Installation
Delivery and Location
DELIVERY
Each broiler was carefully inspected and packaged before
being tendered to the carrier. Upon delivery of your new
broiler:
•
Uncrate the broiler and check for damage. Most
carriers will accept claims for damage if they are
notified within seven days of delivery and the shipping
container is retained for inspection.
NOTE: The broiler top grid is shipped underneath the
unit. Be sure to remove it before disposing of the
packing crate.
MagiKitch’n cannot assume responsibility for loss or
damage suffered in transit. The carrier assumed full
responsibility for delivery in good order when the
shipment was accepted.
LOCATION
•
Place the unit in a properly ventilated area.
•
Keep the area free and clear of all combustibles such
as paper, cardboard, and flammable liquids and
solvents.
•
This unit requires 0cm minimum clearance to non–
combustible construction. The unit is not approved for
installation in areas with combustible construction.
•
Provisions must be made for an adequate air supply to
the broiler.
•
Keep the area in front of the unit free from
obstructions that could block the flow of combustion
and ventilation air.
•
Be sure there is sufficient clearance at the rear of the
unit for gas connections, regulator and any master
shutoff valve(s) to be installed.
•
The location must provide adequate clearance for
servicing.
Before making any gas connections to this broiler, check
that the available gas supply meets the requirements for
supply pressure and gas type shown on the rating plate on
the front of the unit.
31-01-12962 rev B L25-004 rev 0 5-2001
1
Содержание 600 CE SERIES
Страница 18: ......