Page
8
of
9
Copyright 2021
–
MAC Rail LLC. Fort Worth, Texas 76244 wwww.macrailproducts.com
STEP 7
–
INSTALL
After your shunt box is completely dry, next we will install on the layout. Depending on
your subbase (foam, hardboard, plaster shell, or plywood) will determine the type of
tool used to create your placement holes.
Using the shunt box legs, mark the location with a pencil or in the case of a softer
subbase like foam make indentions. Continue with creating the placement holes.
Your hole should be large enough to insert the legs and conduit adjacent. In the photo
below I used a clean toothpick to ensure the conduit wires did not become detached or
not go into the hole. Once satisfied with fit, secure with a small amount of white glue.