background image

Maguire Products, Inc. 

 

  

 

64 

VBD

 - Vacuum Dryer

 TSC

 

Parameter Printout 

The Parameter Printout is written to a file on a USB drive.  To write the parameter printout, toggle to the Gear Icon, Print 
Setup, Print Parameters.   

 

Example VBD-150 Parameter Printout:

 

 
VBD-150 Parameters 
 
Tue 09/06/2016 14:34 
CPU Firmware: P0812A 
I/O Firmware: P0812A 
CPU Bootloader: 1.03 
I/O Bootloader: 1.03 
Serial#: 000000-00 
MAC Address: 00:1C:1A:00:4B:0F 
 
INDEX       NAME                     ABBR        RAM        DFT    LO LIMIT   HI LIMIT        UNITS 
 
Blower: 
 
B1          Blower Delay Time         BDT      00402      00402      00000      99999         Second    
B2          VFD Low Limit             BLF      00025      00025      00025      00060         Freq      
B3          VFD High Limit            BHF      00060      00060      00050      00070         Freq      
B4          VFD Drive                 BDF      00060      00060      00000      65535         Freq      
B5          VFD Zero Level            BZL      00045      00045      00000      00100         Percent   
B6          VFD Level Adjustment      BLA      00025      00025      00025      00060         Freq      
B7          VFD Heat Throttle         BHT      00100      00100      00000      65535         Percent   
 
Dispensing: 
 
D1          Vac. Cham. Hi Level       VCH      00013      00013      00000      00560         Weight    
D2          Vac. Cham. Low Level      VCL      00002      00002      00000      00010         Weight    
D3          Ret. Hop. Hi Level        RHH      00015      00015      00000      00728         Weight    
D4          Ret. Hop. Low Level       RHL      00002      00002      00000      00010         Weight    
D5          Bulk Density              BLK      00560      00560      00000      65535         Weight    
D6          Vac.Cham. Fill Rate       VFR      01050      01050      00000      02500         Gram/Sec  
D7          Vac.Cham. Dump Rate       VDR      00000      00000      00000      02000         Gram/Sec  
D8          Chamber Fill Time         VFT      00035      00035      00000      99999         Second    
D9          Chamber Dump Time         VDT      00060      00060      00000      99999         Second    
D10         Fill Lag Time             FLA      00175      00175      00000      00500         Time      
D11         Dump Lag Time             DLA      00100      00100      00000      00500         Time      
D12         Vacuum Gate Delay         VGD      00303      00303      00000      65535         Second    
D13         Chamber Fill Adjust       VFA      00405      00405      00000      65535         Cnt/Pct   
D14         HH Dump Delay             HDD      00004      00004      00000      65535         Second    
D15         Vac. Dump Threshold       VCT      00050      00050      00000      65535         Gram/Sec  
D16         Chamber Dump Retries      CDR      05003      05003      00000      10099         Perc/Ret  
D17         Residence Alarm           RAL      02120      02120      00000      29999         Wt/Min    
D18         Batch Size                BCH      00000      00000      00000      65535         Weight    
D19         Loader Trip Point         LTP      00006      00006      00000      00250         Weight    
D20         Ldr. Thruput Cutoff       LTC      00002      00002      00000      65536         Wt/Min    
D21         Heat Hopper Volume        HHV      00056      00056      00000      65535         Volume    
 
Heater: 
 
H1-1        Preheat Temperature       PTS      00150      00150      00074      00375         Degree    
H1-2        Preheat Time              PHT      00035      00035      00001      00999         Minute    
H1-3        Preheat Targ. Delta       PTD      00030      00030      00000      65535         Degree    
H1-4        Heat1 Temp Set-Point      RTS      00150      00150      00074      00375         Degree    
H1-5        Heat1 Proportional        PT1      00040      00040      00000      00100         Term      
H1-6        Heat1 Derivative          DT1      00015      00015      00000      00100         Term      
H1-7        Heat1 Update Time         UT1      00415      00415      00000      65535         Sec/Sec   
H1-8        Heat1 OverTarg Alarm      OT1      06006      06006      00000      65535         Sec/Deg   
H1-9        Heat1 No Heat Alarm       NH1      00120      00120      00000      65535         Second    
H1-10       Heat1 Set-Point Off.      SO1      03002      03002      00000      65535         Sec/Deg   
H1-11       Heat1 Max. Percent        MP1      00100      00100      00000      00100         Percent   
H1-13       Max Temp Set-Point        MAX      00356      00356      00074      00375         Degree    
H1-14       Energy Saver Mode         ESM      00125      00125      00000      65535         Degree    
H1-15       Energy Saver Time         EST      00030      00030      00000      65535         Minute    
H1-16       Ramp Settings             RMP      52036      52036      00000      99999         Min/Deg   
H1-17       Cool-Down Temp.           CTM      00120      00120      00032      00300         Degree    
H1-18       Cool-Down Timer           CTR      00030      00030      00000      65535         Minutes   
 
Load Cell: 
 
L1          Loadcell Stable Wt.       KDF      00200      00500      00000      65535         Number    
L2          Loadcell Stable Time      LST      00100      00100      00000      65535         Millisec  
L3          Loadcell Zero             LCZ      01000      01000      00000      65535         Number    
L4          Weight Settle Time        WST      00805      00805      00002      65536         Second    
L5          Loadcell 1 Zero           LZ1      00000      00000      00000      65535         Number    
L6          Loadcell 2 Zero           LZ2      00000      00000      00000      65535         Number    
 
Vacuum: 
 
V1          Vacuum Time Setting       VTS      05020      05020      00001      65535         Minute    
V2          Vac. Pressure Low         VPL      00080      00080      00000      65535         Number    
V3          Vac. Pressure Delta       VPD      05020      05020      00000      65535         Number    

Содержание Vacuum Batch Dryer VBD-150

Страница 1: ...MAGUIRE PRODUCTS INC Vacuum Batch Dryer Touchscreen VBD 150 VBD 300 VacuumBatchDryer Touch Screen Controller INSTALLATION OPERATION MAINTENANCE Rev October 5 2018 Copyright Maguire Products Inc 2018...

Страница 2: ...Maguire Products Inc 2 VBD Vacuum Dryer TSC...

Страница 3: ...of the Maguire VBD 150 and VBD 300 it is recommended to read thoroughly these operating instructions Maguire Products Inc accepts no responsibility or liability for damage or malfunction of the equip...

Страница 4: ...this manual or find errors please let us know so that we may make the required corrections or provide you with accurate information Additionally we will gladly provide you with an updated copy of any...

Страница 5: ...Maintenance 51 Drain and purge Air Filter Regulator 51 Air Pressure Adjustments 51 Replacing the Air Filter 51 Loadcell Calibration 52 Temperature and Pressure Verification 54 Cleanout Procedure 55 Va...

Страница 6: ...xpressed or implied and of all other obligations or liabilities on our part and MAGUIRE PRODUCTS neither assumes nor authorizes any other persons to assume for it any other liability in connection wit...

Страница 7: ...C Typically these surfaces are not at dangerous temperatures however all hot surfaces should be avoided Warning Label indicate HOT SURFACES USE CAUTION when removing and installing canisters USE GLOVE...

Страница 8: ...ing Hopper Assembly B Vacuum Chamber Assembly C Retention Hopper Assembly D Control Panel Lifting and Moving components of the Dryer Ensure your lifting equipment is rated to lift the weight of the in...

Страница 9: ...Maguire Products Inc 9 VBD Vacuum Dryer TSC Overall layout and Dimensions VBD 150...

Страница 10: ...Maguire Products Inc 10 VBD Vacuum Dryer TSC VBD 300...

Страница 11: ...rom the pallet Two wheels can be locked With the wheels secured locate the two shipping bolts that attach the VBD 150 to the pallet Unbolt the upper visible nuts from the frame and allow the bolt to d...

Страница 12: ...ence time or running at higher throughputs If the VBD Dryer will use a Heating Hopper Extension it should be installed before the Heating Hopper is installed into the VBD Dryer If you do not have a He...

Страница 13: ...ton head screws and Nyloc nuts Secure the RTD cable to the RTD located on the Loader Adapter Plate Diffuser Assembly Attaching the Heating Hopper A forklift can be used to raise the heating hopper ont...

Страница 14: ...lve recollector hopper 2 Remove the Vacuum Chamber fill valve hopper 3 Install the supplied aluminum Drop Tube Packed separately See next photo 4 Install Drop Tube in large hole in bottom of hopper fr...

Страница 15: ...D Plugs The RTD plugs are different sizes and will only install on the correct outlet Installing the Retention Hopper Unbox the Retention Hopper The Retention Hopper is identified by the red handles l...

Страница 16: ...e right side of the VBD 150 cabinet Lock Slider into Open Position While holding the Slider Lock up pull the Vacuum Chamber slider out When the slider is fully extended release the Slider Lock which w...

Страница 17: ...l the Slider Lock falls into place in front of the Vacuum Chamber Slider locking the Vacuum Chamber Slider into the operating position Connect the air lines Rotate the locking ring fully clockwise to...

Страница 18: ...amber forming a paste inside the vacuum generator It will stop working and require cleaning Observe the air pressure gauge to be sure the pressure maintains 80 psi 5 5 bar while the vacuum generator i...

Страница 19: ...the Dryer Within the cable are four wires Three of the wires are black and labeled with a number 1 2 and 3 The fourth wire is a green yellow wire and is the ground wire Connect power to a properly fus...

Страница 20: ...3 phase connection will result in reversed blower rotation Both methods for checking correct 3 phase connection involve testing the blower rotation Method one requires the disconnecting the 2 inch hot...

Страница 21: ...Dryer TSC Dryer Overview T2 Heating Hopper Outlet Temperature T1 Heating Hopper Inlet Temperature T1s Heating Hopper Air Inlet Temperature Setting T1a Heating Hopper Air Inlet Temperature Actual T4 Ma...

Страница 22: ...et and USB status Navigation Menu Located along the right side of the screen these buttons allow quick navigation to frequently used and top level screens The middle three buttons are soft buttons tha...

Страница 23: ...achine is clear of all material from heating hopper Vacuum Chamber and Retention Hopper To facilitate a Clean Out use the Clean Out function accessible from the home screen Startup and Operation Instr...

Страница 24: ...cuum time is 20 minutes In the vast majority of drying operations this time is adequate and does not need to be adjusted Special circumstances may require different vacuum times Please consult Maguire...

Страница 25: ...the first vacuum cycle is timed The new batch of material in the upper portion of the heating hopper will take less time to heat Minimum time in the heating is dictated vacuum time After first vacuum...

Страница 26: ...perature of the material in the heating hopper to the specified temperature Cooldown Temp over the specified time period Cooldown Time To adjust the Cooldown Temperature and Cooldown Time use the arro...

Страница 27: ...n press Press Dryer Configuration Display will show the Dryer Configuration categories Press Auto Stop Setup Display will show the Auto Stop screen To Enable Auto Stop Press Auto Stop Enabled to enabl...

Страница 28: ...Info The desired weight of material to be dispensed into the Vacuum Chamber Bulk Density Bulk density of material in either pounds per cubic foot or kilograms per liter Cycle Count Total number of cy...

Страница 29: ...05 150 180 300 350 PMMA Acrylic 0 02 0 04 79 175 POM Acetal 0 20 0 10 80 110 180 230 PPO 0 02 100 120 210 250 PPS 0 02 150 300 PUR 0 02 125 140 260 280 PSU 0 02 150 300 SAN 0 20 0 10 80 180 Final mois...

Страница 30: ...ibration zero and full calibration Parameters Operation Parameters Blower BDT Blower Delay Time Seconds BLF VFD Low Limit BHF VFD High Limit BDF VFD Frequency BZL VFD Zero Level BLA VFD Level Adjustme...

Страница 31: ...PL Vacuum Pressure Low VPD Vacuum Pressure Delta VSO Vacuum Shutdown Offset LVT Low Vacuum Timeout NVT No Vacuum Timeout VPT Chamber Purge Timer VPI Chamber Purge Interval ATM Atmospheric Pressure Sys...

Страница 32: ...n display preferences Language Language selection Screen Options Screen saver brightness calibration options Date and Time Weight Units pounds ounces grams kilograms Navigation Bar Options configure r...

Страница 33: ...ower Test Operates the blower Blower OFF ON toggle using ENTER button Aux OFF ON toggle using ENTER button Fail Safe OFF ON toggle using ENTER button T1s Heating Hopper inlet temp setpoint T1a Heating...

Страница 34: ...er test Blower will run during test Heater Output Heater duty cycle expressed in percent Blower Status of blower Control PID or manual Controller will modulate the heater as it would during auto cycle...

Страница 35: ...ions settings The following section describes the features within the Setup Menu Dryer Configuration Setup Menu Option Description Options Alarm Setup Material Shortage Alarm OFF Disables the Material...

Страница 36: ...r determines when a residence alarm will occur based on elapsed time and weight of remaining material in the retention hopper See the RAL parameter for more information ON When the Residence Alarm is...

Страница 37: ...ial away from dryer retention hopper When enabled select Throughput or Weight Reset Totalizer Resets Weighed totals to zero Totals are the amount of material that has been conveyed away from the dryer...

Страница 38: ...t in the retention hopper too long Show Throughput Displays throughput lbs or kgs per hour Show T4 Temperature Displays actual temperature Display Units Fahrenheit F or Celsius C Pounds lbs or Kilogra...

Страница 39: ...see page 49 Resets User Settings Save Restore Settings Used for saving or restoring previously saved parameters For more information on Saving and Restoring Settings see Saving Parameters in the User...

Страница 40: ...T1 PD Loop Update Time Dispensing Parameters OT1 Heat1 Over Target Alarm VCH Vac Chamber Hi Level NH1 Heat1 No Heat Alarm VCL Vacuum Chamber Low Level SO1 Heat1 Set Point Off Percent RHH Ret Hopper Hi...

Страница 41: ...e frequency in Hz that the VFD will run the blower motor with The blower RPMs as well as the airflow are directly proportional to this frequency BZL VFD Zero Level 00045 visible when equipped with an...

Страница 42: ...Rate grams second 00580 Learned dump rate of the Vacuum Chamber in seconds Used to calculate a precise Vacuum Chamber dump time VFT Chamber Fill Time Time in seconds 00035 The time in seconds that the...

Страница 43: ...al in pounds or kilograms that will be dried during a batch run LTP Loader Trip Point weight 1 10 pound or kilogram 00005 If loader 2 downstream loader is enabled and the amount of material in the ret...

Страница 44: ...e Time Time 00415 This parameter has two parts The first three digits is the amount of time in seconds between heat control updates if the heating hopper inlet temperature T1a is ABOVE setpoint The la...

Страница 45: ...Load Cell Parameters KDF Loadcell Stable Weight counts 00500 Maximum allowable fluctuation in raw loadcell counts to produce a stable weight reading LST Loadcell Stable Time milliseconds 00100 Duratio...

Страница 46: ...will run before a LOW VACUUM ALARM is triggered Vacuum generator continues to attempt to pull a target vacuum pressure after alarm sounds NVT No Vacuum Timeout retries time in seconds 00345 The first...

Страница 47: ...lay will show the Dryer Configuration categories Press Parameters Display will show the categories of Parameters Parameters are divided into 6 categories Blower Heater System Dispensing Load Cell and...

Страница 48: ...d run the dryer in Batch Mode follow these steps from the Home Screen Press Start Batch Start Batch button is located on the Home Screen after Batch Mode is enabled Display will show Batch Start Optio...

Страница 49: ...the System Communications categories Press MLAN I D Number Display will show the MLAN I D Number screen On this screen enter the new ID number using the keypad Valid I D numbers are 1 though 254 Press...

Страница 50: ...22 Then press Press Display will show the System Configuration categories Press Communications Display will show the System Communications categories Press Modbus Server Display will show the Modbus S...

Страница 51: ...ssure setting of 85 PSI while the dryer is resting idle Air is used when the vacuum generator is running so observe the PSI while the Dryer is drawing a vacuum The gauge should continue to read this s...

Страница 52: ...show the ZERO FULL Calibration screen Press ZERO Display will say Confirm Vacuum Chamber is empty then press ZERO Gram weight of 0 follows successful calibration Press To return to the Load Cell Setup...

Страница 53: ...re being observed full weigh calibration is recommended periodically approximately every six months Press Display will prompt for a password default 22222 Then press Press Dryer Configuration Display...

Страница 54: ...pressure sensor used for vacuum level readings is accurate to within 2 mm Hg The pressure sensor cannot be calibrated T1a RTD Sensor Verification The T1a RTD sensor is located about 1 3rd the way up t...

Страница 55: ...ing Hopper Dump Chute if equipped The Heating Hopper has a front side door for access to the full internal height of the Heating Hopper The Heating Hopper is non removable Prior to opening the front a...

Страница 56: ...nders Orient the Heating Hopper Dump Chute so that material will exit out the back of the dryer Dump Chute to direct material to a holding vessel Pinch Hazard Keep fingers clear of Heating Hopper Dump...

Страница 57: ...lve button located near the upper rear of the Vacuum Chamber area can be used to empty the Heating Hopper Press Dump Heating Hopper Confirmation window will appear Press to Dump Heating Hopper and sta...

Страница 58: ...he Home Screen Clean Out Dump All Dump All opens all valves allowing material to flow freely through the dryer Material in the Heating Hopper will pass into the Vacuum Chamber and then pass into the R...

Страница 59: ...magnets Lift the Slider Lock located to the left of the Vacuum Chamber While holding the Slider Lock up pull the Vacuum Chamber slider out Release the Slider Lock which will rest on top of the opened...

Страница 60: ...Slider Lock up and push the Vacuum Chamber Slider in until it clears the retaining plate Release the Slider Lock and continue pushing the Vacuum Chamber Slider in Push the Slider rails and Vacuum Cha...

Страница 61: ...g collar up so that the magnets engage onto the bottom of the Vacuum Chamber Raise the Vacuum Chamber by switching up the Vacuum Chamber Lift Switch Pinch Hazard Keep fingers clear of Vacuum Chamber M...

Страница 62: ...s A combination of machine status lines at defined intervals as well as mechanical events as they occur Print Alarm History Prints to USB any alarms recorded since the alarm log was last cleared Copy...

Страница 63: ...F T1a 150F H1 23 1 T2 96F T4 71F VC 00 00 20 00 ABS 760mmHg VC 1 RH 0 TPT 0 TOT 105 10 07 2014 08 39 40 MODE PHT T1s 150F T1a 150F H1 23 1 T2 96F T4 71F VC 00 00 20 00 ABS 760mmHg VC 1 RH 0 TPT 0 TOT...

Страница 64: ...Gram Sec D16 Chamber Dump Retries CDR 05003 05003 00000 10099 Perc Ret D17 Residence Alarm RAL 02120 02120 00000 29999 Wt Min D18 Batch Size BCH 00000 00000 00000 65535 Weight D19 Loader Trip Point L...

Страница 65: ...emp Off HH Level Alarm Off Residence Off Throughput Alarm On Dump Retry On Display Flags Auto Shutdown Off Batch Mode Off Cycle Info On Display Temp Fill Time On Dump Time On I O Status On Preheat Tem...

Страница 66: ...int LTP 00013 00013 00000 00250 Weight D20 Ldr Thruput Cutoff LTC 00002 00002 00000 65536 Wt Min D21 Heat Hopper Volume HHV 00118 00118 00000 00060 Volume Heater H1 1 Preheat Temperature PTS 00150 001...

Страница 67: ...Mode Off Cycle Info On Display Temp Fill Time On Dump Time On I O Status On Preheat Temp Off Preheat Temp On Residence Time Off Screen Timeout Off Vacuum Time On Heat Settings Temperature Unit Fahrenh...

Страница 68: ...heater or the airflow from the blower This parameter and consequent alarm protects the heater from burn out in the event the blower fails or airflow is blocked Solution Check for airflow from the blow...

Страница 69: ...e valve jam The outcome of this alarm is controlled by the Material Shortage Alarm settings See page 35 Solution Check material supply Check Vacuum Chamber fill valve located at the base of the heatin...

Страница 70: ...ot found RESIDENCE ALARM ALARM 23 Problem Material has been in the retention hopper too long This alarm is triggered by the RAL parameter When the Residence Alarm has been enabled this alarm will soun...

Страница 71: ...nu during any instance where the Heating Hopper is called upon to dispense material into the vacuum chamber and the T2 heating hopper exit temperature is below the ESM parameter level this alarm will...

Страница 72: ...Save User Settings Press Save User Settings Display will prompt for confirmation to save user settings Press To save the user settings including parameters or press the red X to cancel and exit Restor...

Страница 73: ...play window Highlight the version in the white panel on the left and press PROGRAM Press To proceed with the firmware update or press the red X to cancel and exit The display will show progress in tra...

