background image

6.0 Legislation

9

© Baxi Heating UK Ltd 2011

6.1

Installation, Commissioning, Service & Repair

1. This appliance must be installed in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a Gas

Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.

4. In IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.GasSafeRegistered.co.uk

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0051.

Product/Production certified by:
Notified Body 0086.

For GB/IE only.

6.2 

Benchmark Commissioning Checklist

1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).

2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.

3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

4. The Benchmark Checklist may be required in the event of
any warranty work.

Supplied by HeatingSpares247.com

Содержание Combi 24 HE

Страница 1: ...UK Ltd 2011 User s Guide and Important Warranty Information Combi 24 HE Please keep these instructions in a safe place If you move house please hand them over to the next occupier Supplied by Heating...

Страница 2: ...nder Copyrights Designs and Patents Act 1988 Applications for the copyright owner s permission to reproduce or make other use of any part of this publication should be made giving details of the propo...

Страница 3: ...ure Range 35 65 C Power On Indicator The indicator will illuminate when there is power to the boiler Flame Failure Indicator The indicator will illuminate when the burner has not fired Burner On Indic...

Страница 4: ...switched on Reset Power On Indicator Burner On Flame Failure Power On Burner On Indicator Boiler operating satisfactorily bar 0 1 2 3 4 Is the Central Heating System Pressure needle in the GREEN secti...

Страница 5: ...ough 15 10 5 20 2 5 15 10 5 20 2 5 Turn Room Thermostat to maximum setting typical example shown If you don t know what you need to do to get the boiler to light or need help with the system and contr...

Страница 6: ...5 If the pressure falls below 0 5 this may indicate a leak on the central heating system Fig 2 3 2 To Repressurise the System 1 The procedure is for the optional filling loop kit when fitted However e...

Страница 7: ...ol Turn the selector switch fully anti clockwise against the spring pressure to the Reset position and hold for at least 2 seconds If this occurs repeatedly contact your Installer or Service Engineer...

Страница 8: ...so sufficient for routine maintenance However a clearance of 20mm is required if it is necessary to remove the secondary heat exchanger This should be considered when siting the appliance and in the e...

Страница 9: ...ents for new hot water boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0051 Product Production certified by Notified Body 0086 For GB IE onl...

Страница 10: ...7 0 Notes 10 Baxi Heating UK Ltd 2011 Supplied by HeatingSpares247 com...

Страница 11: ...ing their taps to the right towards the wall Fig 7 3 Call your Installer or Service Engineer as soon as possible If you smell gas Do not operate light switches Do not operate any electrical equipment...

Страница 12: ...ould have the following information to hand 1 boiler serial number see opposite 2 boiler make and model number 3 Your installer name and address details 4 Proof of purchase if you do not have the boil...

Отзывы: