Energy Butler Hybrid Series
User Manual
25
Step1. Install the base
Step2. Install the battery module and Sub-Master BMS
*1
*1
*1
*1
*1
*1
*1
*1
Check the installation environment to ensure ground level. Place the base on the ground, and make sure it is level and stable.
After the base is installed, the remaining battery and Sub-Master BMS are then placed in turn. Once each battery or Sub-Master
BMS is in place, tighten it with four m4 screws on the left and right side.
*1: M4 screws
*1: M4 screws