Form # 169080
Model Year - 2010
R80 Rotary Disc Pull-Type Mower Conditioner Pre-Delivery Checklist
Perform these checks and adjustments prior to delivery to your customer. See the Unloading and Assembly
Instructions for details. The completed checklist should be retained either by the operator or the dealer.
CAUTION: Carefully follow the instructions given. Be alert for safety related messages which
bring your attention to hazards and unsafe practices.
WARNING: Do not operate the machine with the drive shields open. High speed rotating
components may throw debris and could result in death or serious injury.
Header Serial Number:
_____________________
APT Serial Number
___________________________
9
ITEM PAGE
Check for shipping damage or missing parts. Be sure all shipping dunnage is removed.
-
Check for loose hardware. Tighten to required torque.
4
Check main drive belt tension.
42
Check hourglass deflector drive belts tension (16 ft. only).
42
Check lift roll drive belt tension.
42
Check header angle to middle of adjustment range.
20
Check header flotation. 95-105 lbf (426-471 N)
30
Check tire pressure. 30 psi (207 kPa)
19
Check wheel bolt torque. 120 ft·lbf (160 N·m)
19
Check hydraulic oil level at sight glass on side of articulating power tongue.
16
Check side forming shields evenly set to desired position. Ensure shields are equal distance from
center line of tongue pivot.
33
Check rear fluffer deflector about half way down.
33
Check crop deflector set about half way.
33
Check gauge rollers/skid shoes evenly set (16 ft. only).
10
Check bevel gearbox lube level.
38, 39
Grease all bearings and drivelines.
37-41
Check conditioner roll gap and timing.
44
Check roll intermesh hardware is securely tightened.
44
Check cutterbar curtains hanging properly.
13
Check hydraulic hose and wiring harness routing.
--
Check cutterbar area carefully for loose parts and hardware on the cutterbar.
WARNING:
These objects can be ejected with considerable force when the machine is
started and may result in serious injury or machine damage
.
--
RUN-UP
PROCEDURE
46
Check hydraulic hose and wiring harness routing for clearance when raising or lowering header.
--
Check tail lights and hazard lights are functional.
45
POST RUN-UP CHECKS. STOP ENGINE.
Check belt drives for idler alignment and heated bearings.
42
Check for hydraulic leaks.
--
Check header manuals in storage case.
45
Date Checked: _________________________
Checked by: ________________________