Macurco CD-6B Manual (Rev-1.0) Eng
REV – 1.0
[34-2900-0510-2 ]
9
|
P a g e
Figure 3-3 CD-6B Typical Installation wiring diagram
Figure 3-4 CD-6B Typical Installation Layout
NOTE
: The detector should be mounted as close to the primary leak source as possible. If the tanks are inside, the
detector is typically placed as shown above. If the tanks are outside, the detector is typically placed at the
connection points of the conduit.
CD-6B
Mounted ~12”
above floor
CO2
CO2
Horn/
Strobe
Entrance
Horn/
Strobe
Gas
Valves
Содержание CD-6B
Страница 32: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 32 P a g e 9 2 Auto Test bUZ Menu ...
Страница 33: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 33 P a g e 9 3 Configuration CON Menu ...
Страница 34: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 34 P a g e ...
Страница 35: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 35 P a g e ...
Страница 36: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 36 P a g e ...
Страница 37: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 37 P a g e ...
Страница 38: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 38 P a g e ...
Страница 39: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 39 P a g e 9 4 Select Test tst Menu ...
Страница 40: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 40 P a g e 9 5 Calibration CAL Menu ...
Страница 41: ...Macurco CD 6B Manual Rev 1 0 Eng REV 1 0 34 2900 0510 2 41 P a g e 9 6 Sensor Reset SEN Menu ...