75-108 Meteor Snowblower
Assembly Information
1.
2 set Hood Bearing Assembly
2.
4 pc 5/8 Wavewasher
(thin)
3.
2 pc 5/8 x 2 UNF Bolts
4.
2 pc 5/8 UNF Locknut
5.
1 pc 2 hole Chute Clamp
6.
1 Assembly Instructions
Upon Receiving the Meteor Snowblower
The blowers are shipped in a packaged state
These blowers are packaged without hood turner device.
Carefully remove the chute and PTO shaft from the area of the auger and set them aside. Locate
the bag or package of small components.
Remove the ties that hold the Plastic ring on the blower and place the base of the chute on top of
the plastic ring. (Note: Plastic Ring can be lightly coated with grease at this time.)
Take two 5/8 bolts and drop them down through the chute clamp, turn the clamp upside down
while holding the bolts in the holes. place a 5/8 wave washer on the bolts, then a 5/8 bearing and
finish off with a second 5/8 wave washer. Turn the clamp right side up with the washers bearings
on the bolts. Carefully insert the bolts into the mounting holes and secure with locknuts.
Install the PTO with the shear bolt yoke at the gearbox.
This will provide more space to change
the shear bolt.
Wave Washer
5/8 Bolt
Chute Clamp
Plastic Ring
Chute
6
Содержание Meteor 97D
Страница 12: ...97D 108 Parts 11...
Страница 24: ...PTO Installation Instructions for Snowblower 23...
Страница 28: ...Effective PTO Drive Shaft Maintenance 27...