manualshive.com logo in svg
background image

MD7PL

EM-8062  Rev.4  P. 2 / 5

 

DIELECTRIC STRENGTH TESTING

• 

The surge protector starts discharging when 160V or
greater voltage (with floating shield type) or several volts
(with grounding shield type) is applied between lines and
earth.  Remove the grounding wire before conducting a
test.  Be sure to return the wire after the test.

 

AND ....

• 

We recommend that you keep spare surge protectors so
that you can replace them when necessary.

• 

Lightning surge can enter not only through signal lines
but also through power supply lines.  We recommend that
you also use the Lightning Surge Protector for Power
Lines for adequate protection.

COMPONENT IDENTIFICATION

Body

Spring Loader

DIN Rail Mounting

Adaptor (for grounding)

Connection

Diagram

(left side)

Model No.

Indication

INSTALLATION

Mount the unit on a DIN rail.  Once installed, do not move 
it to another DIN rail.

 

MOUNTING THE UNIT ON A DIN RAIL

A) Hang the upper hook of the DIN rail mounting adaptor at 

the rear side of unit, on the DIN rail.

B) Push in the lower in keeping pressing the unit to the DIN 

rail.

C) DIN rails generally have slight individual variability in

size.  If you find it difficult to push in the lower part, go

back to (A) and hang the upper part more deeply onto the

rail and try (B) again.

A

DIN Rail

B

 

REMOVING THE UNIT

A) Push down the spring loader utilizing a minus screwdriv-

er.

B) Confirm that it is pulled enough down and pull out the

lower part of the unit.

C) Detach the upper part from the DIN rail.

A

B

Spring Loader

C

056 222 38 18

[email protected]

www.sentronic.com

SENTRONIC

AG

Отзывы: