Maeda MC-285C Скачать руководство пользователя страница 5

5. OUTRIGGER OPERATION 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(1) Outrigger base 

(6) Stay (Damper type) 

(10) Inner box 

OUTRIGGER COMPONENTS

 

 

 

(2) Outrigger cylinder 

(7) Outrigger top position pin 

(11) Outrigger adapter (Foot) 

(3) Outrigger rotary 

(8) Inner box position pin 

(12) Snap pin 

(4) Rotary position pin 

(9) Outrigger top 

(13) Snap pin 

 

There are four outriggers installed on the machine. Although the setting 

method is described for just one outrigger (outrigger (3), set the other three 

outriggers in the same way. 

 

 

 

 

[1] OUTRIGGER SET UP OPERATION 

 

It is forbidden to work with the crane without the outriggers. 

 
(1) TASKS TO BE PERFORMED UPON ENGINE STOP 
 

 

 

 

 

 

 

1. Rotate the outriggers as much as possible (check this with the alignment 

of the “STANDARD” decals). Secure with the position pin. 

2. Open (lift up) the outriggers as much as possible and secure with the 

position pin and snap pin. 

3. Pull out the inner box from the outrigger top as much as possible and 

secure with the position pin and snap pin. 

-5- 

Содержание MC-285C

Страница 1: ...Manual For safety cautions and detailed operation of the machine not explained in this book please read and understand the separate Operation Manual before operating this machine This operation guide...

Страница 2: ...in easy to understand manner This denotes that there is an imminent hazard which will cause serious personal injury or death The method of hazard circumvention is stated This denotes that there is a h...

Страница 3: ...16 Emergency engine stop switch 17 Engine and electric motor switch MC285CRM E only 2 CRANE OPERATION UNITS 1 Acceleration lever 2 Slewing lever 3 Boom telescoping lever 4 Outrigger mode lamp 5 Load m...

Страница 4: ...machine starts Then release the starter switch and it will return to the neutral position 4 STOPPING THE ENGINE WITH AUXILIARY STARTER SWITCH 1 Push the acceleration lever forward and change the engi...

Страница 5: ...cribed for just one outrigger outrigger 3 set the other three outriggers in the same way 1 OUTRIGGER SET UP OPERATION It is forbidden to work with the crane without the outriggers 1 TASKS TO BE PERFOR...

Страница 6: ...utrigger 6 CRANE OPERATION 1 OPERATIONS BEFORE CRANE OPERATIONS CAUTION Before working with the outriggers and the crane set the travel lever stand in CRANE position push the travel lever stand down N...

Страница 7: ...achine or breakage of the boom and are very dangerous Boom lowering operation Boom extending operation Hook raising operation Crane slewing operation 2 OVERLOAD WARNING 1 PRE WARNING Actual load is 70...

Страница 8: ...LED Orange 13 Check switch 14 Cancel switch 15 Load capacity LED Orange 16 Fall mode selector Searcher hook mode switch MOMENT LIMITER DISPLAY 8 REMOTE CONTROL TRANSMITTER 1 LCD Screen 8 Slewing No 1...

Страница 9: ...the cursor points to the OUTRIGGER 8 2 OPERATION IN OUTRIGGER MODE The outriggers of the crane are numbered from 1 to 4 and these correspond to the numbers of each operation lever on the remote contr...

Страница 10: ...The speed of the crane can also be controlled by the MICRO SPEED MODE Just push the speed mode button and each push will forward the LCD screen indication as shown in the diagram to the right 9 ELECTR...

Страница 11: ...ICK OPERATION GUIDE Document No 353E OG0907 00 First edition July 15 2009 Issued by Maeda Seisakusyo Co Ltd 1095 Onbegawa Shinonoi Nagano Nagano 388 8522 Japan No part of this manual can be reproduced...

Отзывы: