background image

139-0498-02.27

27

Chapter Five--Control Setup

Figure 5-3:  Interface options

Port Type

The port type section is used to select the preferred 
communication protocol.  The controller defaults to Ethernet 
(TCP/IP) for setup but can be controlled in conjunction with 
RS-232, sACN or DMX-512 protocols.  

RS-232

For RS-232 operation use the following steps:

Select a baud rate in the dropdown box from 300 to 115,200 
Baud.  The default is 9600.  The data structure is set at 8 Data 
bits, 1 Stop bit and No Parity bit (8,1,N).  Then set the ON and 
OFF thresholds in either the 0-255 range or the percentage 
range.

Содержание RPC

Страница 1: ...139 0498 02 11 7 14 Remote Power Controller Instruction Bulletin Retain for future use LynTec RPC...

Страница 2: ...al for untrained persons No responsibility is assumed by Square D for any consequences arising out of the use of this manual This equipment has been tested and found to comply with the limits for a Cl...

Страница 3: ...RS 232 17 RS 485 17 Switch Wiring Instructions 18 LynTec SS 2 Switch Set 18 SS 2PL and SS 2LRP Locking Switch Sets 19 Initial Power up procedure 23 Chapter 5 Control Setup Web Page 24 OVERVIEW 24 Stat...

Страница 4: ...ing Instructions 43 RPC Quickstart Guide 45 RPCR Quickstart Guide 47 RPC Contact Closure Wiring Instructions 49 Appendix B RS 232 and TCP IP Protocols 51 RS 232 Protocol 51 Addressing Scheme 51 Breake...

Страница 5: ...e communications network or from dry contact inputs Acceptable communications protocols include TCP IP RS 232 sACN and DMX 512 RS 485 optional OVERVIEW Chapter 1 Introduction CONTENTS Each RPC comes s...

Страница 6: ...r Indicator LED signal the receipt and transmission of DMX When DMX is enabled the control page is disabled B OFF Button Turns all breakers off C ON Button Turns all breakers on D RS 232 Port Control...

Страница 7: ...r is transmitting data to the local right control bus V Left RX LED Flashes when the controller is receiving data from the local left control bus W Left Control Bus Port Connects the controller to the...

Страница 8: ...e and four C Control Input Receives control signal from control board D Control Bus Indicator Indicates that the control busses on panel two three or four have power E Data transmission indicator Indi...

Страница 9: ...sing device to confirm that power is off Replace all devices doors and covers before turning on power to this equipment Before energizing panelboard all unused spaces must be filled with blank fillers...

Страница 10: ...er 4 Wiring 4 Access the web page by entering the IP address or NetBIOS name into web browser on the aforementioned computer Chapter 5 Control Setup 5 Complete the panel setup Chapter 5 Control Setup...

Страница 11: ...ransformer in the RPCR For additional RPCR wiring skip to page 14 To initially wire the RPC follow these easy steps Figure 4 1 Power Supply Steps four five and six are completed at the factory The ins...

Страница 12: ...eaker control busses to ensure the connectors are properly seated 10 Replace the dead front pan and cover with door ADDITIONAL CONTROL OPTIONS Figure 4 1 Multi Panel Expander Additional circuit boards...

Страница 13: ...te the remaining two conductors in the Right Bus B and Right Bus A positions of the Right Bus screw terminal header 3 Using two cut lengths of 18 AWG wire install jumpers from Left Bus and to Right Bu...

Страница 14: ...maximum The center terminal of each Digital I O header is used as a 24VDC source The input terminal is triggered when connected through a remote device to the 24VDC source The output terminal activat...

Страница 15: ...ition and the negative terminal is wired to the OUT position of Digital I O Port 1 3 When the Normally Open contacts are closed the status indicator will immediately light and all breakers that have b...

Страница 16: ...tion and the negative terminal is wired to the OUT position of Digital I O Port 6 3 When the Normally Open contacts are closed the status indicator will immediately light and all breakers that have be...

Страница 17: ...air cable from the RS 232 source to the Controller RS 232 three position spring clamp header Terminate receive ground and transmit from left to right in the header RS 485 connector is reserved for use...

Страница 18: ...mper the C pin of the ON switch to the pin ii Connect the Input terminal arrow pointing towards header to the NO pin of the ON switch iii Connect the Output terminal arrow pointing away from header to...

Страница 19: ...the ON switch ii Connect the pin on the on switch to the 1 pin on the lock iii Connect the Input terminal arrow pointing towards header to the NO pin of the ON switch iv Connect the Output terminal ar...

Страница 20: ...ls Slave Control Controller Power B 12 OUT IN 3 4 T N L P M S2 S3 S4 C DMX Input I O MPE I O I O I O I O RS 232 Input I O L BusR BusP WR A Analog Cat 5e IN OUT 1 2 3 4 5 6 1 2 3 DMX 512 1 2 3 4 5 6 7...

Страница 21: ...65k AIR MJG32225 Main Breaker options Part suffix MHG3110 MHG3125 MJG3150 MJG3175 MJG3200 all 65k Amp Interrupt Rating Main Breaker wire 3 0 350 kcmil Aluminum or Copper 200 Neutral has one feed lug t...

Страница 22: ...139 0498 0222 Chapter Four Wiring 22 Figure 4 13 RPCR 32 Mechanical Drawing Relay Driver Power supply I O Power 20 34...

Страница 23: ...steadily The Buffer STATUS LED will be constantly lit when the unit has been fully charged The Controller LCD display and orange Power LED should illuminate If installed the orange Power LED s on the...

Страница 24: ...rs cannot be manipulated from this page This page allows the user to manipulate individual breakers as well as breaker zones All ON OFF and Hurry Off commands can also be triggered from this page The...

Страница 25: ...password fields is pw Enter the desired username in the first field password without spaces or symbols in the second and then retype the password again in the third field When ready click the Update L...

Страница 26: ...dules pages at any time ensure the desired buttons have been selected and then click the Print Pages button to the right Please print a copy for your records after setup is complete This screen shows...

Страница 27: ...net TCP IP for setup but can be controlled in conjunction with RS 232 sACN or DMX 512 protocols RS 232 For RS 232 operation use the following steps Select a baud rate in the dropdown box from 300 to 1...

Страница 28: ...re control for that breaker zone Although breaker zone status may still be monitored by web browser or smartphone DMX and sACN are exclusive and cannot be used on the same controller at the same time...

Страница 29: ...te operation To setup breakers follow these steps 1 Under Setup go to the Panels tab 2 After breakers are installed by a qualified electrician click the Scan Breakers button Motorized breakers are rep...

Страница 30: ...nto zones Breakers in zones can be toggled at 25 ms intervals Grouped Operation at variable intervals Sequenced Operation or via DMX or sACN To setup a Zone follow these steps 1 Choose which zone you...

Страница 31: ...DMX and sACN may not be used within the same RPC Figure 5 7 Figure 5 7 Name the Zone Choose operation type from the dropdown 4 If using DMX or sACN operation select the address set Figure 5 8 or unive...

Страница 32: ...e DMX and sACN zones default to individual addressing If you choose All Available the entire panel or panels will change to DMX or sACN 7 For sequenced operation select a delay time from the dropdown...

Страница 33: ...on to do a blind test breakers will not actually toggle Please note that delay times larger than one second are reduced to one second in Test Mode for expediency Figure 5 12 10 Disable zones that are...

Страница 34: ...t the direction for addressing DMX only Figure 5 15 GLOBAL PREFERENCES SETUP This section guides you through the setup process for the many features and preferences in your RPC system Labeling In addi...

Страница 35: ...breakers off rapidly without sequencing E Shutoff Turns selected breakers off when external contacts or emergency management system activates uses I O CC 1 E Lighting Turns selected breakers on when e...

Страница 36: ...hecking the yellow box next to the breaker Select breakers to turn off in the event of a fire or other emergency by checking the red box next to the breaker The status of unchecked breakers will remai...

Страница 37: ...ime and off time buttons using pull down menu and clicking the pick button to select 4 Assign weekend S S on and off times by clicking on time and off time buttons using pull down menu and clicking th...

Страница 38: ...he Onboard field on the Controller is automatically assigned to that 1 Rename each contact closure as desired 2 Select contact closure action type 3 Use CC Module 1 and CC Module 2 only if I O Expande...

Страница 39: ...nges button at the top of the Onboard I O box 6 Follow the previous instructions for assigning a contact closure to a zone selecting the merged ports 7 Click the Save Changes button in the upper left...

Страница 40: ...previous page The remaining contacts under the heading Trigger Controls are the outputs relays transistors or a combination of both Configure the Trigger Controls as follows 1 Rename each contact clos...

Страница 41: ...lert Setup Follow these steps to set an email alert 1 Go to Setup Alerts tab 2 Enter email addresses 3 Select alert types tripped breaker BO EO EL On Recovery and or Temperature 4 If using Temperature...

Страница 42: ...he page Once on the CONTROL page simply click each breaker for individual control Or click a zone for zone control All Breakers ON and All breakers OFF commands can also be executed from this page Usi...

Страница 43: ...RPS Wiring Instructions Left Bus B Left Bus A Twisted Pair Communication Power Slave Panel 2 Slave Panel 3 Slave Panel 4 Controls Power Right Bus B Right Bus A Slave Common Slave 24VDC Twisted Pair B...

Страница 44: ...s strip the cable sheath back approximately 20 inches Cut the conductors for Left Bus B Left Bus A and down to approximately 4 inches and terminate them in the Left Bus screw terminal header from left...

Страница 45: ...light check chapter 4 of the RPC manual to see that circuit boards are connected properly 4 Connect a computer to the control board using a CAT5 crossover cable OR connect the RPC to your network If c...

Страница 46: ...tus page via the IP address of the RPC ex http 192 168 1 250 The default username is admin and the initial password is pw If desired set your username and password on the Setup Home page under the Set...

Страница 47: ...omputer to the control board using a CAT5 crossover cable OR connect the RPC to your network If connecting via a crossover cable With a computer directly connected to the RPC through the Ethernet port...

Страница 48: ...atus page via the IP address of the RPC ex http 192 168 1 250 The default username is admin and the initial password is pw If desired set your username and password on the Setup Home page under the Se...

Страница 49: ...left edge of the Controller board as follows A Connect the 24VDC Common center terminal of the I O port to the C pin of the ON switch B Connect the Input terminal arrow pointing towards header to the...

Страница 50: ...CC Schedule choose which contact closure to assign to any zone using the drop down box B Enable the zone by selecting Sequenced or Grouped operation under Name Seq C Save changes 8 Verify proper opera...

Страница 51: ...status identifier 200 0xC8 Zone status identifier 201 0xC9 Event status identifier 202 0xCA Emergency override identifier 203 0xCB Checksum identifier 204 0xCC Checksum digits 205 214 0xCD 0xD6 Stop...

Страница 52: ...akers status 0xB0 0xB6 0xF0 Request breakers status 0xB0 0xBD breaker _address_i breaker _address_j breaker _address_n 0xF0 breaker_address_1 breaker_address_n addresses of breakers status of which is...

Страница 53: ...mat is identical to 3 9 except i 1 11 Breaker status description 4 bits 3 5 6 panels only Value 1 2 3 4 5 6 Status Off On Tripped Faulty Empty Manual On Activate zone 0xB0 0xB7 zone_number_1 zone_numb...

Страница 54: ...its 7 6 status of zone 4i bits 5 4 status of zone 4i 1 bits 3 2 status of zone 4i 2 bits 1 0 status of zone 4i 3 i 1 3 Zone status description 2 bits Value 1 2 3 Status Off On Sequencing Event ON 0xB0...

Страница 55: ...request event status command status of all 2 events 0xB0 0xBC status_byte 0xF0 status_byte bits 3 2 status of event 2 bits 1 0 status of event 1 Event status description 1 bit Value 1 2 3 Status Off...

Страница 56: ...stem is facilitated by the use of the HTTP GET command In the example below GET the RPC s IP address Example of GET command GET p2 rpc IPB002 1 Three modes of control are Breaker control B Zone contro...

Страница 57: ...system GET p2 rpc The system will return the following breakers 10110111111111111111 zones 111111111011 events 1000000 The above return is displaying the status of a 20 circuit breakers system in whic...

Страница 58: ...e NFPA 70E Carefully inspect the work area for tools and objects that may have been left inside the equipment Use caution while removing or installing panels so that they do not extend into the energi...

Страница 59: ...uit breaker Manual mode is engaged Restore the circuit breaker to Auto mode by engaging the white button located on the face of the circuit breaker Input is not connected or wired properly Verify that...

Страница 60: ...xpander Board Master Controller Optional Digital I O Expander Boards Power Supply Buffer and Voltage Transducer Feed 2 0 max Isolated Technical Ground Bar 46 positions 14 4 ga Feed 4 0 max Square D NF...

Страница 61: ...he panelboard Remotely Operated Circuit Breakers provide the same overcurrent protection as standard circuit breakers and have an integral operator that can remotely switch the circuit breaker ON and...

Страница 62: ...gure D 4 Buffer The buffer stores DC power and discharges it during a brownout or power loss condition to turn off selected breakers up to four panels This is a capacitive buffer and is lead and acid...

Страница 63: ...circuit breakers to control up to 167 remotely operated branch circuits The built in web server allows for easy setup and operation Also it provides input channels for connecting external dry contact...

Страница 64: ...Web Server DMX in thru 3 wire RS 232 3 wire Circuit breaker delay 0 025 sec to 8 min selectable Environmental Standards Operating Temperature 5 C to 65 C internal panelboard temperature Storage Tempe...

Отзывы: