MIGE3028-4GF Serial Rack Mounted Industrial Ethernet Switch
- 11 -
The 100M Tx port is 10Base-T / 100Base-TX Ethernet RJ45
interfaces,Gigabit Tx port is 10/100/ 1000 Base-TX SFP electrical
interface.Connect to the terminal device using a straight-through cable and
connect to the network device using a crossover cable.
Connect the power supply
Once all other cables have been connected, the power supply for the
product identification specification can be connected.
2.2.4. Fiber Optic Connection
This product provides 100Base-TX single-mode or multi-mode fiber
interface.The type of 100M optical interface can be selected as SC, FC or
ST.Alsoavailable 4 A redundant 1000M hot-plug SFP optical interface,the type
of Gigabit fiber interface can be selected according to the requirements of LC.
Attention
This switch uses laser to transmit signals over fiber optic cables.The
laser meets the requirements of Class 1 laser products, and normal
operation is harmless to the eyes. However, when powering up the unit, do
not look directly at the optical transmission port and the fiber optic terminator
end face.
The steps to connect a pluggable fiber module are as follows:
Remove and retain the rubber sleeve of LC, SC,FC or ST port.When not in
use, put on a rubber sleeve to protect the fiber terminator.
Check whether the fiber terminator is clean.If not, please wipe the clean
paper towel or cotton ball slightly and gently wipe the cable plug.A dirty fiber
optic terminator will degrade the quality of the optical transmission and affect
port performance.
Connect one end of the cable to the fiber interface of the switch and the
other end to the fiber interface of the other device.
After the connection is complete, check the optical port LINK/ACT
indicator on the front panel of the switch. If the indicator is on, the connection is
valid.
2.2.5. Laying Cable
Cables should be laid out in the following conditions:
Before the cable is laid, check the specifications, model and quantity of all
cables in accordance with the construction drawing design and contract
requirements.
Before the cable is laid, check whether the cable is damaged, whether
there is a certificate such as the factory record and quality assurance to prove