Страница 74: ...y the moisture content of the resin after the dryer has done its job Resin moisture content however is not easily measured so dryer manufactures use other criteria to assure performance Conventional d...

Страница 75: ...8 blower noise level 64 db A 63 db A 19 heater power 11 000 watts 11 000 watts 20 vacuum generator model JS 250 Vaccon JS 250 Vaccon 21 heating hopper cylinder I D 13 5 in 343 mm 22 heating hopper cyl...

Страница 76: ...Maguire Products Inc 76 VBD Vacuum Dryer TSC VBD 150 Diagrams VBD 150 I O Board Wiring Diagram...

Страница 77: ...Maguire Products Inc 77 VBD Vacuum Dryer TSC VBD 150 I O Board Wiring Diagram with VFD...

Страница 78: ...Maguire Products Inc 78 VBD Vacuum Dryer TSC High Voltage Wiring Diagrams VBD 150 240V Wiring Diagram...

Страница 79: ...Maguire Products Inc 79 VBD Vacuum Dryer TSC VBD 150 240V Wiring Diagram with VFD...

Страница 80: ...Maguire Products Inc 80 VBD Vacuum Dryer TSC VBD 150 400V Wiring Diagram...

Страница 81: ...Maguire Products Inc 81 VBD Vacuum Dryer TSC VBD 150 400V Wiring Diagram with VFD...

Страница 82: ...Maguire Products Inc 82 VBD Vacuum Dryer TSC VBD 150 480V Wiring Diagram...

Страница 83: ...Maguire Products Inc 83 VBD Vacuum Dryer TSC VBD 150 480V Wiring Diagram with VFD...

Страница 84: ...Maguire Products Inc 84 VBD Vacuum Dryer TSC VBD 150 575V Wiring Diagram...

Страница 85: ...Maguire Products Inc 85 VBD Vacuum Dryer TSC VBD 150 Pneumatic Diagram...

Страница 86: ...e 20A 24 VDC electrical cabinet 12 ehr09 relay SS 480V 25A 24 265 VAC signal electrical cabinet 13 ezd 5t fuse 1 2 amp time delay Midget style electrical cabinet 14 eRTD6 100 RTD temp sensor 6mm dia x...

Страница 87: ...28 mbar 18 blower noise level 77 db A 72 db A 19 heater power 18 000 watts 18 000 watts 20 vacuum generator model JS 250 Vaccon JS 250 Vaccon 21 heating hopper cylinder I D 17 in 432 mm 22 heating hop...

Страница 88: ...Maguire Products Inc 88 VBD Vacuum Dryer TSC VBD 300 Diagrams VBD 300 I O Board Wiring Diagram...

Страница 89: ...Maguire Products Inc 89 VBD Vacuum Dryer TSC VBD 300 I O Board Wiring Diagram with VFD...

Страница 90: ...Maguire Products Inc 90 VBD Vacuum Dryer TSC VBD 300 400V Wiring Diagram...

Страница 91: ...Maguire Products Inc 91 VBD Vacuum Dryer TSC VBD 300 400V Wiring Diagram with VFD...

Страница 92: ...Maguire Products Inc 92 VBD Vacuum Dryer TSC VBD 300 480V Wiring Diagram...

Страница 93: ...Maguire Products Inc 93 VBD Vacuum Dryer TSC VBD 300 480V Wiring Diagram with VFD...

Страница 94: ...Maguire Products Inc 94 VBD Vacuum Dryer TSC VBD 300 575V Wiring Diagram...

Страница 95: ...Maguire Products Inc 95 VBD Vacuum Dryer TSC VBD 300 Pneumatic Diagram...

Страница 96: ...e 20A 24 VDC electrical cabinet 12 ehr09 relay SS 480V 25A 24 265 VAC signal electrical cabinet 13 ezd 5t fuse 1 2 amp time delay Midget style electrical cabinet 14 eRTD6 100 RTD temp sensor 6mm dia x...

Страница 97: ...Maguire Products Inc 97 VBD Vacuum Dryer TSC...

Страница 98: ...Maguire Europe Tame Park Tamworth Staffordshire B775DY UK Tel 44 1827 265 850 Fax 44 1827 265 855 Email info maguire europe com Maguire Products Asia PTE LTD Main Office 15 Changi North Street 1 01 15...