background image

STEP 18:

 

 

 Refer to the dimension sheet for element placement. With the boom elevated on sawhorses or equivalent, using a 

long  tape  measure  and  a  permanent  marker  lay  the  boom  out  by  marking  the  centers  of  each  element.  Equalize  the 

amount of extra boom at both ends on the antenna. 

 

 

STEP 19:

 

 

Install  each  element  at  the  marks  on  the  boom.  Be  sure 

the  guy  clamp  in  each  end  of  the  boom  are  in  the  up  position. 

Double check the positions of each element and lightly tighten. 

 

 

STEP 20:

 

 

Standing at one end of the antenna, sight down the boom 

and  reference  each  element  to  one  another  making  sure  each 

element  is  parallel  to  one  another,  make  small  adjustments  as 

needed and tighten.

 

 

STEP 21:

 

 

The PHASING LINES are two 

3/16” 

aluminum rods equal-

ly spaced apart with Delrin STANDOFFS. Slide the two aluminum 

PHASING LINES into the 5 Delrin PHASING LINE STANDOFFS. 

If you bend the PHASING LINES first you will not be able to slide 

on  the  STANDOFFS.  Zip  tie  the  STANDOFFS  to  the  BOOM 

equally  spaced  between  the  FRONT  and  REAR  DRIVEN  ELE-

MENTS.   

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

STEP 22

 

 

Bend  PHASING 

LINES using drawing as an approximate guide.  

 

 

 

 

 

 

 

  

 

 

 

 

 

 

 

STEP 23

 

 

Insert PHASING LINES into THE REAR DRIVEN 

ELEMENT MOUNTS. Tighten nuts.  

 

6.9

-

4CDD

-

125 PHASING LINE AND BALUN

 

ASSEMBLY INSTRUCTIONS

 

FRONT OF 

ANTENNA 

 

REAR OF 

ANTENNA 

 

Содержание 6.9-4CDD-125

Страница 1: ...rea Survival 13 0 Sq Ft 100 MPH Weight Ship Wt 450 Lbs 500 Lbs FEATURES Recently M2 engineers developed a new way to make coils using CNC tooling The result is a precision inductor increasing Q and lo...

Страница 2: ...et specific site requirements A quick review of the assembly drawings should help firm up the appropriate strategy Please remember to double check all hard ware for tightness BEFORE it becomes inacces...

Страница 3: ...6 9 COIL OVERVIEW COIL M2ACA1550 COIL SUPPORT M2ACA1554 COIL INSULATOR M2AFG0050 COIL POST M2ACA1575 QTY 2 COIL END CAP M2ACA1576 QTY 2 NOTE COVER REMOVED FOR ILLUSTRATION PURPOSES BOOM ELEMENT TIP...

Страница 4: ...ess The COIL should thread smoothly Continue until about 5 1 2 turns are past the COIL SUPPORT or close to the center Exact centering is not important Again note your reference line NOTE PENETROX PAST...

Страница 5: ...tighten the final SET SCREW securely STEP 9 Slide COIL COVER and COIL END CAPS onto COIL ASSEMBLY Secure COIL END CAPS into position by securing hardware through TUBE ASSEMBLIES on both ends of the C...

Страница 6: ...ing be low and assemble BOOM SECTIONS as shown Insert hardware and tighten STEP 12 Add the guy clamps to boom sections 1 3 see dimension sheet for location 6 9 4CDD 125 BOOM ASSEMBLY INSTRUCTIONS 3 SC...

Страница 7: ...ater will help in assembly 6 9 4CDD 125 ELEMENT MOUNT ASSEMBLY INSTRUCTIONS BOLT 1 4 20 X 2 3 4 LOCKNUT 1 4 20 QTY 4 ELEMENT MOUNTING PLATE M2AEC0040 QTY 2 ELEMENT CENTER SPLICE M2ASR0050 ELEMENT MOUN...

Страница 8: ...58 X 60 1 5 8 X 058 X 56 1 1 4 X 058 X 60 1 1 4 X 058 X 24 1 1 8 X 058 X 24 1 X 058 X 24 1 1 8 X 058 X 24 1 X 058 X 26 1 X 058 X 27 3 4 X 049 X 27 2 QTY SCREW 8 32 X 1 1 4 LOCK NUT IN SOME CASES THE C...

Страница 9: ...SION CLAMP DETAIL page for more detail STEP 17 Tensioning the element overhead guys Start at the VERTICAL RISER and bend the thimbles open and insert them into the holes on the top plate of the VERTI...

Страница 10: ...NT MOUNTING PLATE M2AEC0059 QTY 2 ELEMENT ASSEMBLY FRONT DRIVEN ELEMENT VERTICAL RISER ASSEMBLY M2AVR0010 BOLT 1 4 20 X 2 1 2 LOCKNUT 1 4 20 QTY 4 ELEMENT MOUNTING PLATE M2AEC0040 QTY 2 BOLT 1 4 20 X...

Страница 11: ...and reference each element to one another making sure each element is parallel to one another make small adjustments as needed and tighten STEP 21 The PHASING LINES are two 3 16 aluminum rods equal l...

Страница 12: ...e plate until the boom straightens Let this stay tight for at lest overnight allowing the rope to stretch and take a set Be sure to tape the rope ends down to the tensioned side of the rope to prevent...

Страница 13: ...SHORTEN THE ELEMENT TIPS AN ADJUSTMENT OF 1 ON EACH END OF THE ELE MENTS THIS RESULT IN AN APPX 20 KC SHIFT 57 00 EXPOSED 1 2 TIP REAR DRIVEN ELEMENT REFLECTOR ELEMENT DIRECTOR ELEMENT 202 00 176 00...

Страница 14: ...GENERIC COMPRESSION CLAMP DETAIL...

Страница 15: ...LOCK BLOCK DETAIL LOCK BLOCK ROPE ROUTE DETAIL...

Страница 16: ...PHASE LINE ROD 3 16 X 132 M2AEP40M4CDD 11 2 SIDE GUY TUBE 2 0 X 065 X 95 M2AEP6 94CDD125 1 2 ELEMENT CENTER SPLICE 1 25 X 24 ALUMINUM ROD M2ASR0050 2 INSULATOR 1 25 X 24 FIBERGLASS ROD M2AFG0034 2 EL...

Страница 17: ...SS 8 BOLT 1 4 20 X 1 0 FLAT ALLEN HEAD SS 4 SET SCREW 1 4 20 X 250 SS 16 LOCKNUT 1 4 20 SS 45 SCREW 8 32 X 2 0 SS 28 SCREW 8 32 X 1 3 4 SS 24 SCREW 8 32 X 1 1 2 SS 48 SCREW 8 32 X 1 1 4 SS 16 SCREW 8...

Отзывы: