background image

MIGE3028-4GF Serial Rack Mounted Industrial Ethernet Switch

- 7 -

The power requirements are shown in Table2- 3

Table2- 3 Switch power requirement table

Voltage

Voltage

range

Operating

temperature

Storage

temperature

Humidity

12VDC

9~18VDC

-40°C

~+85°C

-4°C ~+85°C

5~95%

24VDC

18~36VDC

-40°C~+85°

C

-40°C~+85°

C

5~95%

48VDC

36~72VDC

-40°C~+85°

C

-40°C~+85°

C

5~95%

220VAC/

DC

85~265VA

C 47-63Hz

or

110~370V

DC

-40°C~+85°

C

-40°C~+85°

C

5~95%

Attention:

Alarm relay
This series of switches has a power failure alarm relay, and its terminal

block uses a 3-bit 5.08mm pitch terminal. As shown in Figure 2-6. The relay
adopts one normally open terminal and one normally closed terminal, one of
the middle is a common terminal, the left two bits are normally open terminals,
and the two right sides are normally closed terminals. When the switch works
normally, the normally open terminal is in an open state and the normally
closed terminal is in a closed state. When any one of the power supplies fails,
the normally open state is the closed state, and the normally closed terminal is
the open circuit state. The relay recommended switch load capacity is 1A
(24VDC).

The power specifications supported by this device are

12VDC,24VDC,48VDC, 220VAC/DC. Before connecting with the power
supply, please confirm whether the power supply is consistent with the power
supply requirements identified by the device to avoid damage to the device.

Содержание MIGE3028-4GF

Страница 1: ...MIGE3028 4GF Serial Rack Mounted Industrial Ethernet Switch User Manual Edition V1 0 Wuhan Maiwe Communication Co Ltd...

Страница 2: ...in this manual does not represent for corresponding authorization on these information Our company attempts to ensure the accuracy and applicability for the information provided in this manual howeve...

Страница 3: ...ted with each other frequently inspection is needed Please keep the fiber socket and plug clean Do not look directly at the fiber section when the equipment is working Please keep the equipment clean...

Страница 4: ...llation and Networking 3 2 1 Hardware Structure 3 2 1 1 System Structure 3 2 1 2 Machine Structure 3 2 2 Hardware Installation 8 2 2 1 Installation Requirements 8 2 2 2 Host Installation 9 2 2 3 Cable...

Страница 5: ...ustrial Network Performance Real time broadcast storm suppression Redundant dual power input power failure alarm to meet high availability requirements Storage and forwarding mechanism the switch back...

Страница 6: ...rnet switches are as follows Technical indicators IEEE standards 802 3 802 3u 802 3x Exchange mode store and forward Switch bandwidth 12 8Gbps Flow control full duplex flow control half duplex back pr...

Страница 7: ...s are EMC protected 2 1 2 Machine Structure The chassis of this series is a 19 inch 1U rack structure The whole machine adopts a six sided fully enclosed structure The left and right side panels of th...

Страница 8: ...ort Yellow light Green light Green light Yellow light Green light On Off On Blink Off On Blink Off On Off On Blink Off 100M connection No connection or 10M access Port connection Port has network acti...

Страница 9: ...itself to work at the same rate as the other party avoiding full half duplex mismatch the transfer mode will default to half duplex and flow control will be automatically disabled Gigabit Tx ports can...

Страница 10: ...ted and pulled and placed in the normal position parallel to the interface Hot extraction step First the SFP plug handle is pulled down and perpendicular to the interface At this time the optical devi...

Страница 11: ...rmally open terminal and one normally closed terminal one of the middle is a common terminal the left two bits are normally open terminals and the two right sides are normally closed terminals When th...

Страница 12: ...quirements temperature 40 C 85 C relative humidity5 95 no condensation Grounding resistance requirements 5 According to the contract configuration requirements check whether the cable laying is in pla...

Страница 13: ...cs can be bundled together Separate the input and output lines It is highly recommended that all equipment lines in the system be labeled when necessary The switch should be connected to the protectio...

Страница 14: ...8 4GF 24S rear panel M schematic shown in FIG 2 14 Figure 2 14 MIGE3028 4GF 24S M switch front panel For most industrial applications 19 inch rack mounting is very convenient for them Before installat...

Страница 15: ...not look directly at the optical transmission port and the fiber optic terminator end face The steps to connect a pluggable fiber module are as follows Remove and retain the rubber sleeve of LC SC FC...

Страница 16: ...ry to prevent the cable from being knotted and the turning point should be minimized and the turning radius should not be too small The lashing should be tight and not too tight When laying on the cab...

Страница 17: ...ter 1 Start run or type cmd command Win2000 XP systems cmd WIN98 95 system with command to bring up a console window send ping 192 168 16 221 l 1000 t l Refers to the number of bytes sent by the packe...

Страница 18: ...ce is connected to the test computer through a direct connection network cable and sends PING commands to each other Both parties can correctly ping the other party without losing packets At the same...

Страница 19: ...e technical support office Product is repaired or replaced 3 1 Internet Service Through the technical support section of Wuhan Maiwe Communication Co Ltd you can get more useful information and tips 3...

Страница 20: ...thout notifying the user For the latest information please consult our marketing or technical support staff Model 100M Tx port 100M Fx port Gigabit Fx Tx port MIGE3028 4GF 24T 24 4 MIGE3028 4GF 4S M 2...

Страница 21: ...MAIWE COMMUNICATION CO LTD Add Building 2 Area E Phase ii Optical valley core center No 52 Liufang road East Lake Hi tech Development Zone Wuhan China Phone 027 87170215 16 Fax 86 027 87170217 www mai...

Отзывы: