WIRING INSTRUCTIONS

 

SCREW TERMINAL 

Torque: 0.8 N·m

CHECKING

1) Terminal wiring:  Check that all cables are correctly con-

nected according to the connection diagram.

2) Power input voltage:  Check voltage supplied to the rack 

(model: 18BXx or 18KBXx).  For the DC power source, be 

sure that the ripple level is within 10% p-p.

3) Input:  Check that the input signal is within 0 – 100% of 

the full-scale.

4) Output:  Check that the load resistance meets the de-

scribed specifications.

ADJUSTMENT PROCEDURE

This unit is calibrated at the factory to meet the ordered 
specifications, therefore you usually do not need any cali-
bration.
For matching the signal to a receiving instrument or in case 
of regular calibration, adjust the output as explained in the 
following.

 

HOW TO CALIBRATE THE OUTPUT 

Use a signal source and measuring instruments of sufficient 
accuracy level.  Turn the power supply on and warm up for 
more than 10 minutes.

1) ZERO:  Apply 0% input and adjust output to 0%.
2) SPAN:  Apply 100% input and adjust output to 100%.
3) Check ZERO adjustment again with 0% input.
4) When ZERO value is changed, repeat the above proce-

dure 1) – 3).

MAINTENANCE

Regular calibration procedure is explained below:

 

CALIBRATION

Warm up the unit for at least 10 minutes.  Apply 0%, 25%, 
50%, 75% and 100% input signal.  Check that the output 
signal for the respective input signal remains within accu-
racy described in the data sheet.  When the output is out of 
tolerance, recalibrate the unit according to the “ADJUST-
MENT PROCEDURE” explained earlier.

LIGHTNING SURGE PROTECTION

M-System offers a series of lightning surge protector for 
protection against induced lightning surges.  Please contact 
M-System to choose appropriate models.