background image

 

 

 

© 2011 Novatec Inc. All Rights Reserved

 

AL-1 IM 10-20-2011

 

 

Al-1 Compressed Air Loader Instructions

 

Check the air amplifier (see Figure 2, below) and ensure that the index is set at 6 (factory setting).  The 
index setting is marked with a red dot.  The air amplifier setting should never need adjustment under 
normal conditions. 
 
The filter/regulator with gauge and junction box assembly should be mounted in a location that is 
convenient for the operator, making sure that the position will take into consideration all limitations.   
The filter/regulator with gauge assembly must interconnect with: 
 

 

a 115 volt supply outlet  

 

the twist lock plug connection for the photoelectric sensor  

 

the air amplifier for its compressed air connection  

 

the compressed air supply   

 
 
Ensure that your compressed air is clean and dry; otherwise it will contaminate the material.  If the unit 
is used on a drying hopper, wet compressed air will cause a high dew point on the dryer.  Connect the 
filter/regulator to your compressed air supply.  
 

NOTE:  The compressed air supply must be 3/8” NPT, unrestricted line with a shut off valve.  
Quick disconnects that restrict the flow of compressed air should not be used for this connection.  
They are likely to create conveying problems

.   

 

 
 

FIGURE 2 - AIR AMPLIFIER

 

 

Содержание Novatec AL-1

Страница 1: ...COMPRESSED AIR LOADER MODEL AL 1 Document AL 1 IM 10 22 2011...

Страница 2: ...er Instructions TABLE OF CONTENTS Important Notices and Precautions 3 Quick Installation 4 Product Description 4 Principle of Operation 5 Unpacking and Inspection 5 Photoelectric Sensor Diagram 6 Inst...

Страница 3: ...Do not operate unless this instruction manual is completely understood WARNING Disconnect power and compressed air before servicing equipment Only qualified technicians should service equipment CAUTIO...

Страница 4: ...ng hoppers or directly to process machines using compressed air The AL 1 is shipped complete ready for quick set up and use Novatec compressed air loaders only require a 14 0 SCFM 40 PSIG compressed a...

Страница 5: ...ed again once the material level drops This process ensures a steady consistent level of material The loading operation is generated by a solenoid valve which operates in response to the photoelectric...

Страница 6: ...2011 Novatec Inc All Rights Reserved 6 AL 1 IM 10 20 2011 Al 1 Compressed Air Loader Instructions FIGURE 1 PHOTOELECTRIC SENSOR DIAGRAM...

Страница 7: ...ionally tighten down the filter hold down knob and make sure the clamping ring holding the filter is secure CAUTION Do not over tighten the filter hold down knob excessive torque could damage the filt...

Страница 8: ...ilter regulator with gauge assembly must interconnect with a 115 volt supply outlet the twist lock plug connection for the photoelectric sensor the air amplifier for its compressed air connection the...

Страница 9: ...he adjustment until a smooth consistent flow is obtained considering the material characteristics the distance from your material source and the ability of the system to easily pickup and begin moving...

Страница 10: ...or compressed air If the filter is still dirty after cleaning or is damaged the filter element should be replaced 2 Ensure that all supply lines are connected Check the power cord compressed air suppl...

Страница 11: ...lamp 1 50 OD 50049 Clamping Ring 6 88 diameter 08883 Filter regulator with gauge 08992 Cartridge Filter 07978 Silicone Gasket 2 05 OD 08891 Vacuum Hose 1 50 OD 50003 Knob filter hold down 08887 Knob p...

Страница 12: ...rranty contained here Non payment of invoice beyond 90 days will invalidate the warranty A renewed warranty can be purchased directly from Novatec Please note that we always strive to satisfy our cust...

Отзывы: