The boiler need to be installed with cooling valve e.g. DANFOSS BTVS 

¾

 and heating system by 

pressure valve. 

 

CAUTION 

When  you  fire  up  a  new  boiler  for  the  first  time,  condensation  and  discharge  of  the  condensate  from  the 

boiler  may  occur  -  this  is  not  because  of  any  defect  in  the  boiler.  After  a  longer  duration  of  operation  the 
condensation will disappear.  

 

Firing Up and Operation 

Prior to lighting, the heating system’s shut-off valves need to be opened. Open to the maximum possible 

the air intake throttle valve on the ashtray door. Paper and smaller wood chips should be loaded on the grate first. 
Light the paper and shut the door. Once the paper and chips burn sufficiently, add pre-prepared wood intended for 
fuel  purposes.    Once  the  fire  is  established  (fuel  sufficiently  burning),  the  air  intake  throttle  valve  should  be 
throttled  (adjusted  using  the  adjustment  screw)  to  the  minimum  possible  opening  of  approx.  5  mm.  Using  the 
button on the thermostatic draught control unit, adjust the required boiler operating temperature.  When the boiler 
is fired for the first time, the thermostatic valve should be calibrated – see section ‘Calibration’. During firing, the 
chimney  damper  must  be  fully  open.  It  is  important  to  adjust  the  damper  for  the  appropriate  chimney  draught 
during the burning process.    

 
If  necessary,  and  depending  on  the  burning  intensity,  the  boiler  needs  to  be  refueled,  from  time  to  time, 

during  the  operation;  fuel  should  be  added  in  such  a  manner  so  that  fuel  layers  are  evenly  positioned  in  the 
combustion space. Also, the boiler’s condition and the burning efficiency should be visually checked; where wood 
chips  are  used  as  fuel,  even  spacing  should  be  maintained  in  the  longitudinal  direction.  Upon  switching  to  a 
damped night mode, the grate should be cleaned and cause the freshly added fuel to kindle to provide proper fire. 
Afterwards, change to a lower temperature using the thermostatic control unit.  

 

RT3 Draught control unit Calibration  

 
Re-fire the boiler with the door open (open it manually). Using the control unit’s button, adjust temperature 

to 60 °C. When the water temperature reaches 60 °C, allow several minutes for temperature to stabilize and adjust 
the  chain  attachment  so  that  the  door  remains  open  approx.  1  to  2  mm.  Now  you  can  select  the  desired 
temperature.  If,  during  operation  under  steady  conditions,  the  boiler  temperature  is  found  to  be  lower  than  the 
adjusted  temperature,  shorten  the  chain;  and  vice  versa,  if  the  boiler  temperature  is  found  to  be  greater  than  the 
adjusted  temperature,  extend  the  chain.  It  is  also  important  that  you  take  into  account  other  factors  that  might 
affect the boiler temperature irrespective of the temperature control unit status – such as the amount of fuel and ash 
within  the  boiler,  the  secondary  air  throttle  position,  and  thermal  inertia.  See  the  operation  manual  for  draught 
control unit.  

 

 

Boiler Cleaning  
 

The ashtray should be emptied as necessary; please note that if the ashtray space becomes overfilled, 

the air flow into the firing space is restricted, thus causing  poor wood burning efficiency. In the event that 
the  ashtray  space  becomes  obstructed  (or  completely  blocked)  with  tar  deposits,  the  deposited  material 
must be removed manually. 

 
 

Control and Safety Elements  

The chimney damper allows you to adjust the optimum chimney draught.  We recommend that chimney 

draught be adjusted to 0.15 mbar. The chimney damper is actuated using a handle located on the flue inlet 
connection.

 

The combustion air intake throttle is located on the ashtray door and is actuated automatically by the 

thermostatic draught control unit; depending on the heated water temperature inside the boiler heat exchanger and 
the manually adjusted temperature, the thermostatic control unit determines the amount of air flowing into the 

combustion space. 

 
 
 
 
 

Содержание D Premium

Страница 1: ...ra 86 979 01 eren any Slovak Republic Mobile 421 917 465 298 www magasro sk e mail sales magasro sk BOILER OPERATION AND MAINTENANCE MANUAL D Premium HOT WATER STEEL WOOD BOILER Thank you for choosing...

Страница 2: ...must be ensured of at least 15 20 and a minimum return water temperature of 55 C The pump must be connected to the thermoswitch in such a way that it only operates when the required minimum temperatur...

Страница 3: ...al exertion but also time necessary for the work 2 Technical Parameters Boiler Type PREMIUM D 17 D 23 D 28 D 35 Dimensions A mm 1100 1100 1100 1100 B mm 425 425 425 525 C mm 600 700 800 800 D mm 350 4...

Страница 4: ...meet the requirements of STN 07 7401 1992 Slovak Technical Standard In order to ensure proper and safe operation your wood fired boiler must be operated in accordance with the instructions contained...

Страница 5: ...ded fuel to kindle to provide proper fire Afterwards change to a lower temperature using the thermostatic control unit RT3 Draught control unit Calibration Re fire the boiler with the door open open i...

Страница 6: ...n It must not be used for different purposes Fig 1 Connection of cooling exchanger 5 Heating System and Boiler Maintenance You should check the water level in the heating system at least once in every...

Страница 7: ...ontent over 20 use dry fuel dry wood large logs and wood waste poor chimney draught clean your chimney check the connection insufficiently clean boiler clean the boiler blocked filter in the heating s...

Страница 8: ...must under no circumstances be located within a residential space Under any circumstances which might possibly give rise to the danger of penetrating a residential space with inflammable gases or vap...

Страница 9: ...g D 1 Ashtray 2 Bottom door 3 Upper door 4 Heat exchanger plates 5 Honeywel draught control unit 6 Smoke flue outlet 7 Flue damper 8 Hot water outlet DN 40 9 Water grate 10 Return water inlet DN 40 11...

Страница 10: ...example of how the boiler can be connected to a heating system using a 4 way valve There are however many other types of connections For more information please contact appropriate qualified personnel...

Страница 11: ...xtent required by documentation and complies with STN EN 303 5 Slovak Technical Standard 303 5 Product Serial Number Date of Manufacture Manufacturer s Stamp and Signature Date Sold Vendor s Stamp and...

Страница 12: ...ials and or those parts that are subject to normal wear and tear seals and seal cords and fills sibral filling No warranty shall be granted in the event that the customer fails to meet the agreed upon...

Страница 13: ...13 Record of In warranty and Out of warranty Repairs Date Record Entered Service Provided Business Name stamp and signature Customer s Signature...

Страница 14: ...technical documentation and applicable government regulations Product Hot water Boiler D Type D17 D23 D28 D35 Manufacturer MAGA s r o S KOLL RA 86 EREN ANY 979 01 RIMAVSK SOBOTA SLOVAK REPUBLIC The a...

Страница 15: ...ment the customer hereby confirms that they have received the product without any defects damages or problems the product is fully serviceable and that they have been familiarized with proper usage an...

Отзывы: