Page | 33
13.
When disassembling the run of conveyors after a project. Plan the routes for
each conveyor and use correct manual handling techniques. Clean each conveyor
before transporting.
Disconnect power before attempting to move any SHIFTA conveyor
14.
When the SHIFTA conveyors are stored. Fold the wheel bogey up into the locked
position and stack the units to maximise space.