General Mode --- Suficient PV Generation

General Mode --- Insufficient PV and Battery

Operation Modes

M-TEC Hybrid inverter has the following basic operation modes and you can configure the operation mode as per your preference 
in the App.

In this working mode, when the power from the PV array is sufficient, PV power will supply the loads, battery, and grid by the 
following sequence: 

Loads>Battery>Grid. 

PV power will supply the loads with priority, and secondly charge the battery if exceed PV energy, and then feed to the grid. (You 
can set the power to the grid to 0W if the local grid doesn’t allow through APP or inverter display).

When the PV power is insufficient, the battery will discharge to supply loads, and the grid will join in if the battery power is not 
enough.

Setting Step: General Mode-->Pmax.

In this working mode, the customer can set the maximum allowable power from grid("Pmax") through App or inverter display.

When the loads consumption less than the Pmax, loads are supplied by the PV array and grid together.

When the loads consumption more than the Pmax, the power exceeded Pmax (cannot be higher than the inverter max output 
power) will be supplied by the inverter. PV power will take the priority to supply loads and if not enough, the battery will support 
the real-time loading  immediately.

* To realize the “Peak Load Shifting” function, the load power that exceeded Pmax has to be within the inverter max output power, otherwise, 

the inverter will only output the max power which allowed.

1/5 Maximun Solor Self-consumption

2/5 Demand Response

Demand Response --- Loading<Pmax

Demand Response --- Loading>Pmax

Содержание Energy Butler Series

Страница 1: ...Energy Butler Hybrid Series User Manual 1 Energy Butler Series USER MANUAL September 2021...

Страница 2: ...hts of M TEC GmbH and its licensors This material may not be modified reproduced or copied in whole or in part without the prior written permission of M TEC GmbH and its licensors Additional informati...

Страница 3: ...neral installation steps 24 4 3 Cables Connection 27 2 2 Appearance Introduction 12 3 1 Appearance Introduction 18 2 3 Display Interface 14 2 5 Standard Packing List 17 8 Troubleshooting 47 7 General...

Страница 4: ...this document Danger Warning Caution Attention Note This manual uses the following symbols to highlight important information Used to warn of urgent dangerous situations if not avoided it could resul...

Страница 5: ...erter nameplate The inverter cannot be disposed of with household waste Please read the instructions carefully before installation TUV certification Danger Risk of electric shock The surface is hot du...

Страница 6: ...for the installation Warning Do not attempt to open disassemble repair tamper with or modify M TEC LFP Battery M TEC LFP Battery is not user serviceable LFP Cells in M TEC Battery are not replaceable...

Страница 7: ...han those specified in this manual including use of non genuine M TEC parts or accessories or parts or accessories not purchased directly from M TEC or a M TEC certified party Caution Do not place M T...

Страница 8: ...y lithium battery loads and power grid to realize intelligent power management and dispatching Applicable Grid Type The applicable grid types of the M TEC 10kW are TN S TN C TN C S and TT When applied...

Страница 9: ...arge to supply loads and the grid will join in if the battery power is not enough Setting Step General Mode Pmax In this working mode the customer can set the maximum allowable power from grid Pmax th...

Страница 10: ...as the grid is there the battery won t discharge When the grid is cut off power from PV and battery will suppy real time loading connected to inverter back up port immediately within 10ms Inverter wil...

Страница 11: ...its original packaging 2 The storage temperature should be in the range of 30 C and 60 C and the relative humidity stored is less than 90 3 If a batch of inverters needs to be stored the height of ea...

Страница 12: ...GRID ON GRID BAK UP BAK UP Inverter in all in one kit Display Handle Inverter positioner Reserved connection hole DC Switch PV DC Input Terminal PV Battery Input Terminal Back Rail WIFI LAN Port Com...

Страница 13: ...Energy Butler Hybrid Series User Manual 13 Inverter 550mm 175mm 410mm Front Bottom Back Right side PV1 ON OFF PV2B AT WiFi GPRS METER BMS COM ON GRID ON GRID BAK UP BAK UP...

Страница 14: ...in on grid mode 4 Alarm Indicator Off The inverter is running normally Slow flashing The monitoring device is not connected to the router or is not connected to the base station Quick flashing The mon...

Страница 15: ...13 13 Max Short circuit Current A 18 18 18 18 18 18 18 18 Battery Battery Type Lithium Battery with BMS Battery Communication Mode CAN RS485 Battery Voltage Range V 180 750 Max Charge Discharge Curren...

Страница 16: ...ated Residual Current Protection Integrated Islanding Protection Frequency Shift Integrated AC Over voltage Protection Integrated Overload Protection Integrated AC Short circuit Protection Integrated...

Страница 17: ...heck whether the accessories in the packing box are complete at the first time when receiving the goods Inverter in all in one kit 1 AC Cover Screw BAT Plug Monitoring Device optional PV Terminal PE T...

Страница 18: ...1 Appearance Introduction Sub Master BMS Inverter positioner Top Front Bottom Left side Inverter COM Service COM Earth point Battery DC Output Battery DC Output DC Isolator Indicator light Battery pos...

Страница 19: ...dule Battery positioner plug Top Front Right side Bottom Terminal positioner plug Earth cable BMU Power Supply BMU Power Supply CAN L CAN H Battery Positive B Negative pole Handle Battery positioner s...

Страница 20: ...Hybrid Series User Manual 20 356mm 698mm Base module Battery positioner plug Terminal positioner plug Earth cable CAN COM Resistor Pre installed CAN COM Resistor Pre installed Battery Positive B Batte...

Страница 21: ...n order Dimension W H D mm 698 356 137 Weight 11kg Operating Temperature 20 55 Ingress Protection IP21 Optional IP65 need to be confirmed upon order Installation Method Stackable Warranty 10 years Nom...

Страница 22: ...d Sub Master BMS BCU 300MM Positive Power Cables from Battery to Inverter 300MM Negative Power Cables from Battery to Inverter M6 Plastic Expansion Pipe and Self tapping Screw 3 84KWH Li HV LFP Batter...

Страница 23: ...f the inverter installation location should be between 30 C and 60 C The surface temperature of the inverter may reach up to 75 C To avoid risk of burns do not touch the inverter while it s operating...

Страница 24: ...ll the base 2 Install the battery module and Sub Master BMS 3 Install the inverter 4 Cables connection 5 Install the cables cover and wall mounting support Installation procedure summary System compon...

Страница 25: ...the installation environment to ensure ground level Place the base on the ground and make sure it is level and stable After the base is installed the remaining battery and Sub Master BMS are then plac...

Страница 26: ...e Kit put the All in One Kit to the stacked battery and Sub Master BMS Monuting the kit for wall mounted and tighten them with M6 plastic expansion pipes and self tapping screws and screws Connet the...

Страница 27: ...BMS need to be connected The picture on this page shows the cables connection Please follow the instruction and make sure all the cables are connected correctly 4 3 Cables Connection Warning Please m...

Страница 28: ...cause damage to the electronic components of the inverter Anti static measures should be taken during the repairing or installation Attention Do not use other brands or other types of PV terminals ot...

Страница 29: ...J45 BMS RJ45 Meter B B Battery M TEC Hybrid Inverter Meter Danger Do not connect the N wire as a protective ground wire to the inverter casing Otherwise it may cause electric shock Attention Good grou...

Страница 30: ...grounding hole in the lower right side of the inverter Inverter PV string connection The following principles must be considered when making electrical connections to the inverter 1 Disconnect the AC...

Страница 31: ...sional crimping plier pull back the cable with some power to check if it s tight enough 5 Insert the positive and negative cables into the corresponding positive and negative connectors pull back the...

Страница 32: ...the grid side 2 Disconnect the breaker on the battery side 3 Turn the inverter DC switch to the OFF position 4 Make sure the maximum input voltage of battery is within the inverter limitation 180 750V...

Страница 33: ...ver to open the clamping bracket in the connector 4 Insert the stripped DC cable to the battery connector deep enough and toggle the clamping bracket to make sure it tightly locked with the stripped c...

Страница 34: ...any loads cannot be connected with inverter directly 2 Before making the connection of AC cable please confirm all DC AC power source are disconnected from the inverter 3 The M TEC Energy Butler three...

Страница 35: ...ed AC cables through the AC connector cover in the sequence 3 Put the cord end terminals on the stripped conductors one by one and press with some pressure to make it tightly locked with the conductor...

Страница 36: ...cover to the inverter with screws 4 Lock the well pressed cord end terminals into the AC connector in the accessory bag and make sure the cables sequence is in line with the mark on the connector ON...

Страница 37: ...al otherwise the inverter may not be working normally Attention The CT has to be corresponding with the port in the meter and the connection between CT and Meter needs to be reliable otherwise the CT...

Страница 38: ...detect current 6 L1 S2 7 L2 S1 8 L2 S2 9 L3 S1 10 L3 S2 12 L Power supplied from 220V grid 13 N RS485 RS485 Communicate with inverter House Grid 9 10 21 22 23 RS485 5678 1 2 3 4 12 13 Meter terminals...

Страница 39: ...face RLYOUT Dry contact output a group of normally open contact passive dry contact PARCAN EMS RLYOUT Cables BMS COM Cable Screw cap The insulator Screw Com sheet cover Single hole seal ring 2 4 6 1 3...

Страница 40: ...erface cable A 10M length meter communication cable is already attached to the inverter when you received it and this cable could be extended up to 100M Insert the RJ45 heads into the meter RS485 port...

Страница 41: ...to insert it to the BMS interface of the inverter and Sub Master BMS 1 The EMS communication between inverter and battery should be connected through the RJ45 cable that is attached to the inverter wh...

Страница 42: ...regulation and M TEC doesn t provide the DRED device for the customer DRED connection uses the 6pin terminal on the left side and you can use the matching 6pin terminal in the accessory box to make t...

Страница 43: ...rding to your preference Plug the WiFi or LAN module into the WiFi GPRS port in the bottom of inverter by following the direction the side with indicator is up A slight click sound during the installa...

Страница 44: ...which you set on the App The inverter display and indicators will show relative parameters and status Turn on the DC Switch on the Sub Master BMS When the indicator light on the Sub Master BMS flashi...

Страница 45: ...General Settings Fault Info Modbus Addr Power Factor Product Model RSSI Time Set Feed in Grid xxx H Total Safty Set Safty Code Language Set Export Limit Meter E Total WorkMode Set Battery_ID Set Batt...

Страница 46: ...3 Remote set as 0 Local set as 1 then the test order is 59 S1 59 S2 27 S1 81 S2 81 S2 Connect the AC cable auto test will start after the inverter connected to the grid see the operation steps below...

Страница 47: ...electricity company DCI Fault 1 Restart the inverter 2 Seek for help from the installer or manufacture ISO Over Limitation 1 Restart the inverter 2 Seek for help from the installer or manufacture GFC...

Страница 48: ...least 5 minutes for inner capacitors to discharge completely 3 Verify that there is no voltage or current before pulling any connector Caution Keep non related persons away Caution A temporary warnin...

Страница 49: ...Energy Butler Hybrid Series User Manual 49 Tel 43 7612 20805 Website http www mtec wp com Address Aum hlweg 20 4812 Pinsdorf...

Отзывы: