background image

Comer T90 540 RPM PTO 

 

Item # 

Description 

Part# 

Req 

Complete Collar Yoke   1 3/8 - 6T 

141.025.319 

Cross Journal Set                            41x108 

180.019.130 

Outer Yoke 

151.019.127 

11 

Roll Pin for Outer Yoke 

190.000.243 

12 

Bushing with Grease Fitting 

180.018.210 

14 

Complete Outer Tube 

152.198.520.0720 

15 

Inner Tube 

153.190.507 

16 

Roll Pin for Inner Tube 

190.000.243 

21 

Inner Yoke 

151.019.128 

30 

Complete Shear Yoke                 1 3/4-20T 

143.290.005 

31 

Guard Retaining Collar for Outer Tube 

180.019.121 

33 

Special Plastic Bolt 

190.000.019 

37 

Guard Retaining Collar for Inner Tube 

180.019.122 

38 

Safety Chain 

180.016.025 

40 

Complete Shield with Instruction Manual 

142.290.225.7920 

51 

Outer Circlip 

190.000.451 

52 

Sliding Sleeve Collar 

151.016.486 

53 

Spring 

180.016.487 

54 

Fixed Sleeve Collar 

180.016.483 

55 

Ball 1/2" 

dia 

190.000.078 

71 

Yoke for Hub 

151.019.136 

72 

Ball 5/6" 

dia 

190.000.023 

24 

73 

Bolt and Nut  M16x2x80  

165.000.576 

74  

Hub                                     1 3/4 - 20T 

151.019.139 

75 

Bolt and Nut           M12x65 cl8.8 

165.000.512 

76 

Grease Fitting M10x1 

190.000.021 

90 

U Joint Outer Tube 

121.029.572.10 

91 

U Joint Inner Tube 

121.029.523.10 

94 

Half Female Guard 

142.291.105.7920 

95 

Half Male Guard 

142.291.205.7920 

96 

Half Female Shaft with Guard 

123.390.039.10 

97 

Half Male shaft with Guard 

123.290.304.10 

98 

"Danger" Label for Outer Tube 

190.000.216 

99 

"Danger" Label for OUter Guard Tube 

190.000.215 

100 

Instruction Manual 

190.000.371 

200 

Kit Collar              1 3/8" 

165.000.628 

 

Note: 

This PTO has 1 3/8 - 6 tooth yoke on one end and 1 3/4 - 20 tooth yoke on other end 

Cross Bearing is 41mm or approx 1 5/8" dia 

 

19

Содержание Meteor 97D

Страница 1: ...Owners Manual Parts List for 97D 108 Double Auger Snowblower M K Martin Enterprise 3950 Steffler Rd Elmira Ont N3B 2Z3 519 tel 664 2752 fax 664 3695 E mail sales mkmartin ca Snowblowers rev 12 1...

Страница 2: ...tion 5 Assembly Information 6 Operation 7 Main Parts 8 Chute Rotator 9 Gearbox Parts 10 Comer T 80 540 RPM PTO 11 Comer T 90 540 RPM PTO 12 1000 RPM Reduction Gearbox 13 Comer T 80 1000 RPM PTO 14 Can...

Страница 3: ...any s liability shall be limited exclusively to replacing or repairing without charge at it s factory or elsewhere at it s discretion any material or workmanship defects which becomes apparent within...

Страница 4: ...n this book Caution Indicates a potentially hazardous situation that may result injury Warning Indicates a potentially hazardous situation that could result in serious injury or death Danger Indicates...

Страница 5: ...ety instructions with all users annually This equipment should not be operated by children or those unfamiliar with the operation of the Meteor Blower Do not allow persons to operate this machine unti...

Страница 6: ...art canada2x2 A Decal is Located on both sides B Decal is located on the cross shaft shield C Decal is located on the PTO shield D Decal is located on the front of fan E Decal is Manufacture s brand a...

Страница 7: ...old the Plastic ring on the blower and place the base of the chute on top of the plastic ring Note Plastic Ring can be lightly coated with grease at this time Take two 5 8 bolts and drop them down thr...

Страница 8: ...s mounted with 4 5 16 bolts as shown When installing the hydraulic elbows turn them in not more than 4 rounds then tighten the jamnut to secure the elbow in the direction that you want the hoses to go...

Страница 9: ...the surfaces and slide the shaft together to be sure that it slides freely 6 Make sure the plastic shield is free to rotate on the shaft before installing on the machine 7 Reinstall the PTO on the blo...

Страница 10: ...e is gravel then you may want to shorten the top 3PH link to tilt the blower back so it will not dig into the loose gravel In colder climates where the bare ground is frozen during most of the winter...

Страница 11: ...ate this equipment until such information has been reviewed annually review this information before the season start up Make these reviews of SAFETY and OPERATION annually as a standard practice for a...

Страница 12: ...97D 108 Parts 11...

Страница 13: ...lw n OL 4 OL 4 19 Flangett 519 1081174 2 519 1081174 2 20 Bearing Insert 519 1081175 1 519 1081175 1 21 Bolts 5 8 x 1 1 4 c w lw OL 8 OL 8 22 Idler Sprocket 519 1082029 1 519 1082029 1 23 Flat Washer...

Страница 14: ...71702 10 53 3 Hole Clamp 519 108116209 1 519 108116209 1 54 Anti Friction Ring 519 1081161 1 519 1081161 1 55 Bolt 5 8x2 c w ln OL 5 Ol 5 56 2 Hole Clamp 519 108116309 1 519 108116309 1 57 Plow Bolt 5...

Страница 15: ...id 519 2 4 Crossover Relief Valve 519 511705 1 5 Socket Head Cap Screw 5 16x1 1 2 OL 4 6 Small Gear 519 511706 1 7 Right Shield 519 108170709 1 8 Left Shield 519 108170809 1 9 Elbow 519 9515 10 6 2 10...

Страница 16: ...Gear Z21 M7 14 519 0 279 6000 00 1 11 Gasket 519 0 248 7200 00 1 12 Gear Z21 M7 14 519 0 279 5000 00 1 13 Bearing 30209 519 8 0 9 00125 2 14 Shaft 1 Z20 519 0 279 2000 00 1 15 Extension AC 519 0 279 1...

Страница 17: ...Comer T80 540 RPM PTO Note This PTO has 1 3 8 6 tooth yoke on one end and 1 3 4 20 tooth yoke on other end Cross Bearing is 35mm or approx 1 3 8 dia 16...

Страница 18: ...1 52 Sliding Sleeve Collar 151 016 486 1 53 Spring 180 116 487 1 54 Fixed Sleeve 180 016 483 1 55 Ball 1 2 dia 190 000 078 3 56 Yoke 151 018 423 1 71 Yoke for hub 151 018 023 1 72 Ball 5 16 dia 190 00...

Страница 19: ...Comer T90 540 RPM PTO Note This PTO has 1 3 8 6 tooth yoke on one end and 1 3 4 20 tooth yoke on other end Cross Bearing is 41mm or approx 1 5 8 dia 18...

Страница 20: ...451 1 52 Sliding Sleeve Collar 151 016 486 1 53 Spring 180 016 487 1 54 Fixed Sleeve Collar 180 016 483 1 55 Ball 1 2 dia 190 000 078 3 71 Yoke for Hub 151 019 136 1 72 Ball 5 6 dia 190 000 023 24 73...

Страница 21: ...il Seal 45x65x8 519 1084059 1 11 Bolt 5 16 18 unc x 4 OL 10 12 Nut Lockwasher 5 6 18 unc OL 10 13 Key 1 2x1 2x2x1 2 519 1084060 1 14 Input Cover without hole 519 1084061 1 15 O Ring AS 248 519 1084062...

Страница 22: ...Comer T80 1000 RPM PTO Note This PTO has 1 3 8 21 tooth yoke on one end and 1 3 4 20 tooth yoke on other end Cross Bearing is 35mm or approx 1 3 8 dia 21...

Страница 23: ...1 1 52 Sliding sleeve collar 151 016 486 1 53 Spring 180 016 487 1 54 Fixed sleeve 180 016 483 1 55 Ball 1 2 dia 190 000 078 3 71 Yoke for hub B35 151 018 023 1 72 Ball 5 16 dia 190 000 023 24 73 Bolt...

Страница 24: ...PTO Installation Instructions for Snowblower 23...

Страница 25: ...very high too large angles at PTO universal joints will result and the life of the universal joints will be shortened dramatically P T O Shaft angles PTO shafts are made to transmit power with angle a...

Страница 26: ...nal gearbox is also available that can be mounted on the existing snowblower gearbox which increases the input shaft height reducing the angle at PTO joints This Gearbox has an input speed of 1000RPM...

Страница 27: ...acity to shock load These shafts cannot be broken under normal loads However undesirable objects may enter the fan and either bend or break the gearbox shaft It is understood that the gearbox cannot b...

Страница 28: ...Effective PTO Drive Shaft Maintenance 27...

Страница 29: ...shafts may have a locking collar Damages Causes and corrective actions will still be similar Avoidable Damage Possible Causes Corrective Actions Deformed Yoke Excessive shaft length Axial load too hig...

Страница 30: ...ity between shaft and working conditions Carefully follow greasing instructions Replace defective cross bearings Note Cross bearings must be greased every 8 working hours Avoidable Damages Possible Ca...

Страница 31: ...llow for maximum angularity Replace defective parts Guard cone damaged Guard cone in contact with implement or tractor Excessive angularity Eliminate interference between guard cone and any part of im...

Страница 32: ...9 12 12 17 5 16 10 13 19 25 27 36 3 8 20 27 33 45 45 63 7 16 30 41 53 72 75 100 1 2 45 61 80 110 115 155 5 8 95 128 160 215 220 305 3 4 165 225 290 390 400 540 1 225 345 630 850 970 1320 Allen head ca...

Страница 33: ...By using too much grease you will push the seals off the bearing PTO Shaft grease every 10 hours Pull apart and apply grease to he sliding members Grease the yoke bearings at this time as well Auger...

Отзывы: