OPERATOR’S MANUAL
with Maintenance Information
Maintenance
68
A-6
Perform 30 Day Service
The 30 day maintenance procedure is a one
time procedure to be performed after the first
30 days or 40 hours of usage. After this
interval, refer to the maintenance tables for
continued scheduled maintenance.
Perform the following maintenance
procedures:
• B-3 Inspect the Tires, Wheels and Castle
Nut Torque
• D-2 Replace the Hydraulic Tank Return
Filter Element
Содержание ES0808H
Страница 3: ......
Страница 20: ...OPERATOR S MANUAL with Maintenance Information Decals 15...
Страница 21: ...OPERATOR S MANUAL with Maintenance Information Decals 16...
Страница 106: ...OPERATOR S MANUAL with Maintenance Information Inspection and Repair Log 101 Inspection and Repair Log Date Comments...