6.9 COIL ASSEMBLY
INSTRUCTIONS
it over the hole. Slide on ELEMENT SECTION #4
(M2AEP40MC
-
4) and fasten the COIL POST to the tubing
assembling using the supplied hardware. Use you refer-
ence line and adjust the coil so the line has no more tilt
than
3/4”
STEP 8:
Insert the SET SCREW into the COIL POST and
tighten gently. Adjust the COIL and COIL SUPPORT loca-
tion for equally spaced turns. The distance between each
turn should be the same as the COIL wire diameter. Once
the COIL is straight and aligned, tighten the final SET
SCREW securely.
STEP 9:
Slide COIL COVER and COIL END CAPS onto
COIL ASSEMBLY. Secure COIL END CAPS into position
by securing hardware through TUBE ASSEMBLIES on
both ends of the COIL ASSEMBLY. Slide ELEMENT
OVERHEAD SUPPORT onto ELEMENT SECTION until it
reaches the head of the screw holding on the COIL COV-
ER. Clamp ELEMENT OVERHEAD SUPPORT in place with screw and locknut.
STEP 10:
Assemble all the remaining COIL ASSEMBLIES by repeating steps 1
-
9. Set COIL ASSEMBLIES aside for future use.
COIL (15.5 TURNS)
(M2ACA1550)
COIL INSULATOR
(M2AFG0050)
COIL SUPPORT
(M2ACA1554)
ELEMENT SEC-
TION #4
ELEMENT SECTION #6
(M2AEP40MC
-
6))
COIL POST
(M2ACA1551)
SCREW, 8
-
32 X
1
-
1/4”
SET SCREW, 1/4
-
20 X
1/4”
Содержание 6.9-4CDD-125
Страница 14: ...GENERIC COMPRESSION CLAMP DETAIL...
Страница 15: ...LOCK BLOCK DETAIL LOCK BLOCK ROPE ROUTE DETAIL...