Magic Aire HB Series Скачать руководство пользователя страница 8

010-200002-000

Page 8

HB IOM 1.1 2-13-2014

INSTALLATION—DUCTWORK (CONT’D)

Fig. 6 — HB size 60 and 80 Duct

Connections

DUCTWORK CONNECTIONS

Install supply and return ductwork to the
unit as required for the application. Note
that free discharge or free return is ac-
ceptable.

Return Ductwork:

Install return ductwork

by attaching one side of a field-provided
flexible duct connector to the duct flange
on the return side of the unit (filter side).
Attach the other side of the flexible duct
connector to the return ductwork. Seal the
connections using duct mastic or HVAC
tape.

Supply Ductwork—Unit Sizes 04-40:

Install

supply ductwork by attaching one side of a field-
provided flexible duct to the fan discharge duct
collar on the front of the unit. Attach the other
side to the supply ductwork. Seal the connec-
tions using duct mastic or HVAC tape. Refer to
Figure 5.

Supply Ductwork—Unit Sizes 60-80:

Install

supply ductwork by attaching a field-provided
supply duct plenum over the fan discharges.
Supply duct plenum size is critical to fan perfor-
mance—size as indicated in Figure 6.

CAUTION

: DO NOT USE PANTS-LEG TYPE

DISCHARGE DUCT AT THE FAN DISCHARG-
ES. The fans achieve rated performance ONLY
when installed with the supply duct plenum.

Fig. 5 — HB size 04 to 40

Duct Connections

Attach the supply duct plenum to the supply duct
using a flexible connector. Seal the connections
using duct mastic or HVAC tape.

Refer to Fig-

ure 6.

NOTE:

It is acceptable to omit the flexible duct

connectors, but this may allow normal operating
vibration or noise to transfer through the duct sys-
tem

leading to customer complaints.

Size all ductwork according to SMACNA and
ASHRAE duct design standards.

Содержание HB Series

Страница 1: ...zed condensate trap present Is the condensate disposal system operating correctly Is auxiliary external condensate drain pan installed as recommended by IOM not required for valid warranty DX Sys tems...

Страница 2: ...010 200002 000 Page 2 HB IOM 1 1 2 13 2014 THIS PAGE INTENTIONALLY LEFT BLANK...

Страница 3: ...it Suspension 7 External Vibration Isolators 7 Ductwork 8 Electrical 9 14 Service Clearance 15 Condensate Drain 16 Mixing Box Actuator 16 17 Mixing Box Air Sensor 18 Mixing Box 18 Mixing Box Linkage 1...

Страница 4: ...ppropriate instructions including but not limited to those instructions supplied with the outdoor unit if applicable Installation must comply with all applicable local codes GENERAL Installation and m...

Страница 5: ...ators are disconnected BE SURE that fans are properly grounded before working on them Failure to follow these warnings could result in per sonal injury or equipment damage DANGER NEVER enter an enclos...

Страница 6: ...ective cover or grease from fan shaft until ready to install sheave Lay rigid temporary protection such as ply wood walkways in unit to prevent damage to insulation or bottom panel during installa tio...

Страница 7: ...entirely through their associated fasteners It is recommended that framing be constructed from angle iron or formed strut materials Fig 3 Unit Suspension With Mixing Boxes HB units sizes 30 80 with mi...

Страница 8: ...nit Attach the other side to the supply ductwork Seal the connec tions using duct mastic or HVAC tape Refer to Figure 5 Supply Ductwork Unit Sizes 60 80 Install supply ductwork by attaching a field pr...

Страница 9: ...alled electric heat ers have fan starter and overload if required located inside the electric heat control box DANGER NEVER enter an enclosed fan cabinet or reach into a unit while the fan is running...

Страница 10: ...used disconnect switch 75VA 24V control transformer fan relay or contactor or starter with overload if required low voltage terminal block and indoor enclosure 3 Typical wiring is shown For exact wir...

Страница 11: ...rangement similar to MSS wiring see typical wiring diagrams previous page may be field provided and installed to allow the customer s con trols to start and stop the fan Selection of field pro vided a...

Страница 12: ...S INSTALLATION ELECTRICAL cont d NOTES 1 Motor Start Stop Station MSS not required when factory installed electric heat is selected The electric heater contains the fan motor starter and low voltage c...

Страница 13: ...S INSTALLATION ELECTRICAL cont d NOTES 1 Motor Start Stop Station MSS not required when factory installed electric heat is selected The electric heater contains the fan motor starter and low voltage c...

Страница 14: ...tage controls with single point line power connection 2 Units will have Full Line Break heater contactor HC1 starting in 2012 See the unit wiring diagram for actual wiring 3 NOT ALL POSSIBLE WIRING AR...

Страница 15: ...010 200002 000 Page 15 HB IOM 1 1 2 13 2014 HB Series Service Clearances...

Страница 16: ...T condensate drain connection Measure maximum design negative static pressure up stream from the fan Referring to Fig 7 height H must be equal to or larger than negative static pressure at design oper...

Страница 17: ...n actuator arm and link age arm on DR4 See Fig 11 Linkage rod may need to be cut to length Ensure actuator arm and linkage arm are parallel 4 Ensure linkage assemblies are properly secured as shown in...

Страница 18: ...to mixed air sensor 6 Place enthalpy sensor shown in Fig 16 in location suitable to meet manufacturer s requirements 7 Connect all sensors to logic module per manufacturer s instructions 8 Test to ens...

Страница 19: ...nstalled directly on the damper shaft if required If a factory supplied actuator is ordered for the mixing box refer to Mix ing Box Actuator 3 Orientate actuator to avoid interference with linkage ass...

Страница 20: ...14 The actuator should now be able to power the dampers fully open and fully closed without interference Adjust linkage assemblies as need Fig 22 Area A Detailed View Fig 23 Area A Detailed View Insta...

Страница 21: ...channel See Fig 24 Adjustable pitch sheaves are installed on the motor shaft 3 Rotating each sheave a half revolution will determine whether the sheave is wobbly or the drive shaft is bent Correct any...

Страница 22: ...determine correct belt tension use the deflection formula given below and the tension data from Fig 26 as follows EXAMPLE Given Belt Span 16 in Belt Cross Section A Super Belt Small Sheave Pitch Diam...

Страница 23: ...o the condensate line between the trap and the gate valve instead of open to the atmosphere Figure 28 illustrates the typical piping at the end of eve ry steam supply main Omitting this causes many fi...

Страница 24: ...or any trap which has provision for passing air The great majority of high pressure return mains terminate in hot wells or deaerators which vent the air Fig 29 Multiple Coil High Pressure Piping NOTES...

Страница 25: ...as an inner tube pierced to facilitate the distribution of the steam along the tube s length The outer tubes are expanded into plate fins The completed assembly includes the supply and condensate head...

Страница 26: ...eaving side See unit label or certified drawing to assure con nection to matching suction and liquid connec tions The lower split of face split coils should be first on last off Row split coils utiliz...

Страница 27: ...drop solenoid valve control as illustrated above with electric un loaders and let the control algorithm deter mine the combination of solenoid valves and unloaders to limit tons per circuit to accepta...

Страница 28: ...ct insulation Remove all construction debris from unit interior Remove walkway before starting unit FILTERS Install unit filters in all filter sections Protect open filters from drywall dust and const...

Страница 29: ...ervoir Method II Make connection to auxiliary drain valves 4 Fill reservoir with any inhibited antifreeze ac ceptable to code and underwriter authority 5 Open service valve and circulate solution for...

Страница 30: ...supply line and the dirt leg ahead of the trap 2 Use a vacuum breaker in the return 3 Do not use overhead returns from the coil A floodback can occur 4 An immersion thermostat to control outdoor air d...

Страница 31: ...lear space 3 Remove the flat coil stubout panel Refer to Figure 35 and 36 Note that there is another coil access panel on the opposite side of the unit SERVICE Coil Drainpan Removal and Reinstallation...

Страница 32: ...l panel Figure 42 and 43 8 Remove coils from unit along with drainpan Drainpan will slide out of unit Figure 44 or 45 To remove coils and drainpan top will need to be lifted up as shown in Figure 40 9...

Страница 33: ...nation up to 24 hours after sampling A low pH and high alkalinity cause system problems even when both values are within ranges shown The term pH refers to the acidity basicity or neutrality of the wa...

Отзывы: