Maipu MyPower S4100 Series Скачать руководство пользователя страница 15

 

MyPower S4100 Series Switch Install Manual (S4152F-POE-AC V2) V1.0

 

 

 

 

 

 

 

 

 

 

 

 

Maipu Confidential & Proprietary Information  

 

 

 

 

 

Page 15 of 23 

 

 

l

 

Keep  away  from  high  power  radio  transmitters,  radar  transmitters, 
and high frequency strong circuit devices  

l

 

Provide electromagnetic shielding 

 

Rack Configuration 

The  dimensions of  the  switch are  designed  to be  mounted  on a  standard 

19’’ rack. The dimensions are 436 mm x 44 mm x 420 mm (W x H x D). 
Ensure good ventilation for the rack. 

l

 

Every  device  in  the  rack  generates  heat  during  operation.  Provide 
good ventilation and fans for the enclosed rack. Do not stack devices 
closely. 

l

 

When mounting devices in an open rack, prevent the rack frame from 
obstructing the switch ventilation. Be sure to check positioning of the 
switch after installation. 

If a standard 19’’ rack is not available, the switch can be placed on a clean 
level  desktop,  leave  an  appropriate  clearance  around  the  switch  for 

ventilation. Do not place anything on top of the switch. 

 

Installation Instructions 

l

 

Read  related  chapters  in  this  manual  carefully  or  participate  in 

concerning  technology  training  before  the  installation.  Make  sure  all 
materials,  tools  and  other  items  required  by  the  installation  are 

prepared, as well as a proper site for installation and debugging. 

l

 

During  the installation,  it  is  required  to  use  the  brackets  and  screws 
provided in the accessory kit, and proper tools to ensure stability and 

reliability. Users should always wear antistatic uniforms and ESD wrist 

straps to prevent damaging the switch, and should only use and make 
standard  cables  and  connecters.  Be  cautious  to  potential  dangers 

during  the  installation,  and  make  protective  preparations  to  avoid 
accidents. 

l

 

Clean  the  site  after  the  installation.  Please  ensure  the  switch  is  well 

grounded before powering it on. Users should also maintain the switch 
regularly to extend its lifespan. 

Security Warnings 

l

 

Do not stare directly at the fiber port during operation to prevent eye 
damage  caused  by  the  laser  transceiver in  the  SFP optical module of 
the switch. 

l

 

Do  not  attempt  to  conduct  any  operation  which  may  cause  physical 
injuries, accidents or damage the switch. 

Содержание MyPower S4100 Series

Страница 1: ...Series Switch Install Manual S4152F POE AC V2 V1 0 Maipu Communication Technology Co Ltd No 16 Jiuxing Avenue Hi Tech Park Chengdu Sichuan Province P R China 610041 Tel 86 28 85148850 85148041 Fax 86...

Страница 2: ...d specifically disclaims any implied warranties of merchantability or fitness for any specific purpose Further Maipu reserves the right to revise this document and to make changes from time to time in...

Страница 3: ...s procedures illustrations completeness arrangement appearance Good Fair Average Poor Accessibility Contents index headings numbering Good Fair Average Poor Evaluate this document Editorial Language v...

Страница 4: ...ce 7 Front Panel 7 Back Panel 8 LEDs 8 Installation Notice 12 Installation Guide 12 Environment 12 Installation Instructions 15 Security Warnings 15 Device Installation 17 Installation Preparation 17...

Страница 5: ...e Combo port that is only one of the two ports that form the Combo port can be used at one moment MyPower S4152F POE AC V2 provides four Combo ports which are formed by four SFP ports and RJ 45 port 4...

Страница 6: ...structures and reduces cost of network construction l Support rich network protocols MyPower S4100 series switch supports 802 1d w s 802 1Q 802 1p 802 3ad 802 3x GVRP DHCP and SNTP It supports multica...

Страница 7: ...OE AC V2 routing switch supports SNMP outband and inband management CLI and WEB interfaces and RMON It adopts SMTP protocol to automatically send related sensitive information to the Administrator It...

Страница 8: ...7600 and 115200 bps in Bootrom mode but the baud rate setting will become invalid after restarting the switch Back Panel The back panel of MyPower S4152F POE AC V2 includes one 220V AC socket one DC p...

Страница 9: ...xtended module is error or fails Extended module indicator MODULE1 MODULE2 Off The extended module is not installed The port indictor and POE status indicator depend on the button of selecting the mod...

Страница 10: ...V2 52V 55V rated 52V IEEE802 3af 48 15 4W support full configured 24 ports System Features The system features of MyPower S4152F POE AC V2 routing switch Model Attribute MyPower S4152F POE AC V2 Chass...

Страница 11: ...100 Series Switch Install Manual S4152F POE AC V2 V1 0 Maipu Confidential Proprietary Information Page 11 of 23 Storage temperature 40 C 70 C Relative humidity 10 90 no condensing MTBF Lowest 120 000...

Страница 12: ...switch should work in the power input AC power 100V 240VAC 50 60Hz DC power 48 60VDC l Ground the switch properly to avoid ESD damage and physical injury l Avoid direct sunlight on the switch Keep th...

Страница 13: ...rmances of materials change and the metal parts are corroded easily too If the relative humidity is too low insulation pads shrink which causes the fastened screws loose Meanwhile in dry environment s...

Страница 14: ...nning of the switch or even hardware damage Anti static Electrostatic currents damage to internal circuits or even the entire switch To avoid damage l Ensure proper earth grounding of the device l Per...

Страница 15: ...tallation Instructions l Read related chapters in this manual carefully or participate in concerning technology training before the installation Make sure all materials tools and other items required...

Страница 16: ...ot debug the switch alone in a dangerous situation to prevent accidents l Use standard power sockets which have overload and leakage protection to prevent accidents l Check the circuits installation a...

Страница 17: ...and check the equipment inside as per the packing list Tools Utilities Required tools and utilities are as follows l Cross point screwdriver l Flat blade screwdriver l ESD wrist strap l Antistatic uni...

Страница 18: ...standard 19 rack Fasten it at a proper location with the screws provided leaving enough space around the switch for good air circulation Caution The brackets are used to fix switch on the rack They ca...

Страница 19: ...bit optical port Do not put SFP transceiver up side down Step 3 Push SFP transceiver along the guide rail gently until you feel the transceiver snap into place at the bottom of the slot SFP transceive...

Страница 20: ...3 Check all status indicators for the ports a lighted LED indicates that the link is established Otherwise the link is not ready and the cable should be examined Caution Check sign on the interface t...

Страница 21: ...ng switch uses 220V AC power supply by default It adapts voltage floating for more details refer to product specifications Connect the power supply cables as follows Connect the power cable to MyPower...

Страница 22: ...of SM4152F POE switch used for POE power supply The output power is 500W The input power of external power PCR01 48 20 V3 AC power 100 240VAC 50 60Hz the back panel is as follows Connect the power as...

Страница 23: ...le to the AC input socket at the power back panel Step 5 After confirming that all cables are connected well close the AC input switch at the back panel and open the external POE power PCR01 48 20 V3...

Отзывы: