| ACX2180H | 5 en
Liability
All data in this program is based
—where possible—on
manufacturer and importer details. MAHLE does not accept
liability for the correctness and completeness of software and
data; liability for damage caused by faulty software and data is
ruled out. Whatever the event, MAHLE liability is restricted to
the amount for which the customer actually pays for the
product. The disclaimer of liability does not apply to damages
caused by intent or gross negligence on the part of MAHLE.
Warranty
Any use of non-approved hardware and software will result in
a modification to our product and thus to exclusion of any
liability and warranty, even if the hardware or software has in
the meantime been removed or deleted.
No changes may be made to our products. Our products may
only be used in combination with original accessories and
original service parts. Failing to do so, will render null and void
all warranty claims.
This product may only be operated using MAHLE approved
operating systems. If the product is operated using an operating
system other than the approved one, then our warranty
obligation pursuant to our supply conditions will be rendered
null and void. Furthermore, we will not be held liable for
damage and consequential damage incurred through the use
of a non-approved operating system.
2.3
Obligation of contractor
The contractor is obliged to ensure that all measures
geared towards the prevention of accidents, industrial
diseases, labor- related health risks are taken and
measures towards making the workplace fit for people
to work in are carried out.
Basic rules
The contractor is bound to ensure that all electrical
equipment and operating material is set up, modified
and maintained by skilled electricians only or under
the guidance and supervision of a skilled electrician in
accordance with electrical engineering principles.
Furthermore, the contractor must ensure that all
electrical equipment and operating material is
operated in keeping with electrical engineering
principles.
If a piece of electrical equipment or operating
material is found to be defective, i.e. It does not or no
longer complies with electrical engineering principles,
the contractor must ensure that the fault is rectified
immediately and, in the event that imminent danger
exists, also ensure that the electrical equipment or
the electrical operating material is not used.
Tests (taking Germany as an example)
The contractor must ensure that all electrical systems and
equipment are tested by a qualified electrician or under the
guidance of a qualified electrician to ensure they are in proper
working order:
—
Before starting for the first time.
—
After modifications or repairs before starting
—
At given intervals. Set intervals such as to ensure that
faults that can be expected to occur are determined in
good time.
The test is to take the electrical engineering principles
relating hereto into account.
Upon request of the free trade association, a test manual is
to be maintained into which specific entries are made.
Содержание ACX2180H
Страница 1: ...MAHLE ACX2180H ...
Страница 2: ...en 2 ACX2180H ...
Страница 35: ...en 35 ACX2180H Maintenance 12 5Notes ...