WINDROWER OPERATION
Form 169469/169470/169471
74
Revision C
4. Remove the L-pin from end (L) of aft section
if installed.
5. Position end (M) of the forward section into
end (L) of the aft section.
6. Lower forward section into aft section.
7. Fully insert L-pin (N) in upper hole and turn
pin to lock it. Secure with ring pin (O)
8. Make the electrical connection at the joint
(Q) and at the header wheel (P).
IMPORTANT
To prevent damage to the lift system when
lowering header lift linkages without a
header or weight box attached to
windrower, ensure that float engagement
pin is installed in storage location (C), and
not
installed at hole location (B).
(continued next page)
L
M
L
M
P
N
O
Q
B
C
Содержание M205 2010
Страница 1: ...M205 Self Propelled Windrower OPERATOR S MANUAL Revision C Part 169469 25...
Страница 51: ...OPERATOR S STATION Form 169469 169470 169471 49 Revision C continued next page...
Страница 95: ...HEADER OPERATION D SERIES Form 169469 169470 169471 93 Revision C continued next page...
Страница 181: ...MAINTENANCE SERVICE Form 169469 169470 169471 179 Revision C 7 10 13 3 Fuse Box Decal...