M A G U I R E P R O D U C T S , I N C .
6
S e r i e s M P A
The tube, properly installed, will be in contact with only the uppermost two
rollers. The inlet end of the tube will be resting against the small recess that is
machined into the side of the pump head that faces front. The tube will pass
through the pump body in a nearly straight line and reappear out the other
side of the pump head.
6. Assuming pump is not already primed, set counter to 60 and run pump in the
'CONTINUOUS' mode until color line is primed.
7. Using the formula provided in this manual, set the counter to the proper setting
for the particular part you are molding.
8. The main switch should now be set on "CYCLE". Your pump will now cycle on
and off each time the process machine screw is cycled.
Pump speed will automatically adjust to match screw return time.
REMEMBER: Experience may show that a somewhat higher or lower counter
setting is required to produce the exact depth of color desired. Once the
proper setting is determined, it should be recorded for future reference.