INSTALLATION AND COMMISSIONING
6
M A D E L
â
09/15
1.
DAMPER RECEPTION
Unpack the damper and visually check that has not been damaged during transport.
Do a test at the damper (open / close) to verify that it works correctly .
3.
PLACEMENT IN THE CONSTRUCTION SUPPORT
2.
WALL OPENING
A. CONSTRUCTION SUPPORT
Place the damper next the construction support
indicated line which is painted on the label. The
arrows show the construction support direction.
B. TEST MEASUREMENTS
After placing the damper in the correct position
(A ) we measure two perpendicular diagonals of
the front and make sure they are equal. Now you
can lock the damper.
[ES]
FIJACIÓN: INICIO DE MURO
[GB]
FIXING: WALL SITUATION
[FR]
FIXATION: DÉBUT DE MUR
[IT]
FISSAGIO: INIZIO DEL MURO
Circular opening
Ønominal + 80mm
Ø
nominal
+ 1
5mm