
Page | 30
9.
When linking multiple units, start with the power supply. Connect the power to
the first conveyor.
Then using the power linking lead supplied, plug the linking lead into the power
output socket on the end of the conveyor then into the power input socket of the
next conveyor.
Up to 5 conveyors can be powered off a single 5kVA supply.
Ensure the power lead cannot get tangled in the moving belt.
Do not connect the power linking leads whilst the conveyor is in use.