CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Check DIP switch setting.

3) Power input voltage:  Check voltage across the terminal 

10 – 11 with a multimeter.

4) Input:  Check that the input signal is within 0 – 100% of 

the full-scale.

5) Output:  Check that the load resistance meets the de-

scribed specifications.

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Without linearization, warm up the unit for at least 10 
minutes.  Apply 0%, 25%, 50%, 75% and 100% input signal.  
Check that the output
signal for the respective input signal remains within accu-
racy described in the data sheet.  If the output signal is out 
of accuracy, when the input display value is out of accuracy, 
perform the input fine adjustment.  When the input display 
value is correct but the output is out of accuracy, perform 
the output fine adjustment.  Refer to this manual, when 
adjusting with front buttons.  Refer to the M2ECFG users 
manual (EM-5147), when adjusting with M2E Configurator 
Software (model: M2ECFG).  And then follow the procedure 
shown below.

• 

INPUT FINE ADJUSTMENT

1) Set the input signal to 0 %, and adjust the input display 

to 0 % by [69] Input Zero fine adjust.

2) Set the input signal to 100 %, and adjust the input dis-

play to 100 % by [70] Input Span fine adjust.

3) Again set the simulated input to 0 %, confirm the input 

display.

4) If input display is shifted, repeat the procedure from 1) 

to 3).

• 

OUTPUT FINE ADJUSTMENT

1) Set the simulated input to 0 %, and adjust the output 

signal to 0 % by [71] Output Zero fine adjust.

2) Set the simulated input to 100 %, and adjust the output 

signal to 100 % by [72] Output Span fine adjust.

3) Again set the simulated input to 0 %, confirm the output 

signal.

4) If output signal is shifted, repeat the procedure from 1) 

to 3).

LIGHTNING SURGE PROTECTION

M-System offers a series of lightning surge protector for 
protection against induced lightning surges.  Please contact 
M-System to choose appropriate models.

Содержание M2EXM

Страница 1: ...urations connected devices connected wires may af fect the protection level of this unit when it is integrated in a panel system The user may have to review the CE requirements in regard to the whole system and employ additional protective measures to ensure the CE conform ity Install lightning surge protectors for those wires connect ed to remote locations POWER INPUT RATING OPERATIONAL RANGE Loc...

Страница 2: ...OUNTING Set the base socket so that its DIN rail adaptor is at the bottom Position the upper hook at the rear side of base socket on the DIN rail and push in the lower When removing the socket push down the DIN rail adaptor utilizing a minus screwdriver and pull WALL MOUNTING Refer to the drawings in the shown below TERMINAL CONNECTIONS Connect the unit as in the diagram below or refer to the conn...

Страница 3: ...to shift through setting parameter and to increase or select setting value Down button Used to shift through setting parameter and to decrease or select setting value Configurator Jack Used to configure with M2E configurator software model M2ECFG At the same time set the lock out setting of the unit to lock DIP SWITCH The internal DIP switch for output setting is required to select output types be...

Страница 4: ...ay value is correct but the output is out of accuracy perform the output fine adjustment Refer to this manual when adjusting with front buttons Refer to the M2ECFG users manual EM 5147 when adjusting with M2E Configurator Software model M2ECFG And then follow the procedure shown below INPUT FINE ADJUSTMENT 1 Set the input signal to 0 and adjust the input display to 0 by 69 Input Zero fine adjust 2...

Отзывы: