![MAHA ZS SQUARE II 3.5 Скачать руководство пользователя страница 23](http://html1.mh-extra.com/html/maha/zs-square-ii-3-5/zs-square-ii-3-5_original-operating-instructions_3723645023.webp)
BA322301-en
23
4.2.3
Positioning of the Supports
Flat head supports
Lift the pull-outs at the front and move them so that the pull-outs are
positioned as accurately as possible under the pick-up points. The notched
pin must engage in one of the holes in the pull-out.
2 For granulate-coated pull-outs, place rubber blocks (original accessories)
between the support points and the pull-out. The use of rubber blocks is
optional for pull-outs with rubber pad.
CAUTION
•
When using nubbed rubber pads, the rubber blocks must snap into place.
•
Rubber blocks must generally not
protrude above the pull-out.
•
Accessories for flat head supports
(e.g. rubber blocks) must generally
not be stacked.
CAUTION
•
The notched pin must
not
be positioned in the rectangular cutout (A).
Illustration without rubber pad
•
The pull-out must rest fully on the flat head support.
A
Содержание ZS SQUARE II 3.5
Страница 14: ...14 BA322301 en 2 4 Technical Data 2 4 1 Danger Zone 1000 mm 1000 mm 1000 mm 1000 mm 1000 mm 1000 mm 1000 mm...
Страница 16: ...16 BA322301 en 2 4 3 Set up Diagrams...
Страница 32: ...32 BA322301 en B B 3 4 B C 5...
Страница 52: ...20 PL670000_002 de...