215009
183
Revision A
10248431024843
A
A
B
C
C
1024843
A
A
B
C
C
Figure 4.174: Supporting Frame Using Chain
Method 2:
a.
To protect the finish on the frame, wrap packing
foam (A) (or equivalent) around the approximate frame
locations shown.
b.
Position forks (B) under the packing foam on the frame
as shown at right. Raise the forks and lift the frame
slightly. The forks should not directly contact
the frame.
c.
To secure the frame to the forks, wrap chain (C)
around the end of the forks and attach it to the forklift.
d.
Pick up the frame and position it against the header.
A
B
C
Figure 4.175: Frame
–
Left Side Shown
10. Slowly move forward until lift arm (C) is aligned with
mounting holes (A) and (B) in the frame.
1018549
A
C
B
D
Figure 4.176: Frame Attachment
–
Left Side Shown
11. Install bolt (A) through frame (B) and bushing (D) in the lift
arm. Repeat for the opposite side of the machine.
12. Check gap (C) between the bushing inner steel sleeve (D)
and frame (B). If there is a gap, install 1.2 mm thick flat
washers (MD #5113) to minimize the gap on both sides of
the bushing.
13. Remove bolt (A).
Содержание R113 SP
Страница 3: ...Declaration of Conformity Figure 1 EC Declaration of Conformity 1029750 215009 i Revision A...
Страница 4: ...Figure 2 EC Declaration of Conformity 1029751 215009 ii Revision A...
Страница 14: ......
Страница 210: ......
Страница 214: ......
Страница 222: ......
Страница 232: ......
Страница 238: ......