background image

- 18 -

10  YOUR GUARANTEE

Congratulations on purchasing a Stuart Turner Mainsboost Charger Pump. 

We are confident this product will give you many years of trouble free service as all 
our products are manufactured to the very highest standard. 

The Mainsboost Charger pump is covered by the 

three year

 guarantee.  

Within the guarantee period we will repair, free of charge, any defects in the  
Mainsboost Charger resulting from faults in material or workmanship, repairing or 
exchanging the part affected or whole unit as we may reasonably decide. 

Not covered by this guarantee: Damage arising from incorrect installation, improper 
use, unauthorised repair, normal wear and tear and defects which have a negligible 
effect on the value or operation of the unit. 

Reasonable evidence must be supplied that the product has been purchased within 
the guarantee term prior to the date of claim (such as proof of purchase or the 
product serial number). 

This guarantee is in addition to your statutory rights as a consumer.  If you are in any 
doubt as to these rights, please contact your local Trading Standards Department. 

In the event of a claim please telephone 

‘PumpAssist’

 customer support.

+44 (0) 800 31 969 80

You should obtain appropriate insurance cover for any loss or damage which is not 
covered by Stuart Turner Ltd in this provision.

Please record here for your records.

TYPE NO.

SERIAL NO.

DATE PURCHASED

Содержание Charger MBC 100SV

Страница 1: ...nual covers all Mainsboost Charger units Mainsboost Charger Mainsboost Charger Installation Operation Maintenance Instructions Please leave this instruction booklet with the home owner as it contains...

Страница 2: ...or mental capabilities or lack of experience and knowledge if they have been given supervision or instruction concerning use of the appliance in a safe way and understand the hazards involved Childre...

Страница 3: ...Page Checklist 4 Introduction 5 Important Facts read before commencing installation 6 Location 7 Terminology 8 Installation 9 Electrical 11 Commissioning 13 Technical Specification 16 Trouble Shooting...

Страница 4: ...Hoses 2 7 Hose washers 4 5 Ball valve 1 7 Fixing screws 4 6 Single check valve 1 7 Wall plugs 4 Your product may vary slightly from the picture above IMPORTANT Your Mainsboost Charger water performan...

Страница 5: ...space by a rubber diaphragm and pressurised to an optimum setting When water is drawn off by downstream services the water from the mains is supplemented by the water from the Mainsboost unit to provi...

Страница 6: ...clipped to prevent forces being transferred to inlet and outlet branches of pump Flexible hoses supplied must be used 2 15 Flux Solder joints must be completed and flux residues removed prior to pump...

Страница 7: ...e pump in a location where in the unlikely event of a water leak any spillage is contained or routed to avoid electrics or areas sensitive to water damage 3 16 Static inlet pressure Ensure the static...

Страница 8: ...umer s stopcock to the point where the supply reaches the inlet port of the Mainsboost Charger Pump 4 13 Downstream The term Downstream refers to the system configuration from the outlet tapping on th...

Страница 9: ...to mount Charger pump unit Fig 4 1 Fit mounting plate onto wall ensuring level Fig 5 2 Hook pump assembly onto mounting plate and secure in place using M6 set screw Fig 5 Fig 5 Fig 4 Mounting plate P...

Страница 10: ...select the best route 5 Ensure the PRV is securely fitted and connect the flexible hoses provided routing them to the desired case exit points Fig 6 6 Care should be taken not to kink the hoses or be...

Страница 11: ...l box 6 16 Connections The pump must be permanently connected to the fixed wiring of the mains supply using the factory fitted supply cord via a dedicated double pole switched fused spur off the ring...

Страница 12: ...ly to the same factory pattern is always maintained 6 21 If the supply cord is to be changed or damaged it must be replaced by a special cord available from Stuart Turner or one of its approved repair...

Страница 13: ...n stopcock off and leave outlet taps open 7 13 Check the chart below for the correct pump pressure setting against the static mains pressure recorded Warning Note PRV setting must not exceed 5 0 bar R...

Страница 14: ...ess the up down arrows to change the selected parameter s to the desired value z z After changing the required parameter s press the set button twice in quick succession to lock the new value into the...

Страница 15: ...st filling of the system z z Close Mainsboost vessel isolation valve z z Allow the pump to continue running until air has been completely purged from the system all outlets will have to be opened and...

Страница 16: ...ush in x 22 mm push in x 240 mm long Motor Type Induction auto reset thermal trip Duty rating Continuous Electrical Power supply phase frequency 230 V a c 1 50 Hz Current full load 1 8 Amps Power cons...

Страница 17: ...e 9 12 Alarm fault codes All alarms automatically reset except Prt pf1 Displayed message Fault description Action A Hnt high temp cut out Pump head overheating head temperature has exceeded the set Hn...

Страница 18: ...rrect installation improper use unauthorised repair normal wear and tear and defects which have a negligible effect on the value or operation of the unit Reasonable evidence must be supplied that the...

Страница 19: ...19 Cont...

Страница 20: ...65 EU IT IS HEREBY CERTIFIED THAT THE STUART ELECTRIC MOTOR DRIVEN PUMP AS SERIAL NUMBER BELOW COMPLIES WITH THE ESSENTIAL REQUIREMENTS OF THE ABOVE E E C DIRECTIVES RESPONSIBLE PERSON AND MANUFACTURE...

Отзывы: