chart below Noncombustible mantels and legs may be installed at any heig...

Страница 7: ...urisdiction for installations at elevations above 4 500 feet 1 370m Units B02A01 B02B01 Gas Line Installation When purging the gas lines the front glass must be removed The gas pipeline can be brought...

Страница 8: ...e socket assembly 6 Connect the black wire of the power supply line to the brass screw polarized of the socket assembly 7 Re t the socket assembly back into the electrical box and replace the cover pl...

Страница 9: ...e intake box and remove the cover and gasket Fig 11 5 Remove four 4 screws securing the ue pipe to back of the intake box and remove pipe and gasket Fig 11 6 Secure the plate and gasket removed in Ste...

Страница 10: ...ng Horizontal venting must be installed on a level plane without any incline or decline There must not be any obstruction such as bushes gar den sheds fences decks or utility buildings within 24 from...

Страница 11: ...m 3 91cm J Clearance to nonmechanical air supply inlet 6 15cm for appliances 10 000 6 15cm for appliances to building or the combustion air inlet to any Btuh 3kW 12 30cm for 10 000 Btuh 3kW 9 other ap...

Страница 12: ...this is not mandatory with twist lock pipe NOTE For ease of assembly use a lubricant Vaseline or similar substance on male end of twist lock pipe prior to assembly Outside Corner Inside Corner Termin...

Страница 13: ...zontal distance between the rear of the appliance and the outside face of the rear wall is 20 508mm Fig 16 The minimum clearances between any combustible material and the vent pipe sections are Top 2...

Страница 14: ...l help to deter mine the various dimensions allowable Minimum clearance between vent pipes and combustible materials is one 1 25mm on top bottom and sides unless otherwise noted When the vent terminat...

Страница 15: ...each 45 elbow installed in the horizontal run the length of the horizontal run MUST be reduced by 18 45cm This does not apply if the 45 elbows are installed in the vertical part of the vent system The...

Страница 16: ...level plane STEP 6 Use appropriate length of pipe sections telescopic or xed and install The section which goes through the wall is packaged with the starter kit and can be cut to suit if necessary S...

Страница 17: ...he soil If the foundation is recessed use recess brackets not supplied for securing lower portion of the snorkel Fasten brackets to wall rst then secure to snorkel with self drilling 8 x 1 2 sheetmeta...

Страница 18: ...ng Fig 33 9 Install storm collar and seal around the pipe Fig 33 10 Add additional vent lengths for proper height Fig 31 The enlarged ends of the vent section always face downward 11 Apply high temper...

Страница 19: ...e ceiling level a 7DVAIS Attic Insulation Shield must be installed TWL101a Twist Lock Pipe 2 8 99 djt 3 5 Sheet Metal Screws per Joint Sealant Storm Collar TWL101a Fig 33 Roof ashing FP1029 attic insu...

Страница 20: ...ible length Pipe sections for vertical or horizontal venting Model 7TDVP8 4 per box Model 7TDVP12 4 per box Model 7TDVP24 4 per box Model 7TDVP36 Model 7TDVP48 Firestop Spacer Model 7DVFS Attic Insula...

Страница 21: ...e of frame out slightly and lift glass frame assembly up and away from the replace Fig 36 7 To reinstall the glass panel reverse this procedure Operating Instructions Glass Information Glass Frame Rem...

Страница 22: ...of the base Fig 38 FP1393 Fig 38 DVRTSB ceramic panels The logs can be identi ed by the number cast into their underside The logs must be correctly placed in the order described for the correct operat...

Страница 23: ...r units equipped with HI LO valves the ame adjustment is accomplished by rotating the HI LO adjustments knob located near the center of the gas control valve Figs 41 42 Turn counterclockwise to decrea...

Страница 24: ...E LIGHTING smell all around the heater area for gas Be sure to smell next to the oor because some gas is heavier than air and will settle on the oor WHAT TO DO IF YOU SMELL GAS Do not try to light any...

Страница 25: ...r wire accross terminals at wall switch if burner comes on replace defective wall switch If okay jumper wires across wall switch wires at valve if burner comes on wires are faulty or connections are b...

Страница 26: ...Line Hooked Up Shutoff Valve Open Pilot Stays Lit For Air In The Lines Thermopile Needs A Min 325mv Adjust Pilot Flame Height All Wiring Connections Replace Thermopile Thermocouple Needs A Min Of 14m...

Страница 27: ...is properly posi tioned and install the new HI LO pressure regulator to valve using the new screws E supplied with the kit Tighten screws securely Reference torque 25 in LB c Install the enclosed iden...

Страница 28: ...illivolt gas valve Most of these components may require only an oc casional checkup and cleaning and some may require adjustment If repair is necessary it should be per formed by a quali ed technician...

Страница 29: ...1 49 50 52 38 62 39 42 37 63 41 63 36 3848 DVRTSB parts 7 03 CFM Corporation reserves the right to make changes in design materials speci cations prices and discontinue colors and products at any time...

Страница 30: ...Pilot Tube w Fitting SIT not shown 10001296 15a Ori ce Pilot PSE Nat not shown 10001822 15b Ori ce Pilot PSE Prop not shown 10001823 16a Ori ce Pilot Top Convertible Nat not shown 10002268 16b Ori ce...

Страница 31: ...ry Lining Rear Wall Right 10003888 49 Refractory Lining Floor Left 10003890 50 Refractory Lining Floor Right 10003891 51 Refractory Lining Floor Front 10003892 52 CR Floor Kit w o Rear 10003889 53 Air...

Страница 32: ...nected in two ways Method A Route the 6 lead tted to the unit to a conveniently located wall socket Method B The EB I receptacle box Pt ZA1200 may be hard wired into the house supply The fan lead is t...

Страница 33: ...on trol FP1025 Fig 49 FK24 fan wiring The replace when installed must be electrically connected and grounded in accordance with local codes or in the absence of local codes with the current CSA C22 1...

Страница 34: ...34 DVRTSB Bay Window Fireplace 10003848...

Страница 35: ...hop Ifuponinspection thedamageisfoundtobethefaultofthemanufacturer repairs will be authorized at no charge to the customer parts and or labor Any part and or component replaced under the provisions of...

Страница 36: ...f ciency Fan OFF Fan ON AFUE DVRTSB RN 58 4 81 82 64 DVRTSB RP 58 4 82 83 64 DVRTSB RFN 58 4 81 82 64 DVRTSB RFP 58 4 82 83 64 DVRTSB EN 60 4 81 82 64 DVRTSB EP 60 4 82 83 64 410 Admiral Blvd Mississa...

Отзывы: