27
BA380801_001-en
Pos: 119 /Produktfamilien/Alle Geräte/Überschriften/Überschriften 1.1/P/Überschrift 1.1: Prüfbestätigungen (Prüfintervall: jährlich) @ 44\mod_1454317504659_75.docx @ 2389060 @ 2 @ 1
6.7
Inspection Certificates (Inspection Interval: Annually)
Pos: 120 /Produktfamilien/Scheinwerfereinstellprüftechnik/MLT-SERIES/380801 MLT 1000/380801_001 MLT 1000 MB/BA/Inhalt: 3808_001 Prüfbestätigung @ 43\mod_1448269740327_75.docx @ 2345732 @ @ 1
Inspection Certificate
The following items have been inspected:
•
Column fixation ...................................................................................... OK
•
Adjustment of projection area at headlight tester .................................... OK
•
Accuracy of laser calibration unit ............................................................ OK
•
Calibration of light intensity/illuminance measurement ............................ OK
•
Adjustment of headlight tester to approach marking .............................. OK
•
Adjustment of guide rails ........................................................................ OK
Date
Name
Signature
Inspection Certificate
The following items have been inspected:
•
Column fixation ...................................................................................... OK
•
Adjustment of projection area at headlight tester .................................... OK
•
Accuracy of laser calibration unit ............................................................ OK
•
Calibration of light intensity/illuminance measurement ............................ OK
•
Adjustment of headlight tester to approach marking .............................. OK
•
Adjustment of guide rails ........................................................................ OK
Date
Name
Signature
Pos: 121 /-----Format-----/MANUELLER UMBRUCH Seitenumbruch @ 0\mod_1134403577687_0.docx @ 1277 @ @ 1
Содержание MLT Series
Страница 33: ......