6 Technical data
23
ER-A
ER-AK
ER-AH
ER-AB
Additional air volumes that can be set
in base load: 20 m³/h, 40 m³/h, 60 m³/h or 100 m³/h and
in full load: 20 m³/h, 30 m³/h, 40 m³/h or 100 m³/h
●
●***
●
Full load level on/off via light switch or separate switch.
During manual operation (e.g. using light switch), the
start delay and overrun time apply.
●
●
●
●
Full load operation (60 m³/h) with start delay of 60
seconds and overrun time of 15 minutes, non-adjustable
●
Full load operation (60 m³/h), start delay can be set with
0, 30,
60
*, 90 or 120 seconds
●
●
●**
Overrun time of the full load level can be set for 0, 3, 6,
15
*, 24 or 30 minutes
●
●
●
Adjustable interval control for ventilating rooms that are
not regularly used. Time interval can be set for
0
*, 1, 2, 4,
6 or 12 hours, 10 min. operating time per interval
●
●
●
Interval control can be switched off.
●
●
●
Switching option: The base load can be switched on or
off by an additional switch (Wiring diagrams).
●
●
●
●
* Factory setting: Tolerance of time details max. ±
5 %
** For the
ER-AB
, the start delay only affects the
light switch operation.
*** For
ER-AH
humidity control in full load, 40 m³/
h, 60 m³/h and 100 m³/h can be set.
6 Technical data
6.1 Environmental conditions and op-
erating limits
• Permissible maximum temperature of air me-
dium + 40 °C.
• The air supply to the home must be set up so
that virtually no air can flow into the living areas
from the kitchen, bathroom or WC.
• A room from which the air is to be extracted
must be fitted with a non-closable, free supply
air cross section of at least 150 cm², e.g. with
MLK door ventilation grille.
•
ER EC
units have resistance to interference in
line with EN 55014-2 (depending on pulse type
and an energy component of 1000 to 4000 V).
These values can be exceeded when operating
with fluorescent tubes. In this case, additional
interference suppression measures (L, C or RC
modules, protection diodes, varistors) are re-
quired.
6.2 Regulations for operation with
fireplaces
Sufficient supply air intake
must be ensured
during operation with
air-ventilated fireplaces
.
The maximum permitted pressure difference per
residential unit is 4 Pa.
The unit may only be installed in residential units
with air-ventilated fireplaces under the following
conditions:
• the evaluation criteria drawn up by the respons-
ible, regional master chimney sweep are met;
• Parallel operation of air-ventilated fireplaces for
liquid or gaseous fuels and air-extracting equip-
ment can be prevented using safety devices or
• the extraction of exhaust gas from the air-ventil-
ated fireplaces is monitored by special safety
devices. The ventilation system or the fire-
places must be switched off if the equipment is
triggered.
6.3 Technical data table
Rated voltage
230 V
Power frequency
50 Hz
Power consumption
ER EC
and
ER-A
ER-AH
ER-AK
ER-AB
3/5
W*
2/2.5/
3/5
/17W*
Содержание ER-A
Страница 3: ...System bersicht 3 System bersicht...
Страница 18: ...System overview 18 System overview...
Страница 32: ...Vue d ensemble du syst me 32 Vue d ensemble du syst me...
Страница 48: ...Pregled sustava 48 Pregled sustava...
Страница 62: ...Przegl d systemu 62 Przegl d systemu...
Страница 78: ......
Страница 79: ......