OM-230 852 Page 12
5-2.
Installing Work Clamp
1
Insulating Sleeves
2
Nut
3
Work Cable From Unit
Slide one insulating sleeve over
work cable before connecting to
clamp.
4
Work Clamp
5
Screw
6
Work Clamp Tabs
Bend tabs around work cable.
Slide insulating sleeves over
handles.
802 456-A
.
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
Tools Needed:
7/16 in
7/16 in
1
2
3
4
5
6
Содержание MW 185 Plus
Страница 2: ......
Страница 31: ...OM 230 852 Page 27 Notes...
Страница 32: ...OM 230 852 Page 28 SECTION 8 ELECTRICAL DIAGRAM Figure 8 1 Circuit Diagram...
Страница 33: ...OM 230 852 Page 29 228 180 A...
Страница 43: ...OM 230 852 Page 39 Notes...
Страница 49: ...Notes...
Страница 50: ...Notes Work like a Pro Pros weld and cut safely Read the safety rules at the beginning of this manual...