background image

 

 

 

 

 

MPJ 16.5/1200 2S | 3S 

 

Pit Jack 

 

Original Operating Instructions 

 

BA551501-en 

 

 

 

MPJ 16.5/1200 2S FA 
MPJ 16.5/1200 2S TA 
MPJ 16.5/1200 2S HA 

MPJ 16.5/1200 3S FA 
MPJ 16.5/1200 3S TA 

 

 

 

 

Содержание MPJ 16.5/1200 2S FA

Страница 1: ...MPJ 16 5 1200 2S 3S Pit Jack Original Operating Instructions BA551501 en MPJ 16 5 1200 2S FA MPJ 16 5 1200 2S TA MPJ 16 5 1200 2S HA MPJ 16 5 1200 3S FA MPJ 16 5 1200 3S TA...

Страница 2: ...e event of the grant of a patent utility model or design The contents of this edition have been checked with great care However errors cannot be fully excluded Subject to technical change without noti...

Страница 3: ...nd Operating Principle 10 2 2 Compressed Air Supply 10 2 3 Sample Nameplate 11 2 4 Technical Data 11 3 Transport and Storage 13 4 Installation and Initial Operation 13 5 Operation 20 5 1 Controls and...

Страница 4: ...4 BA551501 en...

Страница 5: ...1 1 Personal Injury DANGER indicates an immediate hazard which if not avoided will result in death or severe personal injury WARNING indicates a potential hazard which if not avoided could result in d...

Страница 6: ...dified without the express written consent of the manufacturer In case of non compliance the declaration of conformity be comes void 1 3 Inappropriate Use WARNING Use in any manner other than that int...

Страница 7: ...tioning of the jack under the load may only be carried out by trained per sonnel The vehicle or vehicle components may only be picked up at the points pro vided for this purpose After briefly lifting...

Страница 8: ...the pick up point must be taken to prevent tipping before the jack is lifted again Before lowering the operator must ensure that there are no objects in the movement range of the jack and load Load h...

Страница 9: ...ng and lowering itself on its own or distortion of the supporting components immediately lower the lift or pro vide support In case of malfunction or repair disconnect the pit jack from the air supply...

Страница 10: ...umatic pit jacks with rapid control the oil in the tank is pressurised by compressed air This displaces the oil and the piston quickly reaches the lifting point In the version with air motor LM this u...

Страница 11: ...200 mm Max lifting height in X carriage 2077 mm 1883 mm Noise emission 78 dB A Load capacity 16 500 kg Ambient temperature 5 to 40 C Internal diameter pin 45 mm Outside diameter piston rod 80 mm Heigh...

Страница 12: ...12 BA551501 en A B C...

Страница 13: ...ing into account size weight and the centre of gravity Store the packages in a covered area protected from direct sunlight at a low humidity and with temperatures between 0 40 C 32 104 F Do not stack...

Страница 14: ...ion with the manufac turer For reasons of work safety the jack must be disconnected from the car riage during the installation process To do this loosen all four hex screws A as marked in Fig 1 When u...

Страница 15: ...51501 en 15 2 Secure the freely moving axles against uncontrolled movement in the carriage Lower the carriage and jack into the pit using a suitable hoist Schematic diagram Suitable slings must be use...

Страница 16: ...f the carriage to the respective pit dimen sion To do this loosen the hex screws B Make sure that both side parts are extended as far as possible see di mension X Secure the extensions with hex screws...

Страница 17: ...screws A Fig 1 with a tightening torque of 85 5 Nm to fix the jack For all carriage variants note that the collar of the carriage rollers or the entire carriage in particular must be able to move free...

Страница 18: ...For carriage variants Z adjust the deflector rollers to the pit width and fix them in place by hand tightening the cylinder screws C The carriage rollers must run securely on the rails over the entir...

Страница 19: ...BA551501 en 19 6 If replacements are necessary note the mounting position of the carrier a Top c Tracks of the jack rollers b Bottom b 6 a c...

Страница 20: ...20 BA551501 en 5 Operation 5 1 Controls and Indicators 5 1 1 Double Telescopic Jack A B C D E F G H I J K L...

Страница 21: ...remote control with magnetic holder D Oil sight glass E Lowering spindle F Foot pedal G Load lift control manually operated H Rapid control manually operated I Maintenance unit J Quick coupler K Rapid...

Страница 22: ...22 BA551501 en 5 1 2 Triple Telescopic Jack G F H I A J B C K D E...

Страница 23: ...d extends a little further after the button is released Danger of crushing between piston rod load handling attachment and vehicle Load lift Load lift is controlled via load lift control foot pedal or...

Страница 24: ...of changes in the centre of gravity of the load e g in case of differ ent amounts of fuel in asymmetric fuel systems If necessary use suitable lifting accessories Take note of the operating instructio...

Страница 25: ...BA551501 en 25 Permissible Extension for Pit Jack and Support Systems...

Страница 26: ...only by authorised and trained service tech nicians provided by the manufacturer licensed dealers or service partners In case of non compliance the manufacturer s warranty becomes void 6 2 Care Instru...

Страница 27: ...ass hydraulic oil must be topped up Replace the hydraulic oil depending on ageing water absorption and conta mination but after six years at the latest Only use hydraulic oil of the same specification...

Страница 28: ...unit The oil nebuliser must be adjusted so that approx 1 drop of oil is consumed per stroke This is done by means of a slotted screwdriver which is inserted through the opening in the pneumatic cover...

Страница 29: ...BA551501 en 29 A Pressure gauge B Air connection with pre filter C Condensate drain D Oil regulating screw E Oil sight glass of the maintenance unit A B C D E...

Страница 30: ...ir motor running dry no oil in the maintenance unit Top up oil Air pressure too low local cause Contact service Valve levers blocked mechanical local cause Contact service Control or valve blocked by...

Страница 31: ...spring not fully closed Close lowering spindle Load valves leaking Contact service Unloaded rams are raising slowly at first then get suddenly faster Fluid level too low due to shipping damage or norm...

Страница 32: ...a qualified person during the annual safety inspection 8 Dismantling Decommissioning and dismantling of the equipment may be done only by specially authorized and trained personnel provided by the man...

Страница 33: ...ealth regulations both in design and construction required by the EC directives stated below This declaration becomes void if any change is made to the product that was not discussed and approved by n...