19
Steps of opening a project:
Click a project in “Project List”
The project will load to the Project Name,and then click “OK” to open
Click “Send Data To Destination”
DESTINATION
Connection status indicator:
You can check all the brains connected to H6
All the brains connected to H6 will be identified with its own name. You
can choose any brain to control
One MIG-H6 is able to control several units of MIG-V6 and MIG-V8. These
units can be divided into maximum 6 groups for independent controlling.
Physical status indicator:
Show all the input and output configurations of the brain
Show the real time connecting status of inputs and outputs. Green circle
means there is connection, and it will tell the resolution