
Operation Instructions
MBE35_50 OPERATION MANUAL 2005_10
10
The foundation shall be constructed with at least 2500 PSI grade concrete. The
mounting surface must be leveled to insure a solid base for the barrier gate.
Once the concrete has set to an adequate hardness, the holes for the anchor bolts
can be drilled using the dimensions shown in Fig. S0112 as a guide. Magnetic
Automation Corp. recommends using
∅
3/8” anchor bolts. Please refer to the anchor
bolt manufacturers installation requirements.
2.1 Mounting the housing to the ground
To mount the barrier gate on the concrete surface, follow the instructions below.
1. Carefully remove the gate from its shipping crate.
2. Open the barrier door
3. Place the gate on the desired position on the curb but leave 6”-12” distance from
the front of the housing to the curb line.
4. Place the gate so that the gate arm flange faces the opposite direction of traffic.
Please refer to the figure below and compare the Packing list to assure the
correct flange position (example: MBE35R-C100 = RH, MBE35L-C100 = LH).
5. Using a marker, follow the outside and inside contours to the concrete.
6. Remove barrier gate.
7
"
7.5"
14"
12
4 x Mounting Holes
Housing
S0112
MBE
MB
E