
LAMP.HOURS
?
TOTAL.HOURS
?
FACTORY.RESET
(execute)
(Factory reset function in OSD menu for
user)
BLUE.ONLY
= ?
0: Off (Def)
1: On
ALTITUDE
= ?
0: Auto (Def)
1: High
SOFT.VERSION
?
get the software version
Current only reply the
NXP version.
POWON
(execute)
Power the projector on
POWOFF
(execute)
Power the projector off
ACT.SOURCE
?
Query current input
source
IR.ENABLE
= ?
0: Off (Disable)
1: On (Enable) (Def)
OSD.TIMER
= ?
0: Always On
1:10 sec
2:30 sec
3:60 sec
Note: Default setting is 2
(= 30s), current only
command support.
OSD.MENUPOS
= ?
0: Left Upper
1: Right Upper
2: Left Bottom
3: Right Bottom
4: Center
OSD.TRANS
= ?
0: 0%
1: 25%
2: 50%
3: 75%
OSD.MSGBOX
= ?
0: Off
1: ON
COLOR.MODE
= ?
0: Bright (for 2D mode) (Def)
1: D65 Bright (for 2D mode)
STATUS.CHECK
?
0 = Standby
1 = Warm up
2 = Imaging
3 = Cooling
4 = Error
Содержание CINE 400-3D
Страница 1: ...Service Manual M Vision CINE 400 3D HTD 8650 QDPAA AB AC HTD 8650 QDPBA BB BC...
Страница 17: ...2 3 LED Indicator HTD 8650 QDPAA AB AC LED Indicator HTD 8650 QDPBA BB BC LED Indicator...
Страница 28: ...5 Close Tera Term and select file to download And You ll see like follow...
Страница 31: ...Don t do anything at this time Wait about 110 second you ll see like follow It s means Download OK...
Страница 32: ...4 5 How To Download DMD BD U18 U19 1 Make Jig Remove CN1 CN2 And Check J6 Pin1 2 3 is 12V Pin4 5 6 is GND...
Страница 34: ......
Страница 43: ...When you see ACK BOOTOP 9 you can unplug power cord And plug power cord again Don t do anything at this time...
Страница 47: ...Remove CN1 CN2 And Check J6 Pin1 2 3 is 12V Pin4 5 6 is GND Run DLP Composer and check state...
Страница 48: ...If state is fine click Flash Loader select file...
Страница 49: ...Click Reset Bus Click Start Download...
Страница 56: ...10 Wait about 10 sec you can connect 192 168 0 100 When It show that is right version it download OK...
Страница 58: ...Step 3 Open the top cover and unplug the keypad connector Step 4 Take off the top cover to put on the table...
Страница 59: ...Step 5 Confirm the every connector position and wire dressing from the projector...
Страница 61: ...Step 3 Take off the rear cover to put on the table...
Страница 62: ...LEFT COVER MODULE Step 1 Loose the 7 pcs screws on the left side cover Step 2 Take off the left side cover...
Страница 63: ...RIGHT COVER MODULE Step 1 Loose the 3 pcs screws on the right side cover Step 2 Take off the right side cover...
Страница 67: ...Step 6 Loose the 2 pcs screws on the control module and bracket Step 7 Take off the control module...
Страница 70: ...Step 12 Loose the 5 pcs screws on the control module...
Страница 71: ...Step 13 Take off the control board from video board Please kindly be carefully board to board connectors...
Страница 73: ...POWER BALLAST Step 1 Confirm the every wire buckle before taking off the power and ballast board...
Страница 74: ...Step 2 Confirm the every wire buckle before taking off the power and ballast board...
Страница 75: ...Step 3 Loose the 4 pcs screws and unplug 3 connectors to take off the ballast...
Страница 76: ...Step 4 Loose the 4 pcs screws and unplug 4 connectors to take off the power board...
Страница 77: ...DMD BOARD Step 1 Pull out the iron latch and unplug 3 connectors...
Страница 78: ......
Страница 79: ...Step 2 Loose 1 screw on DMD Board Module...
Страница 80: ...Step 3 Loose 4pcs screws of DMD BOARD ASSY and then take out DMD BOARD ASSY...
Страница 81: ...Step 4 Take DMD Module cover out and remove it...
Страница 82: ...Step 5 Loose 6pcs screws and unplug 2 connectors to take out DMD board...