background image

14

57-650 Eclipse

®

SIL Functional Safety Manual

7.3

Specific Model 705 Values

7.4

PFD Graph

Proof Test Interval

(months)

PFD avg.

(SIL 2)

PFD avg.

(SIL 1)

0

0.00E+00

0.00E+00

6

2.37E-04

4.05E-04

12

4.69E-04

8.06E-04

18

7.02E-04

1.21E-03

24

9.34E-04

1.61E-03

30

1.17E-03

2.01E-03

36

1.40E-03

2.41E-03

48

1.86E-03

3.21E-03

60

2.33E-03

4.01E-03

72

2.79E-03

4.81E-03

84

3.26E-03

5.62E-03

96

3.72E-03

6.42E-03

108

4.18E-03

7.22E-03

120

4.65E-03

8.02E-03

Eclipse

®

Model 705-51-xx-xxx

Eclipse

®

Model 705-51Ax-xxx

Eclipse

®

Model 705-510x-xxx

SIL

SIL 2

SIL 1

HFT

0

0

SFF

91.0%

84.5%

PFDavg

4.69E-04

8.06E-04

Proof Test Interval

Annually
(refer to table below for
other periods)

Annually
(refer to table below for
other periods)

Specific Model 705

9.00E-03

8.00E-03

7.00E-03

6.00E-03

5.00E-03

4.00E-03

3.00E-03

2.00E-03

1.00E-03

0.00E+00

0

1

2

3

4

5

6

7

8

9

10

Years

P

ro

b

a

b

il

it

y

70

5-5

10

*-*

**

705

-51A

*-**

*

PFD

AVG

(t) Eclipse

®

Enhanced Model 705

Содержание eclipse 705

Страница 1: ...ids slurries or solids with a dielectric constant in the range 1 4 100 to meet the safety system requirements of IEC 61508 IEC 61511 1 Benefits The Magnetrol Model 705 HART provides the following bene...

Страница 2: ...sonnel 6 5 3 Necessary Tools 6 5 4 Storage 6 5 5 Installation 6 5 6 Configuration 7 5 6 1 General 7 5 6 2 Configuration 7 5 6 3 Write Protecting Locking 7 5 6 4 Write Enabling Unlocking 8 5 7 Site Acc...

Страница 3: ...pulse is reflected An ultra high speed timing circuit precisely measures the transit time and provides an accurate level measurement The ECLIPSE Enhanced Model 705 is classified as a Type B device ac...

Страница 4: ...f range i e less than 3 8 mA or greater than 20 5 mA 2 0 1 FOUNDATION fieldbus Although the Enhanced Model 705 is available with FOUNDATION fieldbus output the FOUNDATION fieldbus protocol has not bee...

Страница 5: ...nalysis for the Enhanced Model 705 is based on a MTTR of 8 hours 4 0 Supplementary Documentation The ECLIPSE Enhanced Model 705 Installation and Operating Manual Bulletin 57 600 must be available for...

Страница 6: ...res Open wrenches or adjustable wrench to fit the process con nection size and type Coaxial probe 11 2 38mm Twin Rod probe 17 8 47mm Transmitter 11 2 38mm Torque wrench is highly desirable Flat blade...

Страница 7: ...is is set to 1 4 1 7 for propane and butane or 1 7 3 0 for the majority of hydrocarbon applications FAULT Do NOT choose HOLD for this parameter as a Fault will not be annunciated on the current loop B...

Страница 8: ...Acceptance Testing must be recorded for future reference 5 9 Maintenance 5 9 1 Diagnostics Internal diagnostic testing does a complete cycle 6 times per second 1 every 167mS A message will appear and...

Страница 9: ...od for these tests The system check must be carried out to prove that the overfill protection functions meet the IEC specification and result in the desired response of the safety system as a whole Th...

Страница 10: ...vel from the probe The Status parameter should say Dry Probe and the level reading should be equal to the value in the Level Offset parameter 5 Perform a two point calibration check of the transmitter...

Страница 11: ...instrumented systems accord ing to IEC 61511 1 if the safety instructions and following parameters are observed FIT Failure in Time 1 10 9 failures per hour Product Model 705 51Ax xxx Model 705 510x x...

Страница 12: ...12 57 650 Eclipse SIL Functional Safety Manual 7 2 FMEDA Report Exida Management Summary...

Страница 13: ...13 57 650 Eclipse SIL Functional Safety Manual...

Страница 14: ...03 84 3 26E 03 5 62E 03 96 3 72E 03 6 42E 03 108 4 18E 03 7 22E 03 120 4 65E 03 8 02E 03 Eclipse Model 705 51 xx xxx Eclipse Model 705 51Ax xxx Eclipse Model 705 510x xxx SIL SIL 2 SIL 1 HFT 0 0 SFF 9...

Страница 15: ...nstant domain and that the validity of the calculation is limited to the useful lifetime of each component The table below shows which components are contributing to the dangerous undetected failure r...

Страница 16: ...process any materials that are returned it is essential that a Return Material Authorization RMA number be obtained from the factory prior to the material s return This is available through a MAGNETR...

Отзывы: