214805
14
Revision A
3.5
Removing Shipping Stands
To remove shipping stands, follow these steps:
1009171
B
C
A
Figure 3.15: Right Side Shipping Stand
—
Left Side
Opposite
1.
Remove bolts (A) from shipping stands (B) at right and left
sides of header.
NOTE:
For A40D headers only:
Discard hardware (A) from right
and left side shipping stands.
NOTE:
For A40DX headers only:
Discard hardware (A) from right
side shipping stand. Retain hardware from left side
shipping stand.
2.
Remove hairpin in pin (C) and hold shipping stand (B)
steady.
3.
Remove and retain pin (C). Remove shipping stand from
header and reinstall pin (C), and secure with hairpin
retained from Step
.
4.
For A40DX headers only:
Install hardware (A) retained in
Step
at previous location on left side of header
frame, and secure hose support bracket. Torque
hardware (A) to 76
–
183 Nm (56
–
135 lbf·ft).
IMPORTANT:
Ensure bolt heads face upward to avoid damaging routed
hose bundle.
1009172
B
A
Figure 3.16: Shipping Stands
5.
Remove four bolts (A) and remove angle (B). Discard angle
and hardware.
Содержание A40-D
Страница 2: ...A40D Self Propelled Windrower Auger Header 1009163 Published October 2018 ...
Страница 8: ......
Страница 43: ...214805 35 Revision A 1005274 A B Figure 3 63 M150 M155 M155E4 without Reverser Valve ASSEMBLING THE MACHINE ...
Страница 82: ......
Страница 112: ......
Страница 128: ......
Страница 131: ......