6.
Mark hole positions - drill holes and insert plugs to
suit 6 x 50 screws ensuring that the wall post is
compressing the EDPM pad.
7.
Using CT1 Adhesive
sealant (available from
your local merchant) apply
in two continuous lines
down the full length of wall
post back.
SUGGESTION: - prior to the
application of the CT1 use some
masking tape along the sides
that will have CT1 applied to
seal the edges. This will allow
excess CT1 to be kept away
from sides and threaded holes
and give a neat tidy finish to the
finally applied areas.
8.
Hold the post in position,
with back against the
wall, so fixing screws can
be inserted into top and
bottom holes.
9.
Using spirit level and
packing shims, tighten
all screws and ensure
that finished wall post is
completely vertical.
Stop Log Barrier System | Installation
